About this file

Atch 8, Seed Project Pricing Template

View the file

Other files for this federal contract opportunity

Other files attached to Painting and Coatings Services, newest first.
File Type Posted
FA9301-17-R-0008_Questions_and_Answers_(2).pdf PDF
FA9301-17-R-0008_Amendment_0001.pdf PDF
QandA_Atch_3_-_B8370_Pic_(Length).jpg JPG image
Atch_7_(L-3),_Seed_Project_SOW_and_Material_Submittals_Rev_1.pdf PDF
FA9301-17-R-0008_Questions_and_Answers.pdf PDF
QandA_Atch_3_-_B8370_Pic_(Width).jpg JPG image
QandA_Atch_1_-_Contract_Progress_Schedule_Sample.pdf PDF
QandA_Atch_2_-_AF_Symbol_Sample.JPG JPG image
Seed_Project_Pictures.pdf PDF
Pre-Proposal,Base_Tour,Site_Visit_Sign-In.pdf PDF
Pre-Proposal_Conference_Briefing_Slides.pdf PDF
Atch_1,_Basic_Contract_SOW.pdf PDF
Atch_2,_2017_Edwards_AFB_Design_Standards.pdf PDF
Atch_5_(L-1),_ELIN_Pricing_Template.xlsx XLSX spreadsheet
Atch_12_(L-8),_Subcontractor_Teaming_Partner_Consent_Form.pdf PDF
Atch_11_(L-7),_Past_Performance_Questionnaire_(PPQ).pdf PDF
Atch_3,_Wage_Determination_-_Kern_County.pdf PDF
Atch_10_(L-6),_Past_Performance_Information_Form_(PPIF).docx DOCX document
Atch_7_(L-3),_Seed_Project_SOW_and_Material_Submittals.pdf PDF
Atch_6_(L-2),_Estimated_Workload.xlsx XLSX spreadsheet
Atch_9_(L-5),_Construction_Progress_Schedule_Template.xlsx XLSX spreadsheet
Atch_4,_Wage_Determination_-_Los_Angeles_County.pdf PDF
Solicitation_FA9301-17-R-0008_(SF_1442).pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Seed Project Pricing

PAINTING & COATINGS ID/IQ SOLICITATION
FA9301-17-R-0008
SEED PROJECT PRICING TEMPLATE
ELIN #DESCRIPTIONUNIT OF MEASUREPROPOSED PRICE*QUANTITYEXTENDED PRICE
EXTERIOR
A001Apply Primer Coat (1 coat) includes surface prepSF$ - 0
A002Apply Finish Coat to Walls, Soffits, Duct Work & Mech Equipment Exterior (2 coats)SF$ - 0
A003Apply Finish Coat to Doors and Door Frames (2 coats)SF$ - 0
A004Apply Finish Coat to Window Frames and Sash (2 coats)SF$ - 0
A005Apply Finish Coat to Fascia including gutters and downspouts (2 coats)SF$ - 0
A006Apply Finish Coats to Railings (2 coats)LF$ - 0
A007Apply Finish Coat to Ladders, grills and Steel Stairs (2 coats)SF$ - 0
A008Apply Coarse Texture Coat to match existingSF$ - 0
A009Replace Metal Gutter and downspouts with pre-finished metalLF$ - 0
A00AReplace Rotted or Deteriorated Wood FasciaSF$ - 0
A00BBold Helvitica numbers/lettersSF$ - 0
A00CStucco, 3 coat, 1" thick, including lath, metal and accessories (whole structure)SY$ - 0
A00DStucco Repair, 3 coat, to match existing, including lath, metal and accessories (patching or whole wall <10 sy)SY$ - 0
A00EInstall Pre-Finished (colored) Sheetmetal Siding complete finished installationSF$ - 0
INTERIOR
A00FApply Prime Coat (1 coat) includes surface prepSF$ - 0
A00GInterior walls, 2 coatsSF$ - 0
A00HInterior ceilings, 2 coatsSF$ - 0
A00JInterior Flat Door incl Frames and Trim, 2 coats paintedSF$ - 0
A00KInterior Flat Door incl Frames and Trim, both sides, stained and 2 finished coats. Includes Surface Preparation.SF$ - 0
A00LInterior Louvered Doors, incl frame and trim, two finish coatsSF$ - 0
A00MInterior Raised Panel Door incl Frames and Trim, 2 coatsSF$ - 0
A00NInterior Raised Panel Door incl Frames and Trim, 2 finish coatsSF$ - 0
A00PWindows, Interior Side, 2 finish coatsSF$ - 0
A00QWindows, Interior Side, 2 finish coats, over 6 litesSF$ - 0
A00RGrillsSF$ - 0
A00STrim (baseboards, casings, crowns, etc.), including surface preperation, up to 6" wide, painted or stained 2 coatsLF$ - 0
A00TDrywall, patch repair, type, thickness, taped and textured to match existing, less than 32 SF, wallsSF$ - 0
A00UDrywall, patch repair, type, thickness, taped and textured to match existing, greater than 32 SF, wallsSF$ - 0
A00VDrywall, patch repair, type, thickness, taped and textured to match existing, less than 32 SF, ceilingSF$ - 0
A00WDrywall, patch repair, type, thickness, taped and textured to match existing, greater than 32 SF, ceilingSF$ - 0
A00X1/2" or 5/8" Drywall, full wall installation on existing framing, taped, textured, corner beads and all accessoriesSF$ - 0
A00Y1/2" or 5/8" Greenboard Drywall, full ceiling installation on existing framing, taped, textured, corner beads and all accessoriesSF$ - 0
A00ZWall Paper RemovalSF$ - 0
A010Wall TexturingSF$ - 0
A011Replace existing acoustic ceiling tilesSF$ - 0
A012Replace damaged drywall partition including wood or steel studs (complete)SF$ - 0
A013Skim-coat drywall surfaces with joint compound after wall covering removalSF$ - 0
ABATEMENT
A014Asbestos AbatementSF$ - 0
A015Lead Based Paint AbatementSF$ - 0
A016Asbestos/Lead paint/texture abatement ExteriorSF$ - 0
A017Lead containing/based road marking paint removalSF$ - 0
A018Sampling and Testing for Lead and or Asbestos (per sample)EA$ - 0
FLOOR COATING
A019Epoxy Floor Coating with non-skid on concrete surface including minor surface preparationSF$ - 0
A01AEpoxy Floor Coating 85% solids with non-skid, chemical resistant, on concrete surface minor surface prepSF$ - 0
A01BConductive elastomeric Floor Coating with non-skid on concrete surface with minor surface prepSF$ - 0
A01CPrep and re-seal expansion joints up to 1" width x 1" depthLF$ - 0
A01DHardwood Flooring, sanding and finishing, 2 coats polyurethaneSF$ - 0
A01EAircraft hangar floor coating 100% solids with non-skid including minor surface preparationSF$ - 0
A01FAircraft hangar floor striping <6" wide including surface prepLF$ - 0
A01GElectro-statice dissipative flooring system for laboratoriesSF$ - 0
ROAD MARKINGS AND STRIPING
A01HStriping on concrete and asphalt with type 1 reflective beads, includes airfield, parking and roads, up to 4"LF$ - 0
A01JStriping on concrete and asphalt with type 3 reflective beads, includes airfield, parking and roads, up to 4"LF$ - 0
A01KStriping on concrete and asphalt with type 1 reflective beads, includes airfield, parking and roads, up to 12"LF$ - 0
A01LStriping on concrete and asphalt with type 3 reflective beads, includes airfield, parking and roads, up to 12"LF$ - 0
A01MRoad markings paint letters, numbers, symbols, etc. with reflective beadsSF$ - 0
A01NRoad marking paint removal non-leadSF$ - 0
A01PRunway Markings with 12lb glass beads (per 100 square feet)SF$ - 0
TANKS
A01QTanks, water/fuel exterior solid color (2 finish coats)SF$ - 0
A01RTanks, water exterior checkerboard (2 finish coats)SF$ - 0
A01STanks, fuel interiorSF$ - 0
A01TTanks, water interiorSF$ - 0
A01UEnergy efficient paint for tank exteriors including prime, prep and two coatsSF$ - 0
A01VTemporary Water Storage tanks (while existing water tank is painted) 5000 galMO$ - 0
INSPECTION
A01WExterior Paint Inspection, includes condition of surface, life expectancy, square footage of painted areas (according to ELIN items) and recommendationsSF$ - 0
A01X4"-6" Epoxy wall cove base installed along with epoxy floor coatingsLF$ - 0
A01YApply Anti-static wax to hangar floors to make new epoxy static resistantSF$ - 0
A01ZConcrete floor repairs, floating and patching 1/4" thicknessSF$ - 0
A020Drafting/Engineering layouts for parking and striping plansSF$ - 0
A021Install 4" rubber cove base on wallsLF$ - 0
A022Install 6" rubber cove base on wallsLF$ - 0
FLOORING DEMOLITION
A023Demo existing 12"x12" VCT flooringSF$ - 0
A024Demo existing ceramic tile with thinsetSF$ - 0
A025Demo carpet including scrapingSF$ - 0
A026Bead-blast concrete floorsSF$ - 0
A027Concrete grinding, polishing with diamond floor grinder includes removal of epoxy flooringMSF$ - 0
A028Hydro-blasting (water blasting)SF$ - 0
A029Sand-blastingSF$ - 0
TANK MAN-WAYS
A02ACut and install new access man-door in tank to meet code (small including gasket)EA$ - 0
A02BCut and install new access man-door in tank to meet new codes (large including gasket)EA$ - 0
A02CConfined space monitoring and rescue-ready team on standby when painting inside of tanksDAY$ - 0
LIFT EQUIPMENT
A02DSwing-stage man-lift to 60ft with cables and 500# capacityMO$ - 0
A02EScaffolding (1-5 stories)CSF$ - 0
A02FTwo-man lift to 25ft heightMO$ - 0
A02G40' Boom LiftMO$ - 0
A02H60' Boom LiftMO$ - 0
A02J80' Boom LiftMO$ - 0
MISCELLANEOUS
A02KFurniture moving (labor only - two men) to move appliances, furniture and equipment in order to paint the area (includes replacing items to their original location)DAY$ - 0
A02LTrim Tree Branches to allow painting when next to building (up to 24" dia.)EA$ - 0
A02MTrim Shrubbery around buildings to allow for painting (under 3ft shrub)EA$ - 0
A02NChain Link Fence Rental (6ft ht)LF$ - 0
A02PBase sign road signs, 5'x4'x7'-6" high with wood framing and double postsEA$ - 0
A02QElectrician labor (Journeyman Level) to disconnect equipment from shop floors for paintingMH$ - 0
A02RPlumber labor (Journeyman Level) to disconnect fixtures from bathrooms for painting and flooring workMH$ - 0
A02SPower wash (1500-2500 psi)SF$ - 0
A02TEquipment FuelGAL$ - 0
A02UInstall Air Force Symbol 5' to 10' diameter (includes complete fabrication of symbol and preparation, priming, and installion of symbol with protective coating)EA$ - 0
A02VInstall Air Force Symbol 11' to 20' diameter (includes complete fabrication of symbol and preparation, priming, and installion of symbol with protective coating)EA$ - 0
A02WInstall Air Force Symbol 21' to 30' diameter (includes complete fabrication of symbol and preparation, priming, and installion of symbol with protective coating)EA$ - 0
TOTAL$ - 0
*The prices in this column must match the Offeror's proposed prices for Year 1 as listed on Attachment 5 (L-1) of their proposal.
Contractor may remove unused ELINs if desired.

FOR OFFICIAL USE ONLY

SEE FAR 2.101 AND 3.104

&P FA9301-17-R-0008 PAINTING AND COATINGS ID/IQ SOLICITATION

ATTACHMENT 8 (L-4)

SEED PROJECT PRICING TEMPLATE FOR OFFICIAL USE ONLY

SEE FAR 2.101 AND 3.104

File details come from the government source that posted it. Updated .