75F40120R00012_0005 Attachment 1 Site Visit 3 Minutes.pdf

PDF 99 KB Posted

Attached to
NCTR Road & Drainage Improvements
Solicitation number
FDA-RFP-75F40120R00012
Issued by

About this file

This document summarizes the minutes from Site Visit #3 for the NCTR Road & Drainage Improvements opportunity. The site visit was conducted by Thomas Baioni of the FDA's Office of Facilities Engineering and Mission Support Services and convened at 9:35am Central Standard Time on November 2, 2020, adjourning at 11:25am. Eight contractors attended the visit, representing construction and landscaping firms. The site visit provided a walkthrough for clarifications on Site Visit #2.

The related federal contract opportunity is solicitation number FDA-RFP-75F40120R00012 for NCTR Road & Drainage Improvements issued by the Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services. Per the request for proposal and CDC guidelines, all attendees are required to wear face coverings for any scheduled site visits or entry will be denied.

View the file

Other files

File Type Posted
Attachment J13 - Solar Powered Flagpole Lighting Specification.pdf PDF
Attachment J11 - 75F40120R00012 Section B through M Updates rev. 11-13-20.pdf PDF
75F40120R00012_0006.pdf PDF
75F40120R00012_0005.pdf PDF
Attachment J11 - 75F40120R00012 Section B through M Updates rev. 10 Nov 20.pdf PDF
Attachment J5 - Sample Client Letter 11-10-2020.pdf PDF
Attachment J12 - Drawing BKC-3615-F-801-16.pdf PDF
75F40120R00012_0005 Attachment 2 Site Visit 3 Questions Answers.pdf PDF
Attachment J11 - 75F40120R00012 Section B through M Updates rev. 29 Oct 20.pdf PDF
75F40120R00012_0004.pdf PDF
75F40120R00012_0004 Attachment 2 Site Visit 2 Questions Answers.pdf PDF
75F40120R00012_0004 Attachment 1 Site Visit 2 Minutes.pdf PDF
75F40120R00012_0003 Final.pdf PDF
Attachment J5 - Sample Client Letter 10-9-2020.pdf PDF
Attachment J11 - 75F40120R00012 Section B through M Updates.pdf PDF
75F40120R00012_0002 Final.pdf PDF
Attachment J4 - US Department of Labor General Decicsion AR20200166 dtd. 5-1-2020.pdf PDF
75F40120R00012_0001 Final.pdf PDF
Attachment J1 - Project Manual.pdf PDF
Attachment J5 - Sample Client Letter.pdf PDF
Attachment J2 - Drawings.pdf PDF
Attachment J8 - HHS Subcontracting Plan Template.docx DOCX document
75F40120R00012.pdf PDF
Attachment J7 - FDA Form 3398 Commitment to Protect Non-Public Information .pdf PDF
CDC - Cloth Face Covering Instructions.pdf PDF
Attachment J10 - COVID19 Visitor Questionnaire at JL.docx DOCX document
Attachment J6 - Past Performance Evaluation Questionnaire.pdf PDF
Attachment J3 - Cost Proposal Bid Schedule.pdf PDF
Attachment J9 - Certification of Current Arkansas State Contractors License.pdf PDF
Attachment J4 - US Department of Labor General Decicsion AR20200166 dtd. 1-3-2020.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 ‐ Site Visit #3 Minutes

NCTR ‐ Road & Drainage Improvements

75F40120R00012

November 2, 2020

Present:

I. Contractors (8):

1. Ryan Anderson ‐ Redstone Construction Group

2. Christopher Powers ‐ AVCOR Construction

3. Phillip Amerson – Amerson Services, Inc

4. Nelson Carden – Carden Farms

5. Reginald Cato – Cato’s Trucking & Asphalt Paving

6. Greg Day – Cranford Construction

7. Brandon Harlan, Noacon Inc.

8. Harvey Harrington – Harrington Landscaping

The Site Visit convened at 9:35 am Central Standard Time (CT), November 2, 2020.

Thomas Baioni (Atl COR), Office of Facilities Engineering and Mission Support Services (OFEMS), then conducted a site walk through for Site Visit #2 clarifications.

Site Visit # 3 adjourned at 11:25 am CT.

File details come from the government source that posted it. Updated .