Attachment_6_(Floor_Plan_Site_Plan_Site_Elevations)_-_Amendment_0002.pdf

PDF 2 MB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA9301-14-R-0011
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Attachment 6 (Floor Plan_Site Plan_Site Elevations) - Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Attachment_1_(Seed_Project_Pictures)_-_Amendment_0003_(1).pdf PDF
Attachment_4_(Required_Representations_and_Certifications_for_Offerors_not_registered_in_SAM)_-_Amendment_0003.pdf PDF
Attachment_2_(Q A_II)_-_Amendment_0003.pdf PDF
RFP_-_Amendment_0003.pdf PDF
Attachment_1_(Seed_Project_Pictures)_-_Amendment_0003_(2).pdf PDF
Attachment_3_(Updated_Section_K)_-_Amendment_0003.pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(9).pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(13).pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(8).pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(3).pdf PDF
Attachment_2_(SABER_SOW)_-_Amendment_0002.pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(4).pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(2).pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(7).pdf PDF
Attachment_1_(DBA_-_Plant_42)_-_Amendment_0002.pdf PDF
RFP_-_Amendment_0002.pdf PDF
Attachment_3_(Seed_Project_SOW)_-_Amendment_0002.pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(6).pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(12).pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(11).pdf PDF
Attachment_8_(Attendee_List_Pre-Proposal_Conference_Site_Visit_Slides)_-_Amendment_0002.pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(10).pdf PDF
Attachment_5_(Hazardous_Material_Survey)_-_Amendment_0002.pdf PDF
Attachment_4_(SABER_Q A)_-_Amendment_0002.pdf PDF
Attachment_7_(Seed_Project_Pictures)_-_Amendment_0002_(5).pdf PDF
RFP_Amendment_0001.pdf PDF
Attachment_3_-_Asbestos_Specification.pdf PDF
Attachment_4_-_CA_Lead_in_Paint_Specs.pdf PDF
Attachment_L-2_PPQ.pdf PDF
Attachment_5_-_DBA.pdf PDF
FA9301-14-R-0011.pdf PDF
Attachment_1_-_SOW.pdf PDF
Attachment_L-4_Coefficient_Information.pdf PDF
Attachment_L-1_PPIF.docx DOCX document
Attachment_L-3_Seed_Project_SOW.pdf PDF
Attachment_2_-_Design_Standards.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

42 10 20

SCALE IN FEET

FIRST FLOOR PLAN

Attachment 6 Floor Plan, Site Plan, Site Elevations

FA9301-14-R-0011 - Amendment 0002

6 7 8 9 10

112 1

S

SW

SE

E

W

NW

NE

N

DEMO &

FLOOR

PLANS

A-1

JW

1/4"=1'-0"

FLOOR PLAN

GENERAL NOTES

1. CONTRACTOR SHALL COMPLY WITH ENVIRONMENTAL MANAGEMENT (EM) REQUIRED

CHECKLIST.

2. BARRICADE CONSTRUCTION AREA TO PREVENT HAZARDOUS CONDITIONS.

3. KEEP THE AREA CLEAN AT ALL TIMES AND REMOVE ALL WASTE IN THE APPROPRIATE

MANNER.

4. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS.

KEY NOTES

INSTALL NEW STOREFRONT WITH SLIDING DOOR AND MOTION DETECTOR.4

DRAWING NUMBER

SHEET OF

DRAWN BY

CHECKED

T.O. #

DATE

SCALE

SHEET TITLE

SABER DIVISION

EDWARDS AFB, CA 93524

227 N ROSAMOND BLVD

FA

C

IL

IT

IE

S

M A N A G E R

A P P R O V A L S

IG

N A

TU

R E

ENGINEERING, INC.

661-258-4540

EDWARDS

ACE

C

IV

IL

E N G

IN

E E R

IN

G

A P P R O V A L S

IG

N A

TU

C O N

TR

A C

TI

N G

A P P R O V A L S

IG

N A

TU

D A

TE

D A

TE

D A

TE

R P R E N

TR

A N C E D O O R S

B U

IL

D

IN

G

NUMBER

REVISION

DATE

FI

R E

D E P A R

TM

E N T A P P R O V A L S

IG

N A

TU

R E

D A

TE

APPROVED

AS-NOTED

04/03/06

MA

SF

AS-BUILT

JW

6 FLOAT EXISTING BLOCK WALL IN ENTRY AND TEXTURE TO MATCH EXISTING INTERIOR

WALLS.

7 TEXTURE COAT EXISTING CEILING AND WALLS OF ENTRY.

8 PROVIDE 1 COAT OF PRIMER AND 2 COATS OF PAINT TO NEW DRYWALL AND

EXISTING WALLS AND CEILINGS.

KEY PLAN

1/4"=1'-0"

DEMO PLAN

DEMO KEY NOTES

EXISTING INTERIOR ENTRANCE DOORS AND GLASS TO REMAIN.1

REMOVE EXISTING EXTERIOR STOREFRONT AND DOORS.2

RELOCATE FIRE ALARM PULL STATION AS REQUIRED.

INSTALL NEW SURFACE MOUNT LIGHT FIXTURE.

REMOVE EXISTING INTERIOR CLOSET DOOR.3

INSTALL NEW DRYWALL AND WOOD DOOR FOR NEW CLOSET.

CLEAN AND REPAIR EXISTING DOORS AS REQUIRED.11

Attachment 6 Floor Plan, Site Plan, Site Elevations

FLOOR PLAN

NEWDEMO

6 7 8 9 10

3 5

Attachment 6 Floor Plan, Site Plan, Site Elevations

42 10 20

SCALE IN FEET

FIRST FLOOR PLAN

BUILDING 2850

04/15/04DATE:

PROJECT NO. EDWARDS AFB

FIGURE

N

Attachment 6 Floor Plan, Site Plan, Site Elevations

Attachment 6 Floor Plan, Site Plan, Site Elevations

Attachment 6 Floor Plan, Site Plan, Site Elevations

Model
1ST FLR
Vestibule Addition.pdf
Model
A-1

File details come from the government source that posted it. Updated .