FA9301-17-R-0008_Amendment_0001.pdf

PDF 232 KB Posted

Attached to
Painting and Coatings Services Federal contract opportunity
Solicitation number
FA9301-17-R-0008
Issued by
Department of the Air Force Materiel Command Test Center

About this file

FA9301-17-R-0008 Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Painting and Coatings Services, newest first.
File Type Posted
FA9301-17-R-0008_Questions_and_Answers_(2).pdf PDF
QandA_Atch_2_-_AF_Symbol_Sample.JPG JPG image
QandA_Atch_3_-_B8370_Pic_(Length).jpg JPG image
Atch_7_(L-3),_Seed_Project_SOW_and_Material_Submittals_Rev_1.pdf PDF
FA9301-17-R-0008_Questions_and_Answers.pdf PDF
QandA_Atch_3_-_B8370_Pic_(Width).jpg JPG image
QandA_Atch_1_-_Contract_Progress_Schedule_Sample.pdf PDF
Seed_Project_Pictures.pdf PDF
Pre-Proposal,Base_Tour,Site_Visit_Sign-In.pdf PDF
Pre-Proposal_Conference_Briefing_Slides.pdf PDF
Atch_8_(L-4),_Seed_Project_Pricing_Template.xlsx XLSX spreadsheet
Atch_1,_Basic_Contract_SOW.pdf PDF
Atch_4,_Wage_Determination_-_Los_Angeles_County.pdf PDF
Solicitation_FA9301-17-R-0008_(SF_1442).pdf PDF
Atch_2,_2017_Edwards_AFB_Design_Standards.pdf PDF
Atch_5_(L-1),_ELIN_Pricing_Template.xlsx XLSX spreadsheet
Atch_12_(L-8),_Subcontractor_Teaming_Partner_Consent_Form.pdf PDF
Atch_11_(L-7),_Past_Performance_Questionnaire_(PPQ).pdf PDF
Atch_3,_Wage_Determination_-_Kern_County.pdf PDF
Atch_10_(L-6),_Past_Performance_Information_Form_(PPIF).docx DOCX document
Atch_7_(L-3),_Seed_Project_SOW_and_Material_Submittals.pdf PDF
Atch_6_(L-2),_Estimated_Workload.xlsx XLSX spreadsheet
Atch_9_(L-5),_Construction_Progress_Schedule_Template.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Section J - Revised Attachment 7 (L-3), Seed Project Statement of Work (SOW) and Schedule of Material Submittals, to incorporate scope of w ork measurements breakdow n, lead reports, and revised Schedule of Materials Submittals. The revised SOW is dated 10 Jul 2017.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA930117R0008

X 9B. DATED (SEE ITEM 11)

16-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Jul-2017

CODE

AFTC/PZIOC - FA9301

GUILLERMO MARTINEZ - 5 SO WOLFE AVE

EDWARDS AFB CA 93524

FA9301 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA930117R0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF DOCUMENTS

Attachment # Title Date Number of Pages

1. Basic Contract Statement of Work (SOW) 20 Apr 2017 35

2. 2017 Edwards AFB Design Standards Jan 2017 97

3. Wage Determination - Kern County (CA170031) 02 Jun 2017 29

4. Wage Determination - Los Angeles County (CA170033) 02 Jun 2017 27

5. L-1. Exhibit Line Item Number (ELIN) Pricing Template No Date 15 (3/year)

6. L-2. Estimated Workload No Date 3

7.

L-3. Seed Project Statement of Work (SOW) and Schedule of Material Submittals 10 Jul 2017

18 (SOW)

1 (Schedule)

8. L-4. Seed Project Pricing Template No Date 3

9. L-5. Construction Progress Schedule Template No Date 2

10. L-6. Past Performance Information Form (PPIF) No Date 2

11. L-7. Past Performance Questionnaire (PPQ) 16 Jun 2017 6

12. L-8. Subcontractor_Teaming Partner Consent Form No Date 1

(End of Summary of Changes)

File details come from the government source that posted it. Updated .