TOS II Attachment L_10 Surge Project Sample Task.pdf

PDF 759 KB Posted

Attached to
Test Operations and Sustainment (TOS) II Federal contract opportunity
Solicitation number
FA9101-22-R-B001
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to Test Operations and Sustainment (TOS) II, newest first.
File Type Posted
Instructions to Gain Access to Controlled Documents.pdf PDF
TOS II Attachment 7 PWS (3_26 excerpt).pdf PDF
TOS II Attachment L-9.1 Cost Model for Sub.xlsx XLSX spreadsheet
TOS II_DRFP_Amend_01_Revised Cost Model.pdf PDF
TOS II Exhibit C CBAs.pdf PDF
TOS II Attachment 8_1 CAP Arnold_NFAC_T9.pdf PDF
TOS II Attachment 8_2 GFP AVSF_LGTF_NRTF.pdf PDF
TOS II Attachment 8_3 CAP AVSF_LGTF_NRTF.pdf PDF
TOS II Attachment L_3 PPQ Cover Letter.pdf PDF
TOS II Attachment L_6 Relevancy Matrix.pdf PDF
TOS II Attachment L_8 Workload Resource Guide.pdf PDF
TOS II Attachment L_11 Surge Project Sample Task Questions.pdf PDF
TOS II Attachment L_12 SB Participation Template.pdf PDF
TOS II DRFP Cover Letter.pdf PDF
TOS II SF33 Draft RFP FA910122RB001 Part 1 of 2.pdf PDF
TOS II SF33 Draft RFP FA910122RB001 Part 2 of 2.pdf PDF
TOS II Exhibit A CDRLs.pdf PDF
TOS II Attachment 2 DD254.pdf PDF
TOS II Attachment 3 SCLS Wage Determinations.pdf PDF
TOS II Attachment 5 Award Fee Term Plan.pdf PDF
PPI tool.zip ZIP file
TOS II Attachment 1 Workload by WBS.pdf PDF
TOS II Attachment 8 GFP Arnold_NFAC_T9.pdf PDF
TOS II Attachment L_5 Subcontractor Consent Letter.pdf PDF
TOS II Attachment L_7 Cross Reference Matrix.pdf PDF
TOS II Attachment L_9 Cost Model.xlsx XLSX spreadsheet
TOS II Exhibit B DIDs.pdf PDF
TOS II OCI MultiStep Atch 3 Draft L and M.pdf PDF
TOS II OCI MultiStep Atch 1 Flow Chart.pdf PDF
TOS II OCI MultiStep Atch 2 Draft H115 OCI Clause.pdf PDF
TOS II_RFI_3_Amend_04_Final.pdf PDF
TOS II_RFI_3_Amend_04_ATCH 1_Draft Cost Model for Offerors.xlsx XLSX spreadsheet
TOS II_RFI_3_Amend_03_Final.pdf PDF
TOS II_RFI_3_Amend_02_Final.pdf PDF
TOS II_RFI_3_Amend_01_ATCH 1_Map to GLC.pdf PDF
TOS II_RFI_3_ATCH 1_H115 Organizational Conflicts of Interest DRAFT.pdf PDF
TOS II_RFI_3_ATCH 2_H050 Rights in Information and Data Clause DRAFT.pdf PDF
TOS II_RFI_3_ATCH 3_TOS II PWS_26OCT22_DRAFT.pdf PDF
TOS II_RFI_3_Final.pdf PDF
TOS II_RFI_2_Amend_02_Final.pdf PDF
TOS II_RFI_2_Amend_01_Final.pdf PDF
TOS II_RFI_2_Amend_01_ATCH 1_Industry Day 2 Registration.xlsx XLSX spreadsheet
TOS II_RFI_2_Final.pdf PDF
TOS II_RFI_2_ATCH 1_Draft Industry Day 2 Agenda.pdf PDF
TOS II_RFI_1_Amendment_02.pdf PDF
FA910122RB001_Industry Day 1 Questions.xlsx XLSX spreadsheet
TOS II_RFI_1_Amendment_01.pdf PDF
TOS II_RFI_1_Final.pdf PDF
TOS II_RFI_1_ATCH 1_PWS_FA9101-13-0100.pdf PDF
TOS II_RFI_1_ATCH 2_Clause H115_OCI.pdf PDF
Show all 50

Test Operations and Sustainment (TOS) II has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOS II

FA9101-22-R-B001

Attachment 13, L-10

ATTACHMENT L-10

SURGE PROJECT SAMPLE TASK

The following narrative describes a potential task to represent the nature of anticipated AEDC surge projects. The Offeror shall not make any effort to design a system to meet this notional requirement. The Offeror shall answer the associated Surge Project Sample Task Questions (Attachment L-11) in the Offeror's proposals, and the Government will evaluate the Offeror's proposal IAW Section M, paragraph M-2.2.5.4.

Surge Project Sample Task: Hybrid Propulsion Upgrade

Location: Arnold AFB, TN

Timing: Sometime during contract – assume spring / summer if it matters in the development of the response.

Scenario: AEDC has an existing test facility / cell which is connected on each end to an industrial air supply and an exhaust system capable of approximately 2400 lbm/sec. There is emerging requirement to test significantly more energetic test articles with hybrid propulsion capabilities. It is desired that this test cell be located adjacent to existing cells to exploit the capabilities of both plants, as well as connect to existing networks for output data handling. The cell needs to be either hardened or below ground to mitigate adjacent damage from any test article failures that could potentially occur with the new hybrid propulsion system – up to an equivalent 45.6 lb. net explosive weight and fragmentation from test article failure. The cell must be at least 25ft diameter and 80ft in length. If the cell is underground and requires top loading of test articles, facility must incorporate full length access and in situ handling equipment to precisely load / position test articles weighing up to 20,000 lb. Side or end loading must incorporate sufficient prepared adjacent hardstand to enable test article delivery / positioning to engage similar in situ handling equipment for positioning in the cell. Additional cooling capacity will be required between test article and the exhaust plant, expected to reduce duct gas temperature to maximum of 150 degrees Fahrenheit. The core test article effluent could range as high as 5,500 degrees Fahrenheit, but this is only a small fraction of total airflow through the cell. Design has also indicated the requirement for mechanisms to neutralize or eliminate potential corrosive / explosive gases from the effluent as well. Any combination of sprays, gas injection / separation, or flaring may be used to mitigate risk to the exhaust plant rotating machinery.

The project will include all necessary electrical work to support cell operations and maintenance, as well as requirements for powering instrumentation, data, and control systems for the cell and the test article. All cell, duct, and gas monitoring instrumentation are included, as well as systems for associated controls of duct flow, cooling operations, effluent handling, etc.

instrumentation of the test stand for thrust measurement in all axes, vibration, and condition monitoring. Construction includes all systems / connections / runs of instrumentation wiring to handle high frequency / high bandwidth test article instrumentation from the developer for real-time monitoring in the control room. Implementation must be compatible with existing control room applications / hardware.

DRAFT

TOS II

FA9101-22-R-B001

Attachment 13, L-10

Based on this description, the Government expects there to be significant heavy construction and fabrication work in and adjacent to an operating test facility. The desire is to have the minimum down time for tie-in to the existing plants, and to perform all the work in the shortest amount of time to meet customers’ most pressing needs.

DRAFT

File details come from the government source that posted it. Updated .