RFP_-_Amendment_0002.pdf
PDF 59 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA9301-14-R-0011
About this file
RFP - Amendment 0002
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1S2AA3318A001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Continuation Sheet
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jun-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA9301-14-R-0011
X 9B. DATED (SEE ITEM 11)
30-May-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jun-2014
CODE
AFTC/PZIOC - FA9301
JACOB AROLA - 5 S. WOLFE AVE
EDWARDS AFB CA 93524
FA9301 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA9301-14-R-0011
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SECTION B CONTINUATION SHEET
BLOCK 14. DESCRIPTION OF AMENDMENT/MODIFICATION:
a. This amendment covers changes to the following: Section J-List of Attachments, and Section L – Instructions, Conditions, and Notices to Offerors or Respondents.
b. The details of the amendment are as follows:
i) Add a new Attachment General Decision CA140033 to Section J (page 30) as follows (Attachment 1 to this Amendment 0002) :
ATTACHMENT TITLE DATE NO. OF
PAGES
6 U.S. Department of Labor 20 June 2014 26 General Decision Number
CA140033
ii) Attachment 1 of this RFP titled SABER Statement of Work dated 6 March 2014 is superseded by Attachment 1 titled SABER Statement of Work (dated 24 June 2014). (Attachment 2 to this Amendment 0002).
iii) Attachment L-3 of this RFP titled Seed Project Statement of Work (undated) is superseded by Attachment L-3 titled Seed Project Statement of Work (dated 24 June 2014). (Attachment 3 to this Amendment 0002).
iv) Section L (Page 39 of the RFP) change the first sentence of paragraph C.3 (L-002
Proposal Preparation Instructions) to read as follows:
From “pitch” to read “point”.
v) Section L (Page 41 and 42 of the RFP) delete the entirety of paragraph 1.c. (Part I-Price Proposal) and paragraph 1.d (including Table L-2 (Coefficient Table Example) on page 42. This information has been replaced by SABER SOW dated 24 June 2014, para 10.2.7 through 10.3.
vi) Section L (Page 45 of the RFP) Changed the 5th line of paragraph 1.a Element 2-
2: Soundness of Approach to read as follows:
From “12” to read “48” on line 5 and “quantifies” to read “quantities” on line 7.
FA9301-14-R-0011
vii) RFP Attachment L-4 - Coefficient Information Paragraph B. (Factors that make up the Coefficient) is deleted in its entirety and replaced as follows:
“B. Factors that make up the Coefficient: Refer to paragraphs 10.2.7 through 10.3 of the SABER Statement of Work dated 24 June 2014.”
viii) The following attachments are hereby incorporated into this amendment:
1. Questions and Responses (Attachment 4 ).
2. Hazardous Material Survey for Soffit on Seed Project (Attachment 5).
3. Floor plan, front and side elevations and site plan for the Seed Project (Attachment 6).
4. Seed Project pictures (Attachment 7).
5. Attendee List and Pre-proposal Conference/Site Visit slides (Attachment 8).
c. The proposal due date of 4:00 PM 15 Jul 2014 remains unchanged.
File details come from the government source that posted it. Updated .