Atch_1,_Basic_Contract_SOW.pdf

PDF 746 KB Posted

Attached to
Painting and Coatings Services Federal contract opportunity
Solicitation number
FA9301-17-R-0008
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Atch 1, Basic Contract Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Painting and Coatings Services, newest first.
File Type Posted
FA9301-17-R-0008_Questions_and_Answers_(2).pdf PDF
QandA_Atch_2_-_AF_Symbol_Sample.JPG JPG image
FA9301-17-R-0008_Amendment_0001.pdf PDF
QandA_Atch_3_-_B8370_Pic_(Length).jpg JPG image
Atch_7_(L-3),_Seed_Project_SOW_and_Material_Submittals_Rev_1.pdf PDF
FA9301-17-R-0008_Questions_and_Answers.pdf PDF
QandA_Atch_3_-_B8370_Pic_(Width).jpg JPG image
QandA_Atch_1_-_Contract_Progress_Schedule_Sample.pdf PDF
Seed_Project_Pictures.pdf PDF
Pre-Proposal,Base_Tour,Site_Visit_Sign-In.pdf PDF
Pre-Proposal_Conference_Briefing_Slides.pdf PDF
Atch_4,_Wage_Determination_-_Los_Angeles_County.pdf PDF
Solicitation_FA9301-17-R-0008_(SF_1442).pdf PDF
Atch_8_(L-4),_Seed_Project_Pricing_Template.xlsx XLSX spreadsheet
Atch_2,_2017_Edwards_AFB_Design_Standards.pdf PDF
Atch_5_(L-1),_ELIN_Pricing_Template.xlsx XLSX spreadsheet
Atch_12_(L-8),_Subcontractor_Teaming_Partner_Consent_Form.pdf PDF
Atch_11_(L-7),_Past_Performance_Questionnaire_(PPQ).pdf PDF
Atch_3,_Wage_Determination_-_Kern_County.pdf PDF
Atch_10_(L-6),_Past_Performance_Information_Form_(PPIF).docx DOCX document
Atch_7_(L-3),_Seed_Project_SOW_and_Material_Submittals.pdf PDF
Atch_6_(L-2),_Estimated_Workload.xlsx XLSX spreadsheet
Atch_9_(L-5),_Construction_Progress_Schedule_Template.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA9301-17-R-0008 PAINTING AND COATINGS ID/IQ SOLICITATION

BASIC CONTRACT STATEMENT OF WORK (SOW)

ATTACHMENT 1

STATEMENT OF WORK

FOR

PAINTING & COATINGS

INDEFINITE DELIVERY/

INDEFINITE QUANTITY (ID/IQ)

CONTRACT

AT

AIR FORCE TEST CENTER

EDWARDS AIR FORCE BASE, CALIFORNIA

20 APR 2017

FA9301-17-R-0008

TABLE OF CONTENTS

1.0 SCOPE OF WORK 3

2.0 PROJECT REQUIREMENTS 3

3.0 CONTRACTOR PERSONNEL 4

4.0 OFFICE SITE 5

5.0 PERFORMANCE TIMES 6

6.0 SUBMITTALS 7

7.0 STANDARD PRODUCTS 8

8.0 BASE REQUIREMENTS 9

9.0 INSURANCE LIABILITY 19

10.0 GOVERNMENT FURNISHED ITEMS 19

11.0 CONTRACTOR FURNISHED ITEMS AND SERVICES 20

12.0 CONDITIONS OF WORK 20

13.0 CONSTRUCTION SITE MAINTENANCE 21

14.0 INSPECTIONS, QUALITY CONTROL, WORKMANSHIP, AND TESTING 22

15.0 WARRANTY 23

16.0 ORDERING PROCEDURES 23

17.0 TASK ORDER PRICING 25

18.0 COMMENCEMENT, PROSECUTION, COMPLETION, AND PAYMENT FOR WORK 26

ATTACHMENT 1 - QUALITY CONTROL PLAN 30

APPENDIX A - TYPES OF WORK 33

APPENDIX B - MAPS 34

1.0 SCOPE OF WORK:

1.1 This is an indefinite delivery/indefinite quantity (ID/IQ) contract for painting and coating requirements at Edwards Air Force Base (AFB), CA as well as Air Force Plant 42 (in Palmdale, CA) and NASA (Military Family Housing at Edwards AFB is privatized and excluded from the scope of this contract; see Appendix B). The Contractor shall furnish all management, personnel, vehicles, supplies, equipment, etc. required to perform work such as, but not limited to: applying paint; priming and applying/maintaining protective coatings on various facilities, surfaces, water/fuel tanks, monuments, and signs; minor abatement of lead and asbestos; and minor drywall, plumbing, and electrical work (see Appendix A).

1.2 Individual projects will be processed as Task Orders (TOs) which will be awarded/issued against the basic contract and will be executed in accordance with (IAW) the basic contract’s terms/conditions and this Statement of Work (SOW), as well as each individual TO’s SOW, required submittals per the Schedule of Material Submittals, and any other items identified in each TO.

1.3 The following intent is provided within this document to assist the Contractor with understanding the purpose of this SOW. The below sections are not intended to provide a minimum or maximum amount of work required. Specific scopes of work will be provided in individual TOs.

2.0 PROJECT REQUIREMENTS:

2.1 Location and Site Plan. Edwards AFB is comprised of main Base, the Air Force Research Laboratory (AFRL), and NASA. The work under this contract includes these areas as well as all other areas within the Base and Air Force Plant 42 in Palmdale, CA. The location and site plan for each project will be provided with each TO’s Request for Proposal (RFP).

2.2 Standards, Codes, and Regulations. All Contractor work shall meet quality standards listed in manufacturers’ instructions and shall follow the manufacturers’ recommended application methods. It is the Contractor’s responsibility to ensure that all work performed is IAW all Air Force, federal, state, county, and local statutes, laws, codes, regulations, safety requirements, instructions, manuals, handbooks, guidance, and policy letters.

2.2.1 The specifications and standards set forth in the terms and conditions of this contract and subsequent TOs include, but are not limited to:

2.2.1.1 The National Emission Standards for Hazardous Air Pollutants (NESHAP);

2.2.1.2 Environmental Protection Agency (EPA) Regulations and Codes;

2.2.1.3 Unified Facilities Guide Specification (UFGS) Codes;

2.2.1.4 American Society for Testing and Materials (ASTM);

2.2.1.5 National Fire Protection Association (NFPA);

2.2.1.6 National Electrical Code (NEC);

2.2.1.7 International Building Code (IBC);

2.2.1.8 International Mechanical Code (IMC);

2.2.1.9 Edwards AFB Design Standards; and

2.2.1.10 Asbestos and Lead Management Plans.

2.2.2 It is the Contractor’s responsibility to ensure that all subcontractors have proper permits, notifications, manufacturer certifications/agreements, and appropriate general and state licenses required to fulfill requirements described in this SOW.

2.2.3 The most stringent code, standard, or regulation shall apply in all cases. Deviations from the code, standard, or regulation can only be approved by the Contracting Officer (CO) in writing. In addition, all work shall be performed in a professional manner by journeyman craftsmen certified in the trade in which they are employed.

2.2.4 Printed copies of Air Force manuals, publications, and guide specifications will not be furnished. They may be acquired from Government websites or other Base agencies. The current Edwards AFB Design Standards will be provided as an attachment to the basic contract.

2.3 The scope of work requires the Prime Contractor to hold a California Contractors State License Board issued class B contracting license. The Prime Contractor shall have the capability to accomplish painting services with paint subcontractors who hold a class C33 contracting license. Additionally, the Prime Contractor may subcontract in any specialty area, as long as subcontractors have the correct licenses for specialty areas.

2.3.1 The Prime Contractor shall submit proof of a California Contractors State License Board issued class B contracting license to the CO within 30 calendar days after date of contract award.

3.0 CONTRACTOR PERSONNEL:

3.1 The Contractor shall perform adequate background checks on all employees to validate U.S.

citizenship and to validate that employees are legally allowed to work in the U.S. Employees shall not have prior felonies or outstanding warrants of any kind. Naturalized citizens are required to bring their naturalization certificate to be eligible to apply for a Base access pass IAW Department of Defense Federal Acquisition Regulation Supplement (DFARS) 252.203- 7001, Prohibition on Persons Convicted of Fraud or Other Defense Contract-Related Felonies.

3.2 The Contractor shall ensure that all employees and subcontractor employees have current, valid licenses and certifications necessary to perform their functions. Any cost or time associated with obtaining licenses or certifications shall be at the Contractor’s expense.

3.2.1 All work shall be performed in a professional manner by journeyman craftsmen certified in the trade in which they are employed.

3.2.2 The Contractor shall ensure that all employees are trained and qualified to operate specialized equipment such as a scissor lift, “hi-lo”, welder, or any other specialized equipment as required by industry standards. The Contractor shall provide proof of qualifications and/or certifications to the CO when requested.

3.2.3 The Contractor shall immediately replace any individual not in compliance with the terms and conditions as set forth within this section.

3.2.4 The Contractor shall not employ any person who is currently or formerly an employee of the U.S. Government, if the employment of that person would create a conflict of interest.

3.3 Contract Manager. The Contractor’s Contract Manager (CM) shall be responsible for the overall performance of this contract and shall possess the necessary experience to provide direct oversight of all project design and planning activities. The CM shall have full authority to act for the Contractor. The CM shall provide overall contract management, including full authority to develop TO proposals, negotiate and sign TOs, and provide subcontract purchasing and administration. The CM and alternates, who shall act for the Contractor when the CM is absent, shall be designated prior to commencement of work in writing to the CO.

Subcontractors may not perform duties of the CM. The CM shall be able to speak, understand, and read the English language. The CO must be able to contact this individual at all times by phone or e-mail to discuss any project.

3.4 Superintendent. The Contractor’s Superintendent shall provide on-site supervision and visit each active project site daily; submit periodic detailed progress reports (on AF Form 3065 or equivalent) for each TO; review material submittals; schedule and coordinate subcontractor and material suppliers, site visits, and inspections; and attend all status meetings, site visits, and pre-final/final inspections as required. Subcontractors may not perform duties of the Superintendent. The Superintendent shall be on-site during normal work hours and for contingencies requiring work beyond normal work hours. The Superintendent shall be able to speak, understand, and read the English language. The Superintendent shall ensure that a complete, current set of the contract documents and approved submittals are on the jobsite at all times.

3.4.1 Throughout the life of this contract, whenever there are active TOs, the Superintendent shall be available to meet within 120 minutes of notification by the CO or Government Program Manager (GPM) regarding any active project, and the CO must be able to contact this individual at all times by phone or e-mail. If there are multiple projects taking place at once, the Superintendent shall be present at the project that is most complex and/or has highest visibility as determined by the GPM.

3.5 The Contractor shall provide and maintain the following capabilities, at a local or remote office, to support this contract:

3.5.1 Cost Estimating/Negotiating. The Contractor shall provide estimating/negotiating support capable of producing accurate quantity reductions and cost proposals, within the time constraints specified.

3.5.2 Copying and Reproduction Capabilities. The Contractor shall be able to copy or reproduce all necessary drawings and contract documents required to support TOs.

3.6 Subcontractors.

3.6.1 All subcontractors shall be licensed in the State of California in their specialty where required.

3.6.2 The Contractor shall coordinate the work of subcontractors and shall ensure coordination of work between various trades. The Contractor is responsible for any subcontractor work performed. The Contractor shall study, examine, and evaluate the contract drawings to establish the work, coordination, or materials required and necessary to provide a product complete in the usual and customary manner, and shall provide for all such requirements as though expressly detailed herein or on the drawings.

3.7 Labor Requirements. The Contractor shall abide by the labor requirements/statutes required IAW Federal Acquisition Regulation (FAR) 22.403. Two Construction Wage Rate Requirements Statute wage determinations (to cover Kern County if work takes place at Edwards AFB and Los Angeles county if work takes place at Air Force Plant 42 in Palmdale, CA, which will be specified on individual TOs) apply to this contract and will be attached to the basic contract, to be used on all TOs issued against the basic contract.

4.0 OFFICE SITE:

4.1 A designated lot on Contractor Hill Road (also known as Contractor’s Row) will be provided to the Contractor by the Government at no expense to the Contractor as the official area for the Contractor for performance on this contract. The provided space shall only be used for performance of this contract. The designated lot will be used for the Contractor’s office trailer (to be provided by the Contractor), vehicle parking, and supply storage. All space unused by the Contractor shall be returned to the Government.

4.2 A specific space assignment will be designated after contract award via coordination with the Civil Engineering Community Planning Office, (661) 277-9456. A real estate instrument will be fully executed before the Contractor takes possession of the Government-owned space via coordination with the Real Property Accountable Officer, (661) 277-8877. The Contractor shall enter into a temporary no-cost license (not to exceed five years), and shall also conduct and provide an Environmental Baseline Survey prior to occupancy and upon vacating the area.

4.3 The Contractor shall be responsible for arranging all costs associated with connecting to Base utilities for electricity, water, and sewage service. All Base-level utility conversation practices or requirements shall be adhered to IAW Air Force Instruction (AFI) 90-1701, Energy Management. Costs incurred in connection with the facility shall be paid by the Contractor.

4.3.1 The Contractor shall be responsible for housekeeping of the entire designated lot, and no custodial support will be provided by the Government.

4.3.2 The Contractor shall comply with all recycling programs IAW AFI 32-7042, Waste Management. The Contractor shall provide recycling containers to collect white paper and cardboard.

4.3.3 The Contractor shall comply with all pest management programs IAW AFI 32-1053, Integrated Pest Management Program.

4.4 The office trailer shall comply with all applicable codes, regulations, and Base standards. The location, type, proposed maintenance, and other considerations shall be approved by the Edwards AFB Community Planning Office prior to moving onto the site. The Contractor shall use current Air Force guidelines (specifically AFI 32-1021, Planning and Programming Military Construction (MILCON) Projects, and AFI 32-9003, Granting Temporary Use of Air Force Real Property) to ensure initial utilization and any changes are within the scope of utilization, mission, and personnel.

4.5 The Government will only provide fire prevention and protection services. The Fire Department telephone extension is 911 for emergencies when calling from a Base telephone and

(661) 277-4540/4541 when calling from a cell phone.

4.6 The site office shall be manned as necessary as stated in Section 17.0, and shall have the Site Superintendent and/or CM on-site whenever there are active TOs.

4.7 Following contract expiration and/or written direction from the CO, whichever comes first, the Contractor shall remove (at no cost to the Government) their office trailer, vehicles, supplies, etc. from Contractor’s Row and have a fully operational temporary field office with all required facilities, staff, and capabilities to facilitate the completion of any outstanding TOs. The vacated space on Contractor’s Row shall be restored by the Contractor to the condition existing prior to the start of the contract.

4.8 Before final payment is paid on the last TO, the Contractor shall contact the Civil Engineering Community Planning Office to schedule a move out inspection prior to leaving the site. Under no circumstances shall any trailers, portable buildings, conex type facilities, any other structures, supplies, etc. be left on-site once the contract has been completed. In addition, no waste or excess materials of any kind, non-hazardous or hazardous, shall be left on-site. The site will be reverted back to its original condition prior to its current use. Before departure, the Contractor shall contact the CO, GPM, and Community Planning Office for the final move out inspection before leaving the Base. Any deficiencies noted shall be corrected by the departing Contractor before vacating the space. Any uncorrected deficiencies could delay final payment on the final TOs.

5.0 PERFORMANCE TIMES:

5.1 The Government’s preferred total period of performance (PoP) will depend on the individual TO and will be specified in the RFP. The Contractor may propose a shorter or longer PoP in their proposal. Should the Contractor propose a longer PoP, the proposal must include justification for the longer PoP. The final PoP duration will be discussed during negotiations with the Contracting Office. The Contractor shall proceed with the project as stated in the TO’s SOW after the Notice to Proceed (NTP) is provided by the Government. The Contractor shall not postpone or interrupt their work performance unless official notice to that effect is provided to them by the CO.

5.1.1 The Contractor shall be able to handle anywhere from five (5) to 10 projects concurrently and in multiple locations (main Base, AFRL, AF Plant 42, etc.).

5.1.2 Performance periods shall not be extended due to insufficient resources.

5.2 TO projects shall start no later than 10 calendar days following issuance of the NTP.

Construction shall not be permitted to commence until submittals specified at the TO level have been reviewed by the Government and clearance issued to start construction via the NTP issued by the Contracting Office.

5.3 The first 30 calendar days following basic contract award shall be designated as a start-up period, after which the Contractor shall have all equipment and personnel in place to fully execute the requirements of this contract. The Government will conduct an indoctrination (Pre- Construction Conference) with the Contractor to cover ordering procedures, security requirements, environmental requirements, etc. following award of the basic contract.

6.0 SUBMITTALS:

6.1 The AF Form 66, Schedule of Material Submittals, will be issued with each TO’s RFP and will be incorporated as an attachment to each TO. The AF Form 66 will include all desired material submittals, such as material/shop drawings, material data sheets, warranty information, operation manuals, and construction drawings, along with respective due dates for a specific TO. If a copy of the AF Form 66 is not provided with the awarded TO, the Contractor shall request a copy from the Contracting Office.

6.1.1 Once an individual TO is awarded, the Contractor shall submit all required material/shop drawing submittals and project construction schedule (if required) to the CO within 10 calendar days for approval. No materials shall be used prior to approval.

6.1.2 All material submittals indicated on the AF Form 66 shall be attached to an AF Form 3000, Material Approval Submittal, with the TO project title, project number, and TO number clearly indicated. Three copies of each submittal shall be submitted to the CO for approval; one copy will be returned to the Contractor and shall be posted by the Contractor at the jobsite. The Contractor may submit a catalog of standard material data sheets for selected items that are used repetitively for projects – the catalog number for these items can be referenced on the Material Approval Submittal (AF IMT 3000) without attaching copies of the data sheets. Submittals shall be legible and shall include all technical data needed to verify that the item meets the requirement.

6.1.3 The Contractor shall submit construction record drawings (as-built drawings) for all new construction performed. Submit drawings two (2) weeks prior to acceptance of the project by the Government. If, upon review, the drawings are found to be in error or there are omissions, they will be returned to the Contractor for corrections. The Contractor will complete the corrections and return the drawings to the Government within 10 calendar days. Submit one (1) reproducible set of paper drawings on 30” x 42” paper and one (1) set of CD ROMS with the complete set of construction drawings in ‘AutoCAD’ version 2006 (or greater) format. Use a standard Corps of Engineers layering convention.

6.2 Payrolls. IAW FAR Clause 52.222-8, Payrolls and Basic Records, the Contractor shall submit to the Contracting Office copies of payrolls applicable to each TO for each week in which any contract work is performed as well as weekly payroll statements of compliance for the Contractor and each Subcontractor. The Contractor may use the U.S. Department of Labor form WH-347, Payroll, or a similar form that provides the same data and identical representation. The WH-347 form can be found at http://www.dol.gov/whd/forms/wh347.pdf. If the WH-347 form is used, a DD Form 879, Statement of Compliance, does not need to be provided; the DD Form 879 is only required if the WH-347 form is not used. The Prime Contractor is responsible for making sure the submittals are correct before submitting them to http://www.dol.gov/whd/forms/wh347.pdf the Contracting Office. Failure to submit payrolls may cause delays in payment. The final payroll must be marked “FINAL”. This information and a sample of the DD Form 879 will be included in each TO’s Pre-Construction Letter, issued with the NTP.

7.0 STANDARD PRODUCTS:

7.1 Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacture of such products, which are of a similar material, design, and workmanship. The Contractor shall furnish a Safety Data Sheet (SDS), formerly known as a Material Safety Data Sheet (MSDS), OSHA Form 20 or accepted equivalent, for each hazardous or potentially hazardous material or chemical utilized by the Contractor. This includes solvents and treated materials, such as preservative-treated wood (SDS for the preservative) or fungicide-treated rubber goods (SDS for fungicide). The CO and GPM must approve all materials prior to installation.

7.1.1 Green Procurement. The Green Procurement Program (GPP) is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services. Many different items are covered by the GPP.

Recycled-content products are designated by the Environmental Protection Agency (EPA). “Bio-based” products made from renewable plant materials are designated by the United States Department of Agriculture (USDA). Energy and water efficient products are designated by the Department of Energy (DOE). GPP also requires the Government to avoid purchasing Ozone Depleting Substances (ODS) and EPA-designated Priority Chemicals. Environmentally preferable purchasing (EPP) is a voluntary program, and it encourages the purchase of goods and services that have decreased effects on human health and the environment (compared to the competing goods and services that serve the same purpose), but are not already required by one of the mandatory GPP elements.

7.1.1.1 Green Procurement is mandated except when the Contractor can show that the product with recycled content does not meet intended specifications, has excessive cost, or cannot be delivered in time to support the schedule of the contract. If the Contractor is unable to locate a specified product meeting the GPP requirement, identify the issue to the CO or GPM for guidance. GPP is based on legal requirements and the Department of Defense facilities are subject to enforcement action if these requirements are ignored.

7.1.1.2 The Contractor shall make maximum use of products containing recovered materials that are EPA-designated items IAW FAR Clause 52.223-17, Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts. The list of EPA-designated items is available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program.

7.2 Technical instructions pertaining to the use or installation of products, materials, or equipment used or installed in the execution of work under this contract are furnished in response to a requirement stipulated herein, and form a part of these specifications as though specifically set forth herein. In the event of conflict between the specifications or drawings and technical instructions, the Contractor shall bring such conflict to the attention of the CO for resolution before proceeding with the work involved.

7.3 Non-Restrictive Specifications. References in the design specifications of this SOW and each TO’s SOW to equipment, material, articles, or patented processes by trade name, make, or catalog number shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the CO, is equal or exceeds the https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program requirement of these specifications, unless otherwise specifically provided in this SOW or individual TO SOW.

7.4 Prohibited Materials. The Contractor shall certify that products do not contain mercury, hexavalent chromium, toluene, chlorinated solvents, hydrolysable chlorine derivatives, ethylene based glycol ethers and their acetates, nor any carcinogen. When tested, the lead content shall not exceed 0.06% by weight of the dry film and the test for chromium content shall be negative. Additionally, devices at the work site such as cameras, computers, weapons, video and audio cassette players, recorders, binoculars, film, and computer media are prohibited.

7.5 Products from the following acceptable paint/coating manufacturers are the only acceptable products that can be used in performance of this contract:

7.5.1 Fuller O’Brien

7.5.2 Dunn-Edwards

7.5.3 Sherwin-Williams

7.5.4 Sinclair

7.5.5 Textured Coatings of America, Inc.

7.5.6 Crown Polymers

7.5.7 Texcote

7.5.8 Other: Substitutions will not be allowed without prior approval from the CO and GPM.

8.0 BASE REQUIREMENTS:

8.1 Base Access.

8.1.1 Short-term Base access. Contractor employees requiring temporary access must be vetted prior to entry. The process starts with the Prime Contractor’s request through the GPM or the CO, in that order, who will then load the employee’s information into the Vehicle Control Center’s (VCC) access database. Passes for a maximum of 72 hours can be can be picked up at any of the installation’s three gates after the employee has been pre-announced at least one day before arrival. If temporary access will be longer than 72 hours, the employee must be pre-announced at least 72 hours prior to arrival and can only pick up the Base pass at the VCC, Bldg. 1004 at the West Gate (Rosamond Blvd entrance). The individual must bring a valid vehicle registration and insurance and proof of ID (see more below on identity proofing documents). Note:

Contractor individuals coming through the West Gate cannot obtain a pass between the hours of 0600-0700.

8.1.2 Long-term Base access. For Contractor personnel who wish to obtain long-term Base access via an Air Force Materiel Command (AFMC) Form 496, Application for AFMC Identification Card, IAW Air Force Federal Acquisition Regulation Supplement (AFFARS) Clause 5352.242-9000, Contractor Access to Air Force Installations, the Prime Contractor shall prepare a written request on company letterhead which the Contractor employee will bring with them with their AFMC Form 496 to the Contracting Office in Building 2800 for processing: 1) contract number, 2) location of work, 3) expiration date (not to exceed one year from the date the AFMC Form 496 is signed), and 4) name of employee/subcontractor employee needing access to the base, to include the employee’s company name.

8.1.2.1 It is recommended that the Prime Contractor provide a copy of the request letter to each employee for verification purposes when the employee comes to the Contracting Office at Building 2800 to get their AFMC Form 496 signed. Employees for which no request letter can be found or provided will result in the employee being asked to return on another date/time so verification can be made.

8.1.2.2 The AFMC Form 496 will be reviewed/approved by the CO, then taken by the Contractor employee to the Edwards AFB Pass & Registration Office in Building 3000 for the security portion and issuance of the Base pass.

8.1.3 Only employees who will be working on the contract consistently/frequently should be submitted for a long-term Base pass.

8.1.4 Visitors/contractors with driver’s licenses from ME, MN, MO, MT, and WA (exceptions are EDL-Enhanced driver’s licenses from MN & WA) will not be able to obtain Base access without another form of identification as an identity proofing document. The list of authorized IDs can be found in the REAL ID Act of 2005. Please visit the Department of Homeland Security’s (DHS) website to get the latest information, https://www.dhs.gov/current-status-states-territories.

8.1.5 The Contractor shall comply with all security requirements imposed by the Installation.

Specific security considerations will be handled on an individual TO basis as required.

8.1.6 During performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel.

8.1.7 The Contractor shall be responsible for prompt return of credentials and vehicle passes for:

1) any employee who no longer requires access to the work site; 2) upon request by a CO; and

3) upon completion or termination of the contract. The Prime Contractor shall ensure that all Base identification passes issued to employees and subcontractor employees are returned to the issuing office. Failure to comply with these requirements may result in withholding of payment.

8.1.8 Restricted Area and Special Access Programs. The number of restricted area badges will be limited as determined by the Civil Engineering Security Manager.

8.1.9 All Contractor employees will be subject to a criminal history background check IAW Air Force Manual (AFMAN) 31-113, Installation Perimeter Access Control, as stipulated in the Installation Commander’s memorandum to the 412th Security Forces Office dated 23 Apr 2015 (the AFMAN and memorandum are both limited access documents but more details on the requirements/process in terms of background checks can be provided by the Contracting Office upon request). Vehicle registration, proof of insurance, and a valid driver's license must be presented for vehicles. Installation Commanders may deny access and credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline, and morale of the installation.

8.2 Disposal of Waste/Excess Material. Any waste or excess material resulting from any contract requirement shall be removed and disposed of at a proper disposal site off Edwards AFB by the Contractor in strict accordance with applicable Federal, state, county, and local laws. Disposal, discharge, deposit, dumping, spilling, leaking, or placing of any material, wastes, effluents, trash, garbage, oil, grease, paint, chemicals, etc., in areas other than proper disposal sites off Edwards AFB shall be subject to the approval of the CO. If any waste material is dumped in unauthorized areas, the Contractor shall remove the material and restore the area to the condition of the adjacent undisturbed area. Contaminated ground shall be excavated, disposed of as directed by the CO and in coordination with the Base Environmental Management Division Office, replaced with suitable fill material, compacted, and finished to match adjoining surfaces.

8.3 Trash and Litter Control. The Contractor shall develop a strict trash and litter control program.

The litter control program shall consist of supplying an adequate number of covered trash and litter receptacles in all appropriate locations. The Contractor shall take precautions to prevent Foreign Object Debris (FOD) while working on or around the flight line. The Contractor shall dispose of all trash IAW para. 8.2.

https://www.dhs.gov/current-status-states-territories

8.4 Landfill. The Contractor shall furnish the following information to the CO prior to work commencing on the first task order issued against this contract: 1) Name and address of the proposed landfill to be used for disposal of project related waste; 2) landfill class; and 3) proposed materials to be disposed of at this location.

8.4.1 This information is to be submitted for all materials to be disposed of by the Contractor, including hazardous waste as well as demolition debris, and shall be submitted and approved before construction work begins on the first task order. Copies of manifests and inventories of hazardous wastes that were disposed of during the course of the contract must be provided to 412 TW/CEV at the conclusion of the contract. The close-out submittal must contain all information required by the initial submittal.

8.5 Hazardous Materials.

8.5.1 Materials classified as hazardous by U.S. and California environmental rules, regulations, or laws shall be handled for disposal IAW those rules, regulations, or laws.

Any cost provisions to meet these requirements shall be the sole responsibility of the Contractor. Any project delay to meet these requirements shall also be the sole responsibility of the Contractor.

8.5.2 IAW FAR Clause 52.223-3, Hazardous Material Identification and Material Safety Data, the Contractor shall list any hazardous material to be delivered under this contract. For each item, the Contractor shall submit to the CO an SDS listing any hazardous material to be delivered under this contract prior to the hazardous material entering the installation. The Contractor may submit a master list of all hazardous material at the beginning of the contract’s performance, but must update the list throughout the life of the contract when needed if a new item needs to be added. The initial and any revised lists must be submitted to and approved by the CO prior to the material entering the installation.

8.5.3 All hazardous material shall be stored in a safe and environmentally responsible manner within construction sites and laydown yards.

8.5.4 Disposal of Hazardous Material. The Contractor shall comply with all Federal, state, and local laws pertaining to the protection of the environment and emission of hazardous pollutants in the performance of this contract. The Contractor shall also provide a copy to the CO and the Base Environmental Management Division Office of all correspondence with local, state, or Federal pollution control authorities. Any hazardous waste generated by the Contractor shall be the Contractor's responsibility to dispose of, IAW the above-mentioned laws, to include hauling all paint determined as hazardous waste to the nearest hazardous waste dump.

8.5.5 Spillage. Special measures shall be taken to prevent paints, chemicals, fuels, oils, grease, etc., from being spilled and particularly from entering surface or groundwater.

In the event of a paint, fuel, oils, or chemical spill, the Contractor shall immediately take containment measures to prevent the spill from migrating and/or entering the Base drainage system. Hazardous spill residue shall be disposed of IAW all local, state, and federal laws pertaining to the protection of the environmental and emission of hazardous pollutants in the performance of this contract. Non-hazardous spillage shall be disposed of off-Base IAW para. 8.2. All spills shall be reported as soon as possible to the Base Environmental Office and Base Safety Office at 277-1401 and 277-4640 respectively.

8.6 Environmental Pollution Prevention.

8.6.1 IAW FAR Clause 52.223-19, Compliance with Environmental Management Systems (EMS), the Contractor’s work under this contract shall conform with all operational controls identified in the applicable agency EMS and the Contractor shall provide monitoring/measurement information for the Government when requested. The 412th Test Wing maintains a conforming EMS. The services provided by this agreement fall within the scope of the EMS. Control of environmental pollution requires consideration of air, water, and land uses, and involves the management of noise, solid waste, thermal energy, and radioactive materials, as well as other pollutants. Environmental protection shall be provided during the life of the contract. The Contractor shall ensure compliance with FAR Clause 52.223-5, Pollution Prevention and Right-to-Know Information, and this contract shall conform with all operational controls identified in the applicable facility EMS and shall provide monitoring and measurement information necessary for the Government to address environmental performance relative to the goals of the EMS. Protective measures shall be incorporated to control pollution and/or correct environmentally impacting conditions that may develop resulting from this contract. Guidance is available from the 412th Civil Engineering Group, Environmental Management Division, (661) 277-1401.

8.6.2 Applicable Regulations. In order to prevent and to provide for abatement and control of any environmental pollution arising from the construction activities of the Contractor and any subcontractor employed by the Contractor in the performance of this contract, the Contractor shall comply with the applicable federal, state, and local laws and regulations concerning environmental, pollution control, and abatement in effect on the date of the solicitation. The Contractor shall also demonstrate leadership in preventing, controlling, and abating environmental pollution by supporting regional pollution abatement programs and by accelerating corrective measures to meet established standards and criteria.

8.6.3 Environmental Minimization Measures (Checklist). The Contractor shall comply with the most current Environmental Minimization Measures Checklist pertaining to each TO as stipulated in each TO’s SOW. During the course of construction, the Contractor shall have a quality control and oversight procedure to ensure the requirements of the environmental checklist are met and documented.

8.6.4 AFFARS Clause 5352.223-9001, Health and Safety on Government Installations. In performing work under this contract on a Government installation, the Contractor shall take all reasonable steps and precautions to prevent accidents and preserve the health and safety of Contractor and Government personnel performing or in any way coming in contact with the performance of this contract, and take such additional immediate precautions as the CO may reasonably require for health and safety purposes. The CO may, by written order, direct Air Force Occupational Safety and Health (AFOSH) Standards and/or health standards as may be required in the performance of this contract and any adjustments resulting from such direction will be IAW the Changes Clause of this contract. Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the CO, shall be grounds for termination of this contract in IAW the Default Clause of this contract.

8.7 Security, Vehicles, and Parking.

8.7.1 The Contractor shall follow existing security Base traffic and parking procedures and instructions applicable to Edwards AFB and AF Plant 42.

8.7.2 The Contractor shall be responsible for the physical security of all materials, supplies, and equipment, including property that is being utilized.

8.7.3 The Government shall not be held liable for any delays prior to the Contractor reaching the gate and notification that he is ready to proceed through the gate.

8.7.4 The Contractor’s employees’, suppliers’, and subcontractors’ vehicles shall not be parked on grass/landscaped surfaces at any time. In addition, vehicles may not be driven over grass/landscaped surfaces, unless indicated and approved by the GPM during the site visit or pre-construction conference.

8.7.4.1 Contractor vehicles shall be in top repair and be able to be shut off and restarted without outside aid. Vehicles in need of repair will be replaced not later than the following morning. Downed and unrepairable vehicles must be removed from the Base. If necessary, the Contractor shall provide a flatbed trailer and rig or a tow truck at their cost to remove the vehicle from the Base.

Vehicles will be in safe operating conditions at all times, have seatbelts, or will be denied access to the Base. At no time will Contractors perform routine maintenance on vehicles which would result in the dumping of any fluid onto the ground. The Contractor shall not transport rollers, paving equipment, or other slow moving construction equipment on and throughout Edwards AFB or AF Plant 42 unless it is loaded on a flatbed or lowboy.

8.7.5 The Contractor shall comply with all Base security regulations. Contractor personnel may be subject to inspection upon entering or leaving Edwards AFB. Additionally, the Contractor shall comply with actions dictated by force protection condition changes/measures for real world situation and Base exercises. Changes to force protection conditions could impact Contractor performance of work and can include denial of access to the installation to perform work.

8.7.6 The Contractor shall report suspicious activity to Security Forces at (661) 277-3340 in a timely manner. Contact the Antiterrorism Office, 412 SFS/ATO, at (661) 277-4009 for the Edwards AFB Contractor Antiterrorism Awareness pamphlet.

8.7.6.1 IAW AFI 10-245, Antiterrorism (AT), a one-time Level I Antiterrorism Awareness Training will be offered by the Government to all Contractor employees. This training provides Contractor employees with the requisite knowledge necessary to remain vigilant for possible terrorist threats. The requiring unit (412 CES/CEOH) will coordinate and track this training with the Contractor after contract award. Training can be taken at https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam.

8.7.7 Contractor employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within Contractor-owned or privately owned vehicle while on Edwards

AFB.

8.8 Vehicular Traffic.

8.8.1 Traffic Control Devices. The Contractor shall comply with the local laws and regulations, to include Air Force regulations, regarding the safe operation of equipment in and around roadways associated with the construction site. Contractor owned and/or operated vehicles violating speeding, parking, or traffic regulations on Federal Government grounds property may be removed from the installation at the Contractor’s expense. Should this be the case, the Government will not be held liable for the time delay to the Contractor nor such costs that might occur based on the vehicle removal.

8.8.1.1 The Contractor shall coordinate to ensure proper warnings to motorists are posted and adequate traffic control is used when vehicles are present. This shall be coordinated with the Contracting Office and approved by the GPM.

8.8.1.2 The Contractor shall address known traffic impedances within the site/location drawing and the safety plan. Coordinate submittal dates per the AF Form 66.

8.8.1.3 Signs, warning lights, barricades, and other traffic control devices shall be provided by the Contractor. Warning lights will be operational at all times https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam during non-daylight hours. Barricades shall be highly luminescent and clearly visible at night. Signs shall also be highly luminescent, blaze orange in color with black lettering, and be clearly visible from at least 50ft (15m) away.

8.8.1.4 Temporary traffic control signs (warning and hazard signs) shall be furnished and installed, at the discretion of the GPM, by the Contractor while projects are underway. These warning signs shall be placed near the beginning of the work site and well ahead of the work site for alerting approaching traffic from both directions. Slow-moving equipment shall be marked with large warning signs indicating slow-moving equipment in operation.

8.8.1.5 Road Diversions/Closures. The Contractor shall notify the GPM at least 15 business days prior to work if construction will impact traffic on the roadways.

The Contractor shall state in writing the exact dates of the road closure, duration of closure, and provide a traffic diversion map showing the location of the diversion (if available), closure, posting of signage, phasing plan (if applicable), and other pertinent information for the impedance.

8.8.1.6 All costs including, but not limited to, design, procurement, equipment, installation, maintenance and removal, associated with the temporary traffic control signs, barriers, barricades, warning lights, diversions, etc. are the sole responsibility of the Contractor.

8.9 Sanitary Provisions. The Contractor shall provide temporary toilets that satisfy Edwards AFB requirements for the use of project personnel. Location, type, proposed maintenance, etc., shall be approved by the GPM prior to placing toilets. Temporary toilets shall be removed at the completion of the project. All costs incurred in connection with the temporary toilets shall be paid by the Contractor.

8.10 Fire Prevention.

8.10.1 The prevention of fire is imperative during construction projects. The Contractor is responsible for enforcing fire safety in the work area.

8.10.2 The Contractor must report all fires to the Edwards AFB Fire Department. The Contractor must attempt to extinguish the fire only if it is safe to do so, and/or go to the nearest phone and notify the Fire Department at 911, and have someone meet the Fire Department upon arrival to provide additional information.

8.10.3 The Contractor shall have serviceable fire extinguishers readily available at all times.

8.10.4 Burning of trash and rubbish at the construction site is strictly prohibited.

8.10.5 The Contractor may not use gasoline or diesel fuel for cleaning parts or surfaces.

8.10.6 Electrical extension cords may be used on a temporary basis to power tools and equipment. Do not overload extension cords. Frayed, cut, or spliced extension cords are prohibited.

8.11 Site Safety.

8.11.1 Fire, Environmental, and Public Health Inspections. At any time the construction site and laydown yard (if applicable) can be inspected by the CO or GPM for fire, safety, environmental, or public health discrepancies. Any discrepancies noted shall be fixed immediately. If discrepancies cannot be fixed immediately, the Contractor shall remove the items from the installation. Any costs or time delays associated with correcting discrepancies are the sole responsibility of the Contractor.

8.11.2 The Contractor shall assume full responsibility and liability for compliance with the applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his part or that of his employees or subcontractors, which results in illness, injury, or death.

8.11.3 The Contractor shall conduct initial and periodic safety training for their employees, and ensure that all subcontractor employees have had proper safety awareness training.

8.11.4 The Contractor must comply with U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, IAW FAR Clause 52.236-13, Accident Prevention.

The Contractor shall comply with all federal, state, and local laws and Air Force Instructions for the protection of their employees while working on an Air Force Installation or property. The protection of Contractor employees is exclusively the obligation of the Contractor. The Contractor shall manage all work areas to ensure the safety of building occupants, Base personnel, and visitors in or near the areas.

8.11.5 The Contractor shall promptly report pertinent facts regarding mishaps involving reportable damage Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the CO. The Contractor shall provide a completed copy of an Accident Investigation Report (ENG Form 3394, United States Army Corps of Engineers Accident Investigation Report or Contractor equivalent) to the CO within five calendar days of completion.

8.11.6 IAW AFI 91-202 and AFMC Supplement to AFI 91-202, The U.S. Air Force Mishap Prevention Program, the Contractor shall submit a Safety and Health Plan and corresponding site safety checklist that describes the capabilities and processes to ensure compliance with safety and health requirements during the performance of the work described in the contract to the CO within 30 calendar days after contract award, for review/approval by the Edwards AFB Safety Office. The Contractor’s plan shall include appropriate measures to ensure the Contractor reacts promptly to investigate, correct, and track alleged safety and health violations and/or uncontrolled hazards in Contractor work areas. The plan shall:

8.11.6.1 Demonstrate a management commitment to employee safety and health;

8.11.6.2 Identify the application of the safety and health plan to subcontractors;

8.11.6.3 Identify the roles and responsibilities of the following individuals:

Management, Supervisors, Employees, and Safety Coordinator;

8.11.6.4 Identify applicable safety rules and regulations;

8.11.6.5 Include a worksite hazard analysis to include base-line hazard identification and required control measures;

8.11.6.6 Include a job site analysis to include hazards of tasks required to control measures;

8.11.6.7 Identify employee safety and health training requirements and the documentation process;

8.11.6.8 Include a workplace inspection frequency, to include identifying the individual conducting the inspections;

8.11.6.9 Include employee hazard reporting procedures;

8.11.6.10 Identify individual(s) responsible for corrective action hazards;

8.11.6.11 Identify first aid/injury procedures;

8.11.6.12 Identify procedures for accident investigation and reporting, to include mishap reporting procedures which result in damage to Government property or injury to Air Force personnel;

8.11.6.13 Identify emergency response procedures; and

8.11.6.14 Identify the process for tracking controlled hazards in Contractor work areas safety equipment.

8.11.6.15 Ensure the plan includes requirements relating to OSHA Form 300, Log of Work-Related Injuries and Illnesses, and OSHA Form 300A, Summary of Work-Related Injuries and Illness.

8.11.7 The Contractor shall ensure all Contractor and subcontractor personnel have personal safety equipment during performance of this contract. Safety equipment includes, among other things, shoes or boots, eyewear, respirators, hardhats, and gloves. The Contractor is responsible for establishing these requirements for all subcontractors who qualify as subcontractors under the resulting contract.

8.11.8 Jet Aircraft Noise. Jet aircraft operating on the runway and/or taxiways make the contract area a zone of high-level noise. The Contractor is advised to take the necessary precautions to protect him and his workers against ear injury while in the area.

8.11.9 Protection of Water Resources. The Contractor shall not pollute streams, lakes, or reservoirs with fuels, oils, bitumen, calcium chloride, painting materials, acids, or other…

This is the start of the file's text. The full file is on GovTribe.