Attachment_8_(Attendee_List_Pre-Proposal_Conference_Site_Visit_Slides)_-_Amendment_0002.pdf
PDF 7 MB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA9301-14-R-0011
About this file
Attachment 8 (Attendee List_Pre-Proposal Conference_Site Visit Slides) - Amendment 0002
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor (Guest) Attendee List
Pre-Proposal Conference/Site Visit for Simplified Acquisition for Base Engineering Requirements (SABER) 13 June 2014 at 0815hrs
COMPANY NAME SIGNATURE
ACCU Construction, Inc. Dong Wang
ACCU Construction, Inc. Han-Choul Ryu
Ace Engineering, Inc. Robert Hinshaw
AMA Diversified Construction Group Mark Shreckengast
AMA Diversified Construction Group Peter Ocampo
Anderson Burton Construction, Inc Maynard Silva
Anderson Burton Construction, Inc Lawrence Green
Bara Infoware, Inc. Miguel Sandoval
Bara Infoware, Inc. Miguel Sandoval
Barkley Andross Corp. Bryan Barkley
Barkley Andross Corp. Gerod Andross
Barnhart-Reese Construction, Inc. Venu Dorapally
Betance Enterprises, Inc. Richard Thomas
Betance Enterprises, Inc. Thomas McGetrick
Bitech Construction Co., Inc. Benjamin Kim
Citiwide Engineering, Inc. Daniel June
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
FA9301-14-R-0011 - Amendment 0002
Pre-Proposal Conference/Site Visit for Simplified Acquisition for Base Engineering Requirements (SABER)
13 June 2014 at 0815hrs
COMPANY NAME SIGNATURE
C. Martin Company, Inc. John Martin
C. Martin Company, Inc. Kevin Martin
Command Performance Constructors James Chavez
Command Performance Constructors Marie Willis
Cyber Professional Solutions Corp. Joaquin Campos
Cyber Professional Solutions Corp. Maria Martinez
Diani Building Corp. Steve Gillean
Duran Construction Gil Duran
Equa Solutions Domingo Yruegas
Equa Solutions Dennis Hood
Exbon Development, Inc. Don Seo
Exbon Development, Inc. Jason Oh
Falcon Builders & Developers Inc. John Falcon
Good-Men Roofing & Construction, Inc. Robert Heinly
Good-Men Roofing & Construction, Inc. Brian Rick
Heffler Contracting Group Patrick Heffler
Heffler Contracting Group Michael Flood
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Pre-Proposal Conference/Site Visit for Simplified Acquisition for Base Engineering Requirements (SABER)
13 June 2014 at 0815hrs
COMPANY NAME SIGNATURE
Infinite Energy Construction James Howie
IPI Construction Long Nguyen
J. Torres Co., Inc. Joe Torres Jr.
Jacob Construction and Design Steve Thompson
KCM Electric Inc. Craig Hernandez
Lead Builders, Inc. Ronald Galaviz
LG Services Inc. Larry Green
Mirack Construction Dick Bunn
Mirack Construction Ben Smith
Pueblo Construction Maria Martinez
North Star Construction and Engineering, Inc. Zach Milner
North Star Construction and Engineering, Inc. Sarbjit Basrai
Ojai Contracting Group, Inc. Evonne Vacca
Ojai Contracting Group, Inc. Randy Davis
Onsite Construction & Engineering, Inc. Michael Conover
Premier Mechanical Group Michael Johnson
Red Mountain Construction John Garvey
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Pre-Proposal Conference/Site Visit for Simplified Acquisition for Base Engineering Requirements (SABER)
13 June 2014 at 0815hrs
COMPANY NAME SIGNATURE
Red Mountain Construction Matt Thomsen
RORE, Inc. Kyle Nguyen
Siemens Industry, Inc. Sarah Pangelinan
T. Simons Co., Inc. Anthony Arcidiacono
T. Simons Co., Inc. Tammy Simons
Tony Vacca Construction, Inc. Tony Vacca
Tony Vacca Construction, Inc. John Vacca
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Government Sign-in Sheet
Pre-Proposal Conference/Site Visit for Simplified Acquisition for Base Engineering Requirements (SABER) 13 June 2014 at 0815hrs
NAME OFFICE SYMBOL SIGNATURE
AFTC/PK
Ty Okuhara AFTC/PZIOC
Sun McGuinness AFTC/PZIOC
Jacob Arola AFTC/PZIOC
Lt. Daniel Carrillo AFTC/PZIOC
412 CE
Yvonne Davidson 412 CE/CENMP
Bob Lynch 412 CE/CENMP
Air Force Test Center
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
PRE-PROPOSAL CONFERENCE/SITE VISIT
SOLICITATION NO. FA9301-14-R-0011
SIMPLIFIED ACQUISITION OF BASE
ENGINEERING REQUIREMENTS (SABER)
13 June 2014
Program Manager: Yvonne Davidson Contracting Officer: Sun McGuinness
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Administrative
• Fire Exits and Rally Points
• Restrooms
• Break Area
• Copy of slides and the attendee list will be posted on FedBizOps
• https://www.fbo.gov
• FA9301-14-R-0011
FA9301-14-R-0011 - Amendment 0002 https://www.fbo.gov/
Briefers
• Requirement Overview Ms. Yvonne Davidson, Program Manager
412 CE/CENMP
• Contracting Overview Mr. Jacob Arola, Contract Specialist, AFTC/PZIOC
• Government Team
Agenda
0815 – 0830 Sign-In
0830 – 0845 Administrative Matters
0900 – 1000 Site Visit
1005 – 1100 Requirements & Contracting Overview
1100 – 1130 Questions & Answers
Purpose
• Site Visit for Seed Project
• Provide a visual overview of Edwards AFB’s Design Standards
• Fair and Open Communications
• Overview of the Source Selection Process
• Enhance Competition
• Facilitate Quality Proposals
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Formal Question Submissions
• Will respond to questions during Conference
• Questions requiring research will be answered on FedBizOps
• Question forms will be provided
• Formal answers will be posted on FedBizOps
• Questions posed after today submit via email to:
Jacob.Arola@us.af.mil and Suntok.McGuinness@us.af.mil
• Closing date for questions – 19 June, 4:00 PM PST
FA9301-14-R-0011 - Amendment 0002 mailto:Jacob.Arola@us.af.mil mailto:Suntok.McGuinness@us.af.mil
Site Visit
• Photography No Photography Allowed
• Write your questions down
• Short Break
• Buses
Requirements Overview
• The SABER contract is primarily responsible for the maintenance, repair, renovation/alteration, and minor construction of real property
• Broad Range of Construction disciplines to include (but not limited to):
– Roofing, paving, utilities, HVAC, design, carpentry, excavating, electrical, steam fitting, plumbing, sheet metal, painting, demolition, concrete masonry, and welding
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Requirements Overview
• The awardee will be required to furnish all labor
(including supervision and QA/Safety), materials, supplies, equipment, transportation, engineering and/or technical design and personnel necessary to manage and accomplish projects as described in each individual task orders and in accordance with applicable federal, state and local safety and environmental regulations.
• SABER will support the following locations:
– Edwards Air Force Base (EAFB) CA
– Air Force Plant 42 located in Palmdale, CA
– Air Force Research Laboratory (AFRL) site at EAFB
25 MILES-
MAIN BASE TO AFRL
35 MILES-
MAIN BASE TO PLANT 42
Requirements Overview
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Seed Project Seed Project will be the initial task order
• Provide separate pricing and technical proposals for the three separate sections for the Seed project
Part I - RPR ADA Access B2850 Part II - Exterior Closures and Electrical Work Part III - Landscaping
Contracting Overview
• Background
• Contracting Particulars
• Proposal Preparation Instructions
• Proposal Evaluation Criteria
• Milestones
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Background Previous contract scope:
• Previous contractor: Ace Engineering, Inc.
• Total Contract Scope: $100M
• Period of Performance (PoP): 21 Jan 04 – 5 Dec 13
• Firm Fixed Price (FFP)
• Indefinite Delivery Indefinite Quantity (IDIQ)
• Single Award
• Total Task Orders issued – 769 valued at
$99,682,410.93
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Contracting Particulars Current contract scope:
• Contract Type/Period of Performance
Firm Fixed Price
IDIQ
5 Years Contract Minimum – $10,000 Contract Maximum – $45,000,000 CLIN 0001 - SABER Basic (FFP) CLIN 0002 - 6 Month Option to Extend Services if required
(FFP)
• Competitive Procedures 8(a) Competitive Set-Aside for California (Bona fide place of business prior to submitting offer – ref. 13 CFR 124.507)
Contracting Particulars (cont’d)
• Bonds: Required on applicable Task Orders
– Payment Bonds 30k>150k
– Performance Bonds <150k
– Bid Guarantee not required
• Warranties: FAR 52.246-21, Warranty of
Construction
• Labor Laws: Davis-Bacon Wage Determination
• Performance Incentives: Construction Contractor
Appraisal Support System (CCASS) Reporting
Contracting Particulars (cont’d) Base support
Utilities - phone, water, sewage and electricity services at contractor’s expense
Building 3533 (Approximately 2,360 Sq. Ft.)
Building 3533 Parking lot (Approximately 8,364 Sq. Ft.)
Building 3533 Lay down Yard (224,334 Sq. Ft.)
Proposal Preparation Instructions Section Copies Page Limits
Part I – Price Proposal 3 Paper (1 Original + 2 Copies) + 1 Electronic
Unlimited
Part II – Technical Proposal 4 Paper (1 Original + 3 Copies) + 1 Electronic
40 Pages
Part III – Past Performance Information
4 Paper (1 Original + 3 Copies)+ 1 Electronic
Maximum of 4 contracts total for the proposed offeror (prime and/or subcontractors using Past Performance Information Form (Attachment L-1)). Limited to no more than 6 pages per contract.
Part IV – Contracts 2 Paper (1 Original + 1 Copy) + 1 Electronic
Unlimited
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Proposal Preparation Instructions
• Subcontractor Consent Forms
• Mentor/Protégé/Joint Venture Agreements
• Bona-fide office Determinations
• Past Performance Questionnaires
• Past Performance Information Forms
• Submit signed RFP AND ALL signed
Amendments
Evaluation Criteria
• Source Selection Procedures
• Performance Price Trade-off (PPT)
• Performance is approximately equal to price
• Evaluation Criteria:
• Cost/Price (STEP 1)
• Offeror will be ranked according to Price (Lowest to Highest Coefficient)
• The offer with the lowest proposed Coefficient will then be evaluated for technical acceptability
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
• In order to be Technically Acceptable, offerors must meet all subfactor requirements
• Technical Capability (Acceptable/Unacceptable)
(STEP 2)
• Subfactor 1: Conformance to RFP Requirements
– Proof of Bonding Capability
• Subfactor 2: Seed project proposal
– Reasonable Assumptions
– Soundness of Approach
• Lowest priced, technically acceptable offer will then be evaluated to determine the performance confidence assessment
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
• Past Performance (STEP 3)
• Recency
– Performance defined as being within 3 years from release of the RFP (Minimum of 6 months required from the issue date of solicitation to be considered recent)
• Maximum of 4 contracts for proposed Offeror (prime and/or subcontractors)
• Relevancy
– Will be determined by (listed in order of importance):
• Scope
• Magnitude/Complexity
• Contract Environment
• Contract Type
• Quality
– Tools used to assess quality in relevant contracts:
• Past Performance Questionnaires
• Past Performance Information Retrieval System (PPIRS)
• Construction Contractor Appraisal Support System (CCASS)
• Any other sources
Acquisition Planning
• Past Performance (STEP 3) Cont.
– If past performance is rated “Substantial Confidence”, evaluation is complete
– If the lowest priced offeror is not judged to have a “Substantial Confidence”, the next lowest priced offeror will be evaluated and the process will continue (in order by price) until an offeror is judged to have a “Substantial Confidence” performance assessment or until all offerors are evaluated.
• (STEP 4) The Source Selection Authority shall then make an integrated assessment, best value award decision.
Major Milestones
Issuance of Solicitation 30 May 2014
Pre-proposal Conference 13 June 2014
End date for Written Questions 19 June 2014
Proposal Due 15 July 2014
Contract Award 30 Sep 2014
Attachment 8 Attendee List & Pre-Proposal Conference/Site Visit Slides
Questions
| Air Force Test Center |
| Administrative |
| Briefers |
| Agenda |
| Purpose |
| Formal Question Submissions |
| Site Visit |
| Requirements Overview |
| Requirements Overview |
| Slide Number 10 |
| Seed Project |
| Contracting Overview |
| Background |
| Contracting Particulars |
| Contracting Particulars (cont’d) |
| Contracting Particulars (cont’d) |
| Proposal Preparation Instructions |
| Proposal Preparation Instructions |
| Evaluation Criteria |
| Evaluation Criteria |
| Evaluation Criteria |
| Acquisition Planning |
| Major Milestones |
| Questions� |
| Pre-Proposal Conference_Site Visit Attendees.pdf |
| Contractor (Guest) Attendee List |
| Pre-Proposal Conference/Site Visit for Simplified Acquisition for Base Engineering Requirements (SABER) |
| 13 June 2014 at 0815hrs |
| Government-Sign-In Sheet.pdf |
| Government Sign-in Sheet |
| Pre-Proposal Conference/Site Visit for Simplified Acquisition for Base Engineering Requirements (SABER) |
| 13 June 2014 at 0815hrs |
File details come from the government source that posted it. Updated .