TOS II Attachment 7 PWS.pdf
PDF 2 MB Posted
- Attached to
- Test Operations and Sustainment (TOS) II Federal contract opportunity
- Solicitation number
- FA9101-22-R-B001
View the file
Other files for this federal contract opportunity
Show all 50
Test Operations and Sustainment (TOS) II has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i
FA9101-22-R-B001
Attachment 7
Performance Work Statement (PWS)
Test Operations and Sustainment (TOS) II
7 February 2023
DRAFT
ii
Table of Contents
Vision Statement
1.0 Introduction
1.1 MISSION
1.2 BACKGROUND
1.3 SCOPE
2.0 General Requirements
2.1 BUSINESS RELATIONS
2.2 CONTRACT ADMINISTRATION AND MANAGEMENT
2.3 SUBCONTRACT MANAGEMENT
2.4 CONTRACTOR PERSONNEL, DISCIPLINES, AND SPECIALITIES
3.0 Performance Requirements
3.1 TEST AND EVALUATION
3.2 AEDC GSU SUPPORT NOT OTHERWISE DEFINED
3.3 OPERATION OF TEST ASSETS AND TEST ARTICLES
3.4 INTEGRATED SCHEDULING
3.5 LIFECYCLE SUSTAINMENT OF TEST AND TEST SUPPORT ASSETS
3.6 ID&C ENGINEERING SERVICES, CYBERSECURITY, AND LIFECYCLE SUSTAINMENT
………………………………………………………………………………………..25
3.7 TEST, MEASUREMENT, AND DIAGNOSTIC EQUIPMENT (TMDE) MANAGEMENT
………………………………………………………………………………………..33
3.8 CAPITAL IMPROVEMENTS
3.9 FUEL MANAGEMENT SERVICES
3.10 MACHINING / FABRICATION AND CHEMICAL / MATERIAL ANALYSIS
3.11 OPERATIONS AND LIFECYCLE SUSTAINMENT OF AEDC BASE SUPPORT ASSETS
………………………………………………………………………………………..45
3.12 UTILITIES GENERAL SUPPORT
3.13 DATA AND DOCUMENTATIONFOR AEDC CONFIGURATION ITEMS
3.14 AEDC GROUND, WEAPONS AND SYSTEM SAFETY PROGRAMS
3.15 SENSITIVE COMPARTMENTED INFORMATION (SCI) SECURITY AND ASSOCIATED
SCI/ INTELLIGENCE, SURVEILLANCE, RECONNAISSANCE (ISR) CYBERSECURITY
SUPPORT
3.16 FINANCIAL MANAGEMENT
3.17 ACQUISITION, STORAGE, INVENTORY, AND ISSUE OF SUPPLIES, SERVICES, AND
EQUIPMENT
3.18 INTERFACE MANAGEMENT
3.19 GENERAL MANAGEMENT
3.20 STRATEGIC PLANNING
3.21 FOREIGN TECHNOLOGY
iii
3.22 PUBLIC AFFAIRS
3.23 REAL PROPERTY MANAGEMENT AND ACCOUNTABILITY SERVICES
3.24 CONTINUOUS IMPROVEMENT PROGRAM
3.25 INTEGRATED PERFORMANCE MANAGEMENT PROGRAM
4.0 Special Requirements
4.1 TRANSITION
4.2 704th TEST GROUP DIRECTIVE REQUIREMENTS
5.0 Acronyms
6.0 Deliverables
7.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS)
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
APPENDIX E
TEST OPERATIONS AND SUSTAINMENT (TOS) II
VISION STATEMENT
In 2036, Arnold Engineering Development Complex (AEDC) will continue to be headquartered at Arnold Air Force Base (AFB), TN, with a nationwide footprint that is comprised of multiple geographically separated units (GSUs) that may be expanded during the duration of the TOS II contract. It will have active collaborations with personnel assigned to the Air Force (AF) Research Laboratory, various strategically chosen academic institutions, the AF Life Cycle Management Center, the Test Resource Management Center, and the Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. Its facilities, business models, and processes will be designed to facilitate those collaborations. It will be widely recognized as both the leader in analysis of aerodynamic and propulsion test data as well as a key developer of technology for ground-test systems.
AEDC operates more than 68 aerodynamic and propulsion wind tunnels, rocket and turbine engine test cells, space environmental chambers, arc heaters, ballistic ranges and other specialized units located in eight states.
Many of the Complex's test units have capabilities unmatched elsewhere in the United States; some are unique in the world. AEDC is one of three installations which are part of the Air Force Test Center (AFTC), one of six subordinate commands of the Air Force Materiel Command (AFMC) organization and an important national resource.
AEDC Mission: Test and evaluate systems to meet the demands of the National Defense Strategy.
AEDC Vision: Second to none!
1.0 INTRODUCTION
The AFTC’s AEDC is a national aerospace ground and flight test facility that conducts tests, engineering analyses, and technical evaluations for research, system development, and operational programs of the AF and Department of Defense (DoD), other Government agencies, and industry. Using ground and flight test facilities and computational engineering, AEDC supports propulsion, aerodynamic, reentry, trans-atmospheric, and space-flight systems testing. This testing underpins the technical knowledge required for the development and qualification of key warfighter aerospace weapons. Testing is performed in an environment that simulates operational conditions. AEDC also develops new test technology for advanced test facilities, test techniques, and measurement methodologies associated with ground and flight tests.
1.1 MISSION
AEDC exists to test and evaluate weapon, propulsion, aerodynamic and space systems at realistic conditions for the nation through modeling, simulation, and ground and flight test facilities. The mission is essential to developing and fielding weapons systems for the nation's warfighters.
The TOS II Contractor (Contractor) will execute this mission, while smoothly integrating with the other AEDC contractors and Government personnel, in a manner that makes AEDC the most effective ground and flight test and evaluation (T&E) complex in the world – suitable for supporting the best Air Force in the world.
1.2 BACKGROUND
The AEDC TOS II Contract provides the contractor workforce necessary to successfully operate and sustain AEDC's test facilities at Arnold AFB, TN, and GSUs at White Oak, MD, Wright-Patterson AFB, OH, White
Sands Missile Range, NM, and Moffett Field, CA. This PWS accounts for the need to interface with multiple contractors providing other mission essential services for AEDC.
A Deliverable is a document, form, report, log, or other type of submittal with an associated Contract Data Requirements List (CDRL) and Data Item Description (DID) that is provided to the Government per the CDRL requirements. In many cases, a Deliverable will be used to oversee Contractor progress, verify compliance with requirements and regulations, or may be necessary as part of a formal review.
Through the Contractor’s daily operations, many forms, logs, reports, inspection records and other similar documents will be produced which may be of interest to the Government. To maintain consistency and alignment with the approach to implement processes that add value and incorporate commercial best practices, there are many of these documents that may not be formally presented and / or transmitted to the Government through the Contracting Officer (CO) as a Deliverable. However, these documents will be inputted and filed in the Government-provided document management information system. These types of documents are not considered Deliverables and are not included in the PWS.
In addition, if the Government determines that any Deliverable needs to be added or removed, the Contractor will work to ensure the Deliverable is addressed appropriately to meet the needs of AEDC.
1.3 SCOPE
The TOS II contract acquires test operations, technology development, equipment and facility sustainment, capital improvements and some support services for AEDC. AEDC provides the most comprehensive set of aerospace ground and flight test facilities in the world. Many of the individual test facilities are unique in the country or in the world. At its operating sites, AEDC facilities include very large to medium-sized wind tunnels which cover the entire flight envelope from subsonic to hypersonic speeds. Simulated altitude testing for very large commercial-type turbofan engines and the world’s most powerful fighter engines as well as large rocket motors can be conducted at AEDC. Facilities at AEDC can further simulate space environments and space vehicle reentry speeds and temperatures.
1.3.1. AEDC Test Capabilities include but are not limited to:
Arnold AFB:
Turbine Engine Altitude Ground T&E: Simulated altitude testing of jet engines;
Turbine Engine Ram / Sea Level Ground T&E: Testing of jet engines at sea level, with and without pressurized inlet air;
Hypersonic Propulsion Ground T&E: Ground testing of propulsion systems designed for flight at hypersonic speeds;
High Mach Number Engine Altitude Ground T&E: Simulated altitude testing of very high supersonic jet engines;
High Temperature Material Characterization and Evaluation: Testing of material characteristics at atmospheric reentry temperatures;
Hypervelocity Flyout, Impact, and Lethality Ground T&E: Ground testing of projectiles and their lethality characteristics at missile intercept velocities;
High Altitude / Space Environmental Effects and Sensor Ground T&E: Testing of components and systems performance in space environments;
Multi-Spectral Signature Measurement & Analysis Measurement: Analysis of signal signatures of objects such as missiles, aircraft, etc;
Super / Hypersonic Aerodynamic / Aerothermal Ground T&E: High speed wind tunnels for making aerodynamic and aerothermal measurements on aerospace system models;
Transonic Aerodynamic / Propulsion Ground T&E: Medium and large aerodynamic wind tunnels for making aerodynamic measurements on aerospace system models. The large wind tunnel also has propulsion capability;
Solid Rocket Motor Ground T&E: Simulated altitude testing of solid rocket motors;
Hypervelocity Ground T&E: A specialized wind tunnel for performing very high speed measurements on aerospace system models;
Subsonic Aerodynamic Ground T&E: Low speed, very large aerodynamic wind tunnels.
GSUs:
All sites have similar missions, although different facilities and specialties. All require similar support but obtain that support from a variety of sources. GSUs obtain some of these services through leases and support agreements as tenants on the property of other Government activities.
Holloman AFB (HAFB), NM/White Sands Missile Range, National Radar Cross-Section (RCS) Test Facility (NRTF): The mission of the NRTF is to deliver secure, static RCS and antenna test data;
including analysis and processing, target mounting, dismounting transporting, modification and measuring, and operation. Activities include operation of radars, control devices, pits, pylons, field probe devices, mounting, dismounting, transportation, modification of targets, operation of heavy equipment, calibrations, and narrowband, wideband, mono-static and polarimetric scattering matrix corrections.
Additionally, the NRTF develops state-of-the-art RCS testing technologies and processes to ensure NRTF is capable of meeting the most advanced United States applied RCS technology test requirements at all times. The NRTF is a single site / facility utilizing the RCS Advanced Measurement System (RAMS), and the Research, Diagnostic and Integration (ReDI) Range. 704th Test Group Detachment 2, HAFB manages the NRTF.
National Aeronautics and Space Administration (NASA) Ames Site (National Full Scale Aerodynamics Complex (NFAC)), Subsonic Aerodynamic Ground T&E: Low-speed, very large aerodynamic wind tunnels.
White Oak Site (Tunnel 9), Hypervelocity Ground T&E: A specialized wind tunnel for performing very high-speed measurements on aerospace system models.
Wright-Patterson AFB, OH, Landing Gear Test Facility (LGTF): Test and evaluation of integrated landing gear systems and component subsystems, including aircraft tires, wheels, brakes, struts, bearings, bushings, actuators, fasteners, and associated mechanical devices. The LGTF is comprised of two (2) connected buildings, which are Government-owned and maintained real property.
Wright-Patterson AFB, OH, Aerospace Vehicle Survivability Facility (AVSF): Provides test and analysis to support the evaluation of aerospace platform vulnerability reduction, aerospace survivability, modeling and simulation, research and development, and test and evaluation. AVSF is comprised of a number of buildings which are Government-owned and maintained.
1.3.2. Requirements provided by the TOS II contract include but are not limited to:
Test project management and analysis support necessary to execute the AEDC mission;
Analysis, evaluation, and reporting of foreign scientific and technical information;
Project management and technical support necessary to accomplish effective test technology development in support of the AEDC mission;
Advancing test capability by advancing techniques in modeling and simulation, instrumentation, and test techniques;
Apply current DoD, United States Air Force (USAF), and National Institute of Standards and Technology
(NIST) guidelines, instructions, policies, and standards across all maintenance, development, acquisition, and life cycle management of assigned Information Technology Research, Development, Test and Evaluation (RDT&E) networks, software applications;
Capital improvement planning, programming, and execution of projects / programs to repair, modernize, improve, and acquire RDT&E assets;
Maintenance and repair activities on all RDT&E and Test Support assets;
Operation and maintenance of all shop and laboratory assets including the Machine and Fabrication Shop, the Metrology / Non-Destructive Examination Laboratory, and the Chemistry Laboratory;
Development and application of a Quality program in accordance with (IAW) Government requirements;
Maintain, develop, and modernize AEDC specific business systems software applications;
Maintenance, repair, improvement, modernization, and acquisition of all AEDC base support assets, including real property;
Operating / maintaining base utilities;
Purchasing of supplies, equipment, and services for all authorized AEDC operations including tenant organizations;
Management of the requisition, receipt, storage, issuance, quality, and accounting of petroleum fuels and cryogenic products IAW Defense Logistics Agency (DLA) requirements;
Defining, planning, managing and executing projects / programs to repair, modernize, improve and acquire instrumentation, data acquisition, and control systems;
Providing performance management, business management, and process management in support of the performance of this contract; and Integrated Analysis in support of test data analysis, Program Office analysis, and digital modernization transition within the Complex.
2.0 GENERAL REQUIREMENTS
The effort will be performed primarily at the AEDC site at Arnold AFB, TN. Performance will also be required at AEDC facilities at the following GSU locations: Tunnel 9 at White Oak, MD, LGTF and AVSF at Wright-Patterson AFB, OH, NRTF at White Sands Missile Range, NM, and the NFAC at Moffett Field, CA.
Requirements listed in this PWS are assumed to be AEDC-wide unless specifically noted otherwise. Period of performance is expected to start the first day of July 2024 for the Arnold AFB, Tunnel 9, and the NFAC scope of work. The NRTF, LGTF, and AVSF scope of work is expected to start the first day of April 2026.
The overall TOS II contract will extend twelve years (30 September 2036) if all options and Award Fee Terms are exercised. All referenced instructions, manuals, and other mandatory documents referenced in the PWS are the versions current and applicable as of 1 July 2024. Any changes to applicable documents will require a contract modification.
2.1 BUSINESS RELATIONS
The Contractor shall:
Successfully integrate and coordinate all activity needed to execute the requirement;
Manage the timeliness, completeness, and quality of problem identification;
Provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors;
Coordinate and cooperate closely with associate contractors involved in the execution of AEDC’s mission;
Ensure satisfaction of all internal and external customers and professional and ethical behavior of all
Contractor personnel.
2.2 CONTRACT ADMINISTRATION AND MANAGEMENT
The Contractor shall perform all contract management functions required to ensure proactive and sustained contract excellence in providing accurate, safe, secure, timely, and efficient contract test and mission support to meet the Government's established requirements.
2.2.1. Contract Management
The Contractor shall designate a responsible corporate official, to be located at AEDC, with no responsibility other than for this contract and empowered to make and implement all decisions regarding the performance of this contract.
2.2.2. Contract Administration
The Contractor shall:
Develop proposals and negotiate annual workload and supplemental contract modifications;
Ensure performance of the business and administrative aspects of the contract;
Report all Full-Time Equivalents (FTEs) IAW Section 8108 of Public Law 112-10 of the DoD and Full-
Year Continuing Appropriations Act, 2011;
Ensure resources are efficiently and effectively managed and contract status (including Government-furnished resources) is reported to Government representatives as required;
Recommend AEDC Instructions and changes to existing instructions as needed to assist in managing and executing this contract and to facilitate the efficient operation of AEDC;
Develop, implement, and manage formal associate contractor agreements as required;
Comply with all applicable Records Management (RM) laws, regulations, policies, and plans (DoD, AF, and Arnold AFB/AEDC), as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 United States Code [U.S.C.] chs. 21, 29, 31, 33), NARA regulations at 36 Code of Federal Regulations (C.F.R.) Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C.
552a).
These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2.2.3. Personnel Administration
The Contractor shall:
Maintain a qualified work force able to perform the broad spectrum of functions necessary to operate, support, and sustain AEDC facilities;
Plan and administer a wage and salary structure, using position classification, standards, and grade levels and adapted to the appropriate geographic locations;
Provide and administer a fringe benefit program, which may include an employee health, vacation, sick leave, holidays, and a retirement program;
Continue and administer a defined benefit pension program for legacy employees on the TOS contract;
Provide and maintain staffing records identifying company organizational designations, a brief description of the functions, and the number and types of personnel assigned;
Report personnel strength to include hiring and termination trends, number of personnel employed by pay category and organization, number of additions and deletions to the payroll;
Provide and administer an Equal Opportunity Affirmative Action Program that complies with all applicable Federal statutes.
Deliverables:
A001 Personnel Strength Report
A002 Wage and Salary Management Plan
2.3 SUBCONTRACT MANAGEMENT
The Contractor shall award and administer subcontracts IAW the Contractor’s established policies, procedures, and approved purchasing system.
2.4 CONTRACTOR PERSONNEL, DISCIPLINES, AND SPECIALITIES
The Contractor shall:
Conduct craft supervision, and management training programs;
Provide opportunities for graduate-level education for employees to the extent such costs are allowed by the Federal Acquisition Regulation (FAR), Part 31;
Accept Government personnel for assignment to positions within the Contractor's organization for immersion or other purposes approved by the CO;
Coordinate joint training programs for all Contractor and Government personnel, as appropriate.
3.0 PERFORMANCE REQUIREMENTS
The following section specifies the Performance Objectives and Performance Elements for the contract.
Unless otherwise specified, all requirements apply to all AEDC locations (Arnold AFB, Tunnel 9, NRTF, LGTF, AVSF, and the NFAC).
3.1 TEST AND EVALUATION
This PWS section outlines requirements to direct, manage and support test and analysis projects. The Contractor shall support all phases of testing, as defined in the following subsections.
A test customer engages AEDC with the intent to generate data and acquire knowledge needed in the development, qualification, and / or sustainment of an aerospace system or system of systems. Technical direction and management are focused on ensuring that the data and information acquired during testing is suitable for decision making and for supporting technical risk management for acquisition programs and other test customer needs. This is a collaborative process that engages the expertise of the testers and the test customer to fully understand the capabilities and limitations of the proposed test program. Careful test planning, including test plans and cost and schedule estimates, participated in by AEDC and its test customer, is an important element of successful testing. The TOS II Contractor will be required to work with its Government counterparts to achieve and maintain high customer satisfaction by supporting the Government project manager to include, but not limited to:
Providing timely support to test operations, Identifying and achieving customer's expectations, and Soliciting feedback and using it constructively to improve customer service.
3.1.1. The Contractor shall support the development of the rough order of magnitude (ROM) cost estimates for testing.
ROMs provide the test customer a cost and schedule estimate based on preliminary information available from the test customer. The level of detail that the test customer provides varies and usually includes test duration and specific requirements, including test conditions and instrumentation. The ROM shall restate to the test customer the requirements as provided, any assumptions used in estimating, and a range in possible costs with rationale. Emphasis shall be applied to determining analysis requirements needed to support the customer’s test.
Deliverable:
A003 Rough Order of Magnitude Estimate
3.1.2. The Contractor shall support the development of the Statement of Capability (SOC) for tests.
SOCs provide the programmatic and technical approach being proposed for a test and analysis project based on the test customer’s known requirements. SOCs are detailed documents which effectively act as a contract for tests conducted for Government customers.
The Contractor shall deliver a completed SOC for testing conducted at the NFAC and NRTF. Support the Government in development of the SOC for tests conducted at Arnold AFB, Tunnel 9, LGTF, and AVSF.
Deliverable:
A004 SOC Report
3.1.3. The Contractor shall support test planning which may include developing test plans.
Test plans include test article configurations, test environmental conditions, test points, required instrumentation, test article operating limits and other information directly required to conduct the test.
The Contractor shall complete this requirement for testing conducted at the NFAC and NRTF. This requirement will be performed by the Government for tests to be conducted at Arnold AFB, Tunnel 9, LGTF, and AVSF, with support from the TOS II Contractor in performance of scope defined in PWS 3.3 and 3.6.
Deliverable:
A005 Test Plan
3.1.4. Baseline test and analysis project plans.
The following subparagraphs outline the requirements for the project plan for all tests.
3.1.4.1. The Contractor shall assess the suitability of the test, develop the analysis requirements, develop the best approach to meeting the test objectives, and support test technical review boards IAW Department of the Air Force Instruction (DAFI) 99-103 and the 804th Test Group Operating Instruction (804TGOI) 99-100.
A determination of the test suitability shall be accomplished in coordination with the test customer. The assessment shall address the intent of the test (e.g., demonstration, qualification, developmental) and shall address the technical approach, method of test, and objectives. The test facility capabilities required to conduct the test must be identified and determined to be available for use. Analysis requirements will either be qualitative or quantitative based on the customer’s test objectives. The analysis requirements for quantitative results shall incorporate the following items at a minimum: a) pre-test measurement uncertainty assessment, statistical assessment of the suitability of the test for each test objective, and uncertainty propagation to test customer required results; b) the requirements for configuring the test data systems to meet the customer’s test objectives including the implementation of custom algorithms and data reduction necessary to meet the customer’s test objectives; c) data validation approach to ensure data integrity. The assessment of the test shall be documented in an engineering report IAW AEDC Operating Instruction (AEDCOI) 99-10. The analysis requirements include defining the delivery schedules for data, analysis products, and technical reports shall be included in the project plan.
The Contractor shall complete this requirement for testing conducted at the NFAC and NRTF. This requirement will be performed by the Government for tests to be conducted at Arnold AFB, Tunnel 9, LGTF, and AVSF, with support from the TOS II Contractor in performance of scope defined in PWS 3.3, 3.6, and 3.7.
Deliverable:
A006 Test and Analysis Project Plan
3.1.4.2. The Contractor shall review and coordinate instrumentation and control system requirements for the provided customer test plan for tests.
This requires coordination and communication with the test customer and the Original Equipment Manufacturer (OEM) of the test article should they be different organizations. This can involve confirming and clarifying sampling rates, data time skew, installation requirements for specific instruments, channel counts, instrumentation mortality concerns, test article control interfacing, and other technical requirements not listed here. The scope of work for the first entry of a test article to configure the test data acquisition system and test data acquisition systems database configuration will be greater than for a repeat entry of the same or similar test article with respect to form, fit and function of the test article. The data acquisition systems and controls systems requirements shall be defined for fulfillment IAW PWS 3.6.3.
The Contractor shall complete this requirement for testing conducted at the NFAC and NRTF. This requirement will be met by the Government for tests to be conducted at Arnold AFB, Tunnel 9, LGTF, and AVSF, with support from the TOS Contractor in performance of scope defined in PWS 3.3, 3.6 and 3.7.
Deliverable:
A006 Test and Analysis Project Plan
3.1.4.3. The Contractor shall define and document requirements for buildup, installation, modification, and removal for test articles.
This requirement can vary in the scope of work depending on the customer’s test requirements and if it is a first or repeat entry for the test article. First entries will usually require the development of support test equipment, test article unique interface hardware, and definition of the operating requirements for preparation of the initial procedures to operate the test article and test facilities. This includes planning to procure and to fabricate necessary test support equipment and includes equipment that shall be supplied by the test customer or their designated representatives. A second or repeat entry of the same or similar test article, with respect to form, fit and function, will generally require minor modifications or reuse of the support test equipment previously procured, fabricated, or provided by the test customer or their designated representatives. The fulfillment shall be IAW PWS 3.3.9 and 3.3.10.
The Contractor shall complete this requirement for testing conducted at the NFAC and NRTF. This requirement will be met by the Government for tests to be conducted at Arnold AFB, Tunnel 9, LGTF, and AVSF, with support from the TOS II Contractor in performance of scope defined in PWS 3.3 and 3.6.
Deliverable:
A006 Test and Analysis Project Plan
3.1.4.4. The Contractor shall develop test period run programs, test article configuration requirements, and test installation configuration requirements for customer provided test plans for tests.
The test period run programs shall account for any test sequence or prescribe translations for the test article or test support equipment, the test article configuration, test environment including stabilization time, efficient use of power, requirements for acquiring data, and shall be linked directly to the test plan provided by the test customer.
The Contractor shall complete this requirement for testing conducted at the NFAC and NRTF. This requirement will be met by the Government for tests to be conducted at Arnold AFB, Tunnel 9, LGTF, and AVSF, with support from the TOS II Contractor in performance of scope defined in PWS 3.3 and 3.6.
Deliverable:
A007 Test Period Run Plan
3.1.4.5. The Contractor shall identify resource requirements, including materials, utilities, and labor required to perform TOS test scope.
The definition of resources shall include the identification of support from other AEDC contractors for work required to complete planning, design of installation, fabrication, installation, and test operations, including facilities and data systems, and removal. Location specific data requirements are identified in the DID.
Deliverable:
A006 Test and Analysis Project Plan
3.1.4.6. The Contractor shall provide requested information to the Government to support project planning, reviews, and execution.
Information may include but is not limited to resource estimates for labor, materiel, and utilities, schedules, configuration, operational options and recommendations to meet required test conditions. Information may be used to develop ROM Estimates, Test Project SOCs, Test Plans, Test Readiness Reviews (TRRs), and other project documentation.
3.1.4.7. The Contractor shall prepare and organize required documentation for the Safety Review Board.
The test and analysis project safety assessment and the documentation of the assessment shall be accomplished IAW PWS 3.14.2.
3.1.5. The Contractor shall provide test and technology project management support.
The Contractor shall support TRRs for tests conducted at the GSUs and at Arnold AFB. Refer to DAFI 99- 103, Capabilities Based Test and Evaluation, Department of the Air Force Instruction (DAFI) SUP 99-103, Capabilities Based Test and Evaluation, and 804TGOI 99-100, Test and Evaluation / Sustainment of Test Facilites.
3.1.5.1. The Contractor shall track, manage, and report project cost, schedule, and technical performance for tests.
The Contractor shall complete this requirement for testing conducted at the NFAC and NRTF. This requirement will be met by the Government for tests to be conducted at Arnold AFB, Tunnel 9, LGTF, and
AVSF.
Deliverable:
A008 Integrated Program Management Report
3.1.5.2. The Contractor shall identify and document project scope changes and incorporate Government-approved scope changes and project deviations.
The Contractor shall complete this requirement for testing as directed by the Government. This requirement is normally performed by the Government with support from the TOS II Contractor in performance of scope defined in PWS 3.3, 3.6 and 3.7.
Deliverable:
A009 Project Change Agreement
3.1.5.3. The Contractor shall document and maintain project records and project reviews for tests.
Provide access to the following: test requirements, project and analysis plans, test analysis, test reports, test plan, test requirements information, test configurations, deliverable reports, operating logs for test article and test article support equipment, and test data used for reports, test and facility data associated with anomalous events, and test productivity metrics. This database will incorporate existing data and accessibility will be limited to the Government, TOS II Contractor, and Test Services Contractor.
The Contractor shall:
Meet this requirement in total for testing conducted at the NFAC and NRTF. This requirement will be met by the Government for tests to be conducted at Arnold AFB, Tunnel 9, LGTF, and AVSF for test analysis, test reports, test plan, and test requirements information;
Meet the following aspects of this requirement for testing conducted at Arnold AFB, Tunnel 9, LGTF, and AVSF: test configurations and operating logs for test articles and test article support equipment.
3.1.6. The Contractor shall prepare and deliver data packages and technical reports for tests.
This section outlines the requirements for technical reporting identified in the SOC and the approved test and analysis project plan. Data validation and fault checking, to the extent feasible, shall occur in real time for test programs to accomplish the test objectives; this shall be accomplished to ensure the ability to deliver data real-time and / or at the end of each test period. The data shall be analyzed and evaluated with respect to the test objectives and analyzed for performance with respect to test objectives. The data evaluation shall at a minimum include the definition of the overall uncertainty for steady state data for the designated performance parameters and associated measurements. Uncertainty analysis traceable to test data and calibration information will be performed. All test objectives will be addressed. Reports shall be formatted IAW AEDCOI 99-10, Technical Reporting.
The Contractor shall complete this requirement for testing conducted at the NFAC and NRTF. This requirement will be met by the Government for tests to be conducted at Arnold AFB, Tunnel 9, LGTF, and AVSF, with support from the TOS II Contractor in performance of scope defined in PWS 3.3, 3.6, and 3.7.
Deliverable:
A010 Technical Reports
3.1.7. The Contractor shall provide test customer support.
Test customer support requires close coordination with the Test Manager, the test customer and other AEDC contractors to assist the customer with base access, network access, AEDC safety information and any other general support to help prepare the test customer for arrival at AEDC.
3.1.8. The Contractor shall provide recommendations, conclusions, and lessons learned for continuous test capability and test process improvement. The information requested shall be entered into a lessons learned database following every test project.
3.1.9. The Contractor shall respond to Government developed requirements to identify, design, develop, and execute Analysis, Technology Development, and Digital Modernization projects that will eliminate requirements gaps in facility and plant hardware, software, instrumentation, analytical methods, computational modeling and simulation, and test methodology improvements.
Analysis and Technology projects will be captured and prioritized in the Integrated Technology Investment Plan (ITIP), which is managed by the Government and supports the AEDC strategic plan. Topic candidates for ITIP inclusion and funding will be submitted to the Government by the Contractor. The ITIP will have detailed plans for the upcoming year’s projects and 5-year plans for additional topics, as funding allows, in support of the Future Years Defense Program (FYDP). These topics will be identified in collaboration with other DoD T&E complexes and developers, academic institutions, and industry. A continual professional interchange will be maintained with technology-oriented representatives from industry and Government, consistent with AEDC Agreements, by attending and being involved with technical conferences and seminars.
The ITIP shall include a “gap analysis” which includes facility and plant hardware, software, personnel skills, instrumentation, analytical methods, modeling and simulation, and test methodologies. The Contractor will propose suggestions to the Government for approval in order to eliminate requirement gaps. Semi-Annual Analysis and Technology Program reviews will be provided by the Contractor. These program reviews shall include highlights of the major projects, a review of the transition candidates and a listing of Engineering Reports (ER), papers, and presentations, made during the year, that are a result of the Analysis and Technology Program activities.
This PWS conforms to the Government’s approach to technology development and the Contractor will support the Government’s efforts for all programs by performing the tasks in this section as directed.
The Contractor shall maintain a prioritized list of execution ready projects, coordinated with the Government, which can be accomplished with year-end or other unexpected fund sources.
Deliverables:
A011 ITIP Candidate Topic
A012 Technology Progress Report
3.1.10. The Contractor shall assure the transition of technology products to the intended environment with operational and maintenance activities identified, as required.
Technology product transition will be coordinated with and approved by the Government, including proof-of-concept, prototypes, incremental development products, and Small Business Innovation Research (SBIR) products. Transition activities should assess the need for training, operators’ manuals, and maintenance requirements. Software product requirements, technology software product transition, and technology instrumentation and control product transitions will be IAW with Section 3.6 requirements. Technology products requiring calibration will be coordinated with the Precision Measurement Equipment Laboratory (PMEL) contractor. Technology transition projects will be visible in the Integrated Master Schedule (IMS).
Documentation of the Contractor’s plans for transition of the technology products to users will be in the form of a “Technology Transition” section that will be a part of each activity description in each Technology project plan. These Technology Transition sections will identify the intended recipient of the technology product; the intended verification, validation, and acceptance processes for that transition, as applicable; and will include a notional timeline for transition. If Technology Transition does not apply to a particular activity, if for example the activity involves infrastructure or management but not development, then a transition section is not required for that activity.
3.1.11. The Contractor shall conduct measurement and troubleshooting services using developmental instrumentation and systems.
The AEDC Technology program supports measurements and troubleshooting for on-base test activities, and off-base customers including commercial and other Government groups. The advanced measurement and troubleshooting activities may require Contractor operation of specialized measurement equipment, innovative data gathering tools, technical evaluations and / or data analysis.
Examples of this activity include gaseous emissions sampling and analysis, exhaust particulate measurements, non-contact Stress Measurement System (NSMS) testing, and multispectral signature data gathering. The off-base testing support requires packing and shipping of equipment, travel for personnel, and operation and maintenance of equipment in a field environment, which the Contractor will provide as required by the Government.
3.1.12. The Contractor shall provide engineering support for Small Business Innovation Research (SBIR) programs.
The SBIR program allows for awarding contracts to small business with the intent of developing a new test technique, instrumentation package, modeling and simulation capability, or sustainment activity that would benefit the Government and allow for the commercialization of the product by the small business. These awards are based on proposals on topics that are identified and broadcast by the Government.
The Contractor shall support the Government SBIR Program Manager in identifying candidate topic ideas and supporting transition of SBIR developments into operation. Transition activities include training, operation and maintenance of the product.
Deliverable:
A013 SBIR Topics Candidate List
3.1.13. Applicable Documents (Mandatory)
DAFI 99-103 Capabilities Based Test and Evaluation
DAFI SUP 99-103 Capabilities Based Test and Evaluation
AEDC SUP to AFI 91-202 Test Safety
804TGOI-99-100 Test and Evaluation / Sustainment of Test Facilites
AEDCOI 99-10 Technical Reporting
3.2 AEDC GSU SUPPORT NOT OTHERWISE DEFINED
In 2036, AEDC will likely continue to be headquartered at Arnold AFB, but may have a nationwide footprint that is expanded from today's. This specific requirement is only to be accomplished on a non-interference basis with any other contracts, e.g., the Eglin AFB, Operations and Maintenance Services (E-OMS) contract.
At no time will TOS II contractors perform work already required by other contracts. This requirement is intended to provide a contract mechanism that enables AEDC to utilize the TOS II Contractor at all AEDC GSUs, including any GSUs that become functionally aligned under AEDC following award of the TOS II contract. Additionally, no requirements shall be accomplished that are not already part of the scope on this contract.
3.2.1. The Contractor shall provide support to all AEDC GSU’s that may be aligned functionally under AEDC in the future, but for which there is no specific requirement for operations and sustainment support from the TOS II Contractor at the time of contract award. Any such GSUs will be added to the TOS II contract scope of work pursuant to an in-scope modification under the Changes clause, FAR 52.243-2 Changes – Cost Reimbursement, Alternate II, Subsection (a)(3).
3.2.2. The Contractor shall provide in-scope support to AEDC GSUs not specifically defined in this PWS (i.e., Tunnel 9, the NFAC, NRTF, LGTF, and AVSF) on an as-needed basis when funded by the Government and directed by the CO.
3.3 OPERATION OF TEST ASSETS AND TEST ARTICLES
This PWS section defines objectives and requirements for safe, efficient, and effective operations of test cells, process air plants, test utilities (steam, electrical, and raw water), and their associated systems, including Test Instrumentation, Data, and Controls (ID&C) assets, test articles, and other non-AEDC test peculiar support equipment and technology development labs and equipment used to conduct testing, checkouts, and general operations activities. Unless otherwise specified, this section includes operations at the AEDC GSUs. Fuel operations requirements are covered in Section 3.9. The test and test support assets are listed in Appendix A.
3.3.1. The Contractor shall provide requested test conditions during operation of test assets, test articles, and non-AEDC test support equipment.
Specific test conditions will be requested prior to the test via test period directives or via other designated communication methods and may also be requested during the actual test period execution. These requests may originate with the customer but are communicated to the operators via designated AEDC personnel depending on the location.
3.3.2. The Contractor shall direct the accomplishment of the test objectives during testing at the NFAC, LGTF, and AVSF.
The direction of test objectives includes ensuring that the test is executed according to the test period run plan but does not include providing specific instruction for the operation of the test facility and test article; these requirements are met in other sections of 3.3 and in 3.6 of this PWS.
The Contractor shall:
Support the Government to complete this requirement for testing conducted at Arnold AFB, Tunnel 9, LGTF, and AVSF;
Provide a Test Report for tests at the NFAC and NRTF.
3.3.3. The Contractor shall monitor, investigate, report, and take corrective action for all test data anomalies. Data anomalies include but are not limited to, individual channels that exceed the tolerance for measurement noise, dynamic and transient data that exhibit noise or signal characteristics that are inconsistent with the phenomena being measured, and other indicators that would indicate faulty test data.
3.3.4. The Contractor shall provide operational data for test facilities and test utilities.
Logs provide operational use data for analysis, historical record, and compliance with laws and regulations.
Deliverables:
A014 Daily Operating Time Log
A015 Title V Major Source Operations Log
3.3.5. The Contractor shall maintain data logs for maintenance and operation activities related to test articles and test peculiar support equipment.
Test peculiar support equipment are items that are either customer-supplied or AEDC-procured, such as a water brake, to support a specific test project or program. Logs are used to track operational usage, configuration changes, and maintenance actions.
The Contractor shall provide the test customer access to the Test Article Activity Log.
Deliverables:
A014 Daily Operating Time Log
A016 Test Unit Status Log
A017 Test Article Activity Log
3.3.6. The Contractor shall develop and document work instructions for operation and maintenance of test articles and test peculiar support equipment.
Operations or maintenance work instructions are required for customer-supplied equipment and test articles as well as procured test peculiar equipment that will be operated by the TOS II Contractor when procedures are not supplied. Any equipment to be added to the AEDC inventory as new Configuration Items upon test completion shall be accepted and conformed to the requirements in AEDC-STD-CM-1 Configuration Management.
The Contractor shall:
Develop work instructions for activities not currently addressed by existing work instructions;
Ensure operational work instructions reflect current asset configuration(s).
Deliverable:
A018 Operations and Maintenance Work Instructions
3.3.7. The Contractor shall provide and document requested maintenance for test articles and test peculiar support equipment.
Test article maintenance is typically performed by the customer or customer’s representative. The customer may request AEDC to perform or support a maintenance activity on their test article or test peculiar support equipment. This requirement may be documented in project documentation such as a SOC or may be a real-time request from the customer. Examples of maintenance activities: oil changes, borescope inspections, and failed customer-installed sensor change out.
Deliverable:
A017 Test Article Activity Log
3.3.8. The Contractor shall conduct and document receiving, receipt inspections and conduct preparation for return shipment or storage and return shipment for test articles and test peculiar support equipment.
This requirement includes any special inspections performed upon delivery to test article buildup areas or test areas and preparation activities conducted in test areas in order to prepare the test article or test peculiar support equipment for shipping. At Arnold AFB, this requirement includes the initial receipt inspections and excludes return shipments performed by the Facility Support Services (FSS) Contractor. At NFAC, this requirement includes the initial receipt inspections and return shipments through special agreements with
NASA. At Tunnel 9, NRTF, LGTF, and AVSF, this requirement includes initial receipt inspections and return shipments.
Deliverable:
A017 Test Article Activity Log
3.3.9. The Contractor shall provide test article and test peculiar support equipment installation designs, hardware, and software as required by the SOC for the project.
Designs, hardware, and software shall comply with applicable AEDC Engineering Standards, AEDC Safety, Health, and Environmental (SHE) Standards, AEDC Configuration Management Standard, Cyber standards, and AEDC Systems Engineering requirements and standards.
3.3.10. The Contractor shall build-up, install, re-configure, and remove test articles and test support equipment for test projects.
This requirement defines work in the fabrication, installation, test, and removal phases of a project including preparing for test execution, making required changes during testing, removing the test article, and returning test cell systems to a baseline configuration. Buildup, installation, re-configuration, and removal applies to all assets associated with the test including the test article, test peculiar support equipment, and test cell assets (e.g., thrust stands, data acquisition systems, model support systems). Specific requirements for these actions may come from the Test Manager, the Test Engineer, the test customer, or project documentation.
The Contractor shall document test article repairs or modifications not addressed in the SOC.
Deliverable:
A017 Test Article Activity Log
3.3.11. The Contractor shall operate steam plants IAW Unified Facilities Criteria (UFC) 3-430-02 FA Central Heating Boiler Plants and AFMAN 32-1068, Heating Systems and Unfired Pressure Vessels; at the NFAC, the Contractor shall also operate IAW the Bay Area Air Quality Management District.
The Contractor shall:
Notify and coordinate with the Government of pending boiler inspections;
Develop and utilize steam plant-specific work instructions for operation of the steam plants;
Add boiler inspection activities into the IMS.
Requirement 3.3.11 does not apply to Tunnel 9, NRTF, LGTF, or AVSF
3.3.12. Applicable Documents (Mandatory)
AFMAN 32-1068 Heating Systems and Unfired Pressure Vessels
AEDC-STD- CM-1 Configuration Management
AEDCOI 99-1 Lost Test Time
UFC 3-430-02 Central Heating Boiler Plants
TO 1T-38A-2-6 Org. Maint., T-38A Aircraft Powerplant
TO 2J-J85-6WC-11-WA-1 T-38 Power Pack Installation and Inspection
TO 2J-J85-9 Nondestructive Inspection Procedures
TO 2J-J85-54 J-85 Turbojet Engine Illustrated Parts Breakdown
TO 2J-J85-102 Corrosion Control / Cleaning Manual
TO 2J-J85-111-(1-2)-WA-1 Test, Troubleshooting, and Handling Maintenance Manual
TO 2J-J85-113-CD-1 Turbojet Engine J85 Technical Manual Set
TO 2J-J85-113-(1-10)-WA-1 Depot Maintenance Manual
TO 2J-J85-116-(1-11)-WA-1 Interim Maintenance Manual
TO 2J-J85-154 Support Equipment for J85 IPB
TO 6J3-2-16-13 Afterburner Control Overhaul Manual
TO 6J3-2-16-14 Afterburner Control IPB
TO 6J3-4-73-3 Main Fuel Control Overhaul Manual
TO 6J3-4-73-4 Main Fuel Control IPB
TO 33D4-6-264-1 Engine Control Kit Ops and Service Manual
TO 33D4-6-264-4 Engine Control Kit IPB
3.4 INTEGRATED SCHEDULING
AEDC uses an Integrated Scheduling process to manage the execution of the Complex’s T&E and non-test workload (activities).
This is the start of the file's text. The full file is on GovTribe.