Atch_6_(L-2),_Estimated_Workload.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Painting and Coatings Services Federal contract opportunity
Solicitation number
FA9301-17-R-0008
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Atch 6, Estimated Workload

View the file

Other files for this federal contract opportunity

Other files attached to Painting and Coatings Services, newest first.
File Type Posted
FA9301-17-R-0008_Questions_and_Answers_(2).pdf PDF
QandA_Atch_2_-_AF_Symbol_Sample.JPG JPG image
FA9301-17-R-0008_Questions_and_Answers.pdf PDF
QandA_Atch_3_-_B8370_Pic_(Width).jpg JPG image
QandA_Atch_1_-_Contract_Progress_Schedule_Sample.pdf PDF
FA9301-17-R-0008_Amendment_0001.pdf PDF
QandA_Atch_3_-_B8370_Pic_(Length).jpg JPG image
Atch_7_(L-3),_Seed_Project_SOW_and_Material_Submittals_Rev_1.pdf PDF
Seed_Project_Pictures.pdf PDF
Pre-Proposal_Conference_Briefing_Slides.pdf PDF
Pre-Proposal,Base_Tour,Site_Visit_Sign-In.pdf PDF
Atch_4,_Wage_Determination_-_Los_Angeles_County.pdf PDF
Solicitation_FA9301-17-R-0008_(SF_1442).pdf PDF
Atch_8_(L-4),_Seed_Project_Pricing_Template.xlsx XLSX spreadsheet
Atch_1,_Basic_Contract_SOW.pdf PDF
Atch_3,_Wage_Determination_-_Kern_County.pdf PDF
Atch_10_(L-6),_Past_Performance_Information_Form_(PPIF).docx DOCX document
Atch_7_(L-3),_Seed_Project_SOW_and_Material_Submittals.pdf PDF
Atch_9_(L-5),_Construction_Progress_Schedule_Template.xlsx XLSX spreadsheet
Atch_2,_2017_Edwards_AFB_Design_Standards.pdf PDF
Atch_5_(L-1),_ELIN_Pricing_Template.xlsx XLSX spreadsheet
Atch_12_(L-8),_Subcontractor_Teaming_Partner_Consent_Form.pdf PDF
Atch_11_(L-7),_Past_Performance_Questionnaire_(PPQ).pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Year 1

PAINTING & COATINGS ID/IQ SOLICITATION
FA9301-17-R-0008
ESTIMATED WORKLOAD PER EXHIBIT LINE ITEM NUMBER (ELIN), ALL YEARS
ELIN #DESCRIPTIONUNIT OF MEASUREEST. QTY YEAR 1EST. QTY YEAR 2EST. QTY YEAR 3EST. QTY YEAR 4EST. QTY YEAR 5
EXTERIOR
X001Apply Primer Coat (1 coat) includes surface prepSF500,000500,000500,000500,000500,000
X002Apply Finish Coat to Walls, Soffits, Duct Work & Mech Equipment Exterior (2 coats)SF500,000500,000500,000500,000500,000
X003Apply Finish Coat to Doors and Door Frames (2 coats)SF30,00030,00030,00030,00030,000
X004Apply Finish Coat to Window Frames and Sash (2 coats)SF5,0005,0005,0005,0005,000
X005Apply Finish Coat to Fascia including gutters and downspouts (2 coats)SF50,00050,00050,00050,00050,000
X006Apply Finish Coats to Railings (2 coats)LF5,0005,0005,0005,0005,000
X007Apply Finish Coat to Ladders, grills and Steel Stairs (2 coats)SF2,0002,0002,0002,0002,000
X008Apply Coarse Texture Coat to match existingSF1,0001,0001,0001,0001,000
X009Replace Metal Gutter and downspouts with pre-finished metalLF2,0002,0002,0002,0002,000
X00AReplace Rotted or Deteriorated Wood FasciaSF5,0005,0005,0005,0005,000
X00BBold Helvitica numbers/lettersSF4,0004,0004,0004,0004,000
X00CStucco, 3 coat, 1" thick, including lath, metal and accessories (whole structure)SY4,0004,0004,0004,0004,000
X00DStucco Repair, 3 coat, to match existing, including lath, metal and accessories (patching or whole wall <10 sy)SY4,0004,0004,0004,0004,000
X00EInstall Pre-Finished (colored) Sheetmetal Siding complete finished installationSF4,0004,0004,0004,0004,000
INTERIOR
X00FApply Prime Coat (1 coat) includes surface prepSF50,00050,00050,00050,00050,000
X00GInterior walls, 2 coatsSF52,50052,50052,50052,50052,500
X00HInterior ceilings, 2 coatsSF2,5002,5002,5002,5002,500
X00JInterior Flat Door incl Frames and Trim, 2 coats paintedSF2,5002,5002,5002,5002,500
X00KInterior Flat Door incl Frames and Trim, both sides, stained and 2 finished coats. Includes Surface Preparation.SF1,5001,5001,5001,5001,500
X00LInterior Louvered Doors, incl frame and trim, two finish coatsSF1,5001,5001,5001,5001,500
X00MInterior Raised Panel Door incl Frames and Trim, 2 coatsSF1,5001,5001,5001,5001,500
X00NInterior Raised Panel Door incl Frames and Trim, 2 finish coatsSF100100100100100
X00PWindows, Interior Side, 2 finish coatsSF7575757575
X00QWindows, Interior Side, 2 finish coats, over 6 litesSF7575757575
X00RGrillsSF100100100100100
X00STrim (baseboards, casings, crowns, etc.), including surface preperation, up to 6" wide, painted or stained 2 coatsLF500500500500500
X00TDrywall, patch repair, type, thickness, taped and textured to match existing, less than 32 SF, wallsSF500500500500500
X00UDrywall, patch repair, type, thickness, taped and textured to match existing, greater than 32 SF, wallsSF250250250250250
X00VDrywall, patch repair, type, thickness, taped and textured to match existing, less than 32 SF, ceilingSF250250250250250
X00WDrywall, patch repair, type, thickness, taped and textured to match existing, greater than 32 SF, ceilingSF250250250250250
X00X1/2" or 5/8" Drywall, full wall installation on existing framing, taped, textured, corner beads and all accessoriesSF1,5001,5001,5001,5001,500
X00Y1/2" or 5/8" Greenboard Drywall, full ceiling installation on existing framing, taped, textured, corner beads and all accessoriesSF250250250250250
X00ZWall Paper RemovalSF500500500500500
X010Wall TexturingSF5,0005,0005,0005,0005,000
X011Replace existing acoustic ceiling tilesSF3,5003,5003,5003,5003,500
X012Replace damaged drywall partition including wood or steel studs (complete)SF250250250250250
X013Skim-coat drywall surfaces with joint compound after wall covering removalSF400400400400400
ABATEMENT
X014Asbestos AbatementSF2,0002,0002,0002,0002,000
X015Lead Based Paint AbatementSF3,0003,0003,0003,0003,000
X016Asbestos/Lead paint/texture abatement ExteriorSF3,0003,0003,0003,0003,000
X017Lead containing/based road marking paint removalSF3,0003,0003,0003,0003,000
X018Sampling and Testing for Lead and or Asbestos (per sample)EA500500500500500
FLOOR COATING
X019Epoxy Floor Coating with non-skid on concrete surface including minor surface preparationSF28,50028,50028,50028,50028,500
X01AEpoxy Floor Coating 85% solids with non-skid, chemical resistant, on concrete surface minor surface prepSF80,00080,00080,00080,00080,000
X01BConductive elastomeric Floor Coating with non-skid on concrete surface with minor surface prepSF20,00020,00020,00020,00020,000
X01CPrep and re-seal expansion joints up to 1" width x 1" depthLF4,0004,0004,0004,0004,000
X01DHardwood Flooring, sanding and finishing, 2 coats polyurethaneSF4,0004,0004,0004,0004,000
X01EAircraft hangar floor coating 100% solids with non-skid including minor surface preparationSF25,00025,00025,00025,00025,000
X01FAircraft hangar floor striping <6" wide including surface prepLF7,5007,5007,5007,5007,500
X01GElectro-statice dissipative flooring system for laboratoriesSF42,36542,36542,36542,36542,365
ROAD MARKINGS AND STRIPING
X01HStriping on concrete and asphalt with type 1 reflective beads, includes airfield, parking and roads, up to 4"LF2,5002,5002,5002,5002,500
X01JStriping on concrete and asphalt with type 3 reflective beads, includes airfield, parking and roads, up to 4"LF5,0005,0005,0005,0005,000
X01KStriping on concrete and asphalt with type 1 reflective beads, includes airfield, parking and roads, up to 12"LF5,0005,0005,0005,0005,000
X01LStriping on concrete and asphalt with type 3 reflective beads, includes airfield, parking and roads, up to 12"LF5,0005,0005,0005,0005,000
X01MRoad markings paint letters, numbers, symbols, etc. with reflective beadsSF250250250250250
X01NRoad marking paint removal non-leadSF500500500500500
X01PRunway Markings with 12lb glass beads (per 100 square feet)SF500500500500500
TANKS
X01QTanks, water/fuel exterior solid color (2 finish coats)SF25,00025,00025,00025,00025,000
X01RTanks, water exterior checkerboard (2 finish coats)SF25,00025,00025,00025,00025,000
X01STanks, fuel interiorSF1,0001,0001,0001,0001,000
X01TTanks, water interiorSF35,00035,00035,00035,00035,000
X01UEnergy efficient paint for tank exteriors including prime, prep and two coatsSF3,0003,0003,0003,0003,000
X01VTemporary Water Storage tanks (while existing water tank is painted) 5000 galMO44444
INSPECTION
X01WExterior Paint Inspection, includes condition of surface, life expectancy, square footage of painted areas (according to ELIN items) and recommendationsSF480,500480,500480,500480,500480,500
X01X4"-6" Epoxy wall cove base installed along with epoxy floor coatingsLF2,0002,0002,0002,0002,000
X01YApply Anti-static wax to hangar floors to make new epoxy static resistantSF25,00025,00025,00025,00025,000
X01ZConcrete floor repairs, floating and patching 1/4" thicknessSF5,0005,0005,0005,0005,000
X020Drafting/Engineering layouts for parking and striping plansSF5,0005,0005,0005,0005,000
X021Install 4" rubber cove base on wallsLF500500500500500
X022Install 6" rubber cove base on wallsLF250250250250250
FLOORING DEMOLITION
X023Demo existing 12"x12" VCT flooringSF5,0005,0005,0005,0005,000
X024Demo existing ceramic tile with thinsetSF5,0005,0005,0005,0005,000
X025Demo carpet including scrapingSF3,0003,0003,0003,0003,000
X026Bead-blast concrete floorsSF20,00020,00020,00020,00020,000
X027Concrete grinding, polishing with diamond floor grinder includes removal of epoxy flooringMSF3333333333
X028Hydro-blasting (water blasting)SF40,00040,00040,00040,00040,000
X029Sand-blastingSF16,00016,00016,00016,00016,000
TANK MAN-WAYS
X02ACut and install new access man-door in tank to meet code (small including gasket)EA22222
X02BCut and install new access man-door in tank to meet new codes (large including gasket)EA22222
X02CConfined space monitoring and rescue-ready team on standby when painting inside of tanksDAY1515151515
LIFT EQUIPMENT
X02DSwing-stage man-lift to 60ft with cables and 500# capacityMO22222
X02EScaffolding (1-5 stories)CSF200200200200200
X02FTwo-man lift to 25ft heightMO22222
X02G40' Boom LiftMO22222
X02H60' Boom LiftMO22222
X02J80' Boom LiftMO55555
MISCELLANEOUS
X02KFurniture moving (labor only - two men) to move appliances, furniture and equipment in order to paint the area (includes replacing items to their original location)DAY1010101010
X02LTrim Tree Branches to allow painting when next to building (up to 24" dia.)EA1515151515
X02MTrim Shrubbery around buildings to allow for painting (under 3ft shrub)EA2525252525
X02NChain Link Fence Rental (6ft ht)LF600600600600600
X02PBase sign road signs, 5'x4'x7'-6" high with wood framing and double postsEA1515151515
X02QElectrician labor (Journeyman Level) to disconnect equipment from shop floors for paintingMH55555
X02RPlumber labor (Journeyman Level) to disconnect fixtures from bathrooms for painting and flooring workMH55555
X02SPower wash (1500-2500 psi)SF200,000200,000200,000200,000200,000
X02TEquipment FuelGAL150150150150150
X02UInstall Air Force Symbol 5' to 10' diameter (includes complete fabrication of symbol and preparation, priming, and installion of symbol with protective coating)EA33333
X02VInstall Air Force Symbol 11' to 20' diameter (includes complete fabrication of symbol and preparation, priming, and installion of symbol with protective coating)EA33333
X02WInstall Air Force Symbol 21' to 30' diameter (includes complete fabrication of symbol and preparation, priming, and installion of symbol with protective coating)EA33333

FA9301-17-R-0008 PAINTING AND COATINGS ID/IQ SOLICITATION

ESTIMATED WORKLOAD

&P FA9301-17-R-0008 PAINTING AND COATINGS ID/IQ SOLICITATION

ATTACHMENT 6 (L-2)

ESTIMATED WORKLOAD

File details come from the government source that posted it. Updated .