Response to Industry's Comments Final Request for Proposal (RFP)

View the file

Other files

File Type Posted
Attachment_4_-_Service_Contract_Labor_Standards_Wage_Determination.pdf PDF
Attachment_5_-_Davis_Bacon_Wage_Decisions.pdf PDF
Amendment_0004.pdf PDF
Questions_from_Industry_Post_RFP_7_Oct.pdf PDF
Industry_Announcement_7Oct14.pdf PDF
Attachment_L-7 _Cross_Reference_Matrix_(Revised).pdf PDF
Questions_from_Industry_Post_RFP_Amd_0003.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Attachment_9 _Section_L.pdf PDF
Response_to_RFP_Comment.pdf PDF
Attachment_10 _Section_M.pdf PDF
TOS_Award_Fee_Plan_Amd_0001.pdf PDF
Wage_Determination_Nos._2061_2103_2491.pdf PDF
Attachment_L-8_-_Workload_Resource_Guide_with_cost_changes.pdf PDF
Amendment_0001.pdf PDF
Attachment_9 _Section_L.pdf PDF
CDRL_30000_30001_81861.pdf PDF
PWS_22_84_89_91.pdf PDF
Questions_from_Industry_Post_RFP_for_FBO.pdf PDF
Attachment_10 _Section_M.pdf PDF
Attachment_2 _Contract_Security_Classification_Specification _DD_Form_254.pdf PDF
Addtl_Responses_to_Draft_RFP_12Sep14.pdf PDF
Attachment_11_-_Government_Furnished_Property.pdf PDF
Attachment_7_-_Statement_of_Objectives.pdf PDF
Attachment_L-5_-_Subcontractor_Consent_Letter.pdf PDF
TOS_Request_for_Proposal.pdf PDF
Attachment_6_-_Award_Fee_Term_Plan.pdf PDF
Attachment_L-1_-_PPI_for_Offerors.pdf PDF
Attachment_L-6_-_Relevancy_Matrix.pdf PDF
Attachment_L-4_-_Client_Authorization_Letter.pdf PDF
Attachment_4_-_Service_Contract_Labor_Standards_Wage_Determinations.pdf PDF
Attachment_L-9_-_TOS_Cost_Model.xlsx XLSX spreadsheet
Attachment_8_-_Performance_Work_Statement.pdf PDF
Attachment_L-3 _PPQ_Cover_Letter.pdf PDF
Attachment_L-8_-_Workload_Resource_Guide.pdf PDF
Exhibit_A_-_Contract_Data_Requirements_List.pdf PDF
Attachment_10_-_Section_M.pdf PDF
Attachment_L-7_-_Cross_Reference_Matrix.pdf PDF
Attachment_L-2_-_Past_and_Present_Performance_Questionnaire.pdf PDF
Attachment_5_-_Davis_Bacon_Wage_Decisions.pdf PDF
Attachment_1_-_Workload_by_WBS.pdf PDF
Exhibit_B_-_Data_Item_Descriptions.pdf PDF
TOS_RFP_Cover_Letter_Atch.pdf PDF
Attachment_2_-_DD_Form_254.pdf PDF
Exhibit_C_-_Collective_Bargaining_Agreement_between_ATA_and_AEMTC_and_Affiliated_Unions.pdf PDF
Attachment_9_-_Section_L.pdf PDF
ppi_tool.accdb —
Additional_Responses_to_Draft_RFP_Comments.pdf PDF
Draft_RFP_Responses_to_Comments_and_Atch.pdf PDF
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to Industry’s Comments Final Request for Proposal (RFP)

Solicitation No. FA9101-13-R-0100, Test Operations and Sustainment 22 September 2014

Question

RFP Reference

Attachment 9, Section L

May the font and font size requirements be set aside for the information in the margins as it will only be logos, company identifiers, and required markings—RFP number, titles, disclosure text?

The font and font size requirements specified in Section L‐2.2.1.1 do not apply to company logos, identifiers, or required markings. However, please note the minimum font size requirements in L‐2.2.1.1 (b) for tables, charts, graphs, and figures.

L‐7.1 states that A through K should be included in Volume V. However the specific section callouts in L‐

7.1.1 through L‐7.l.4 do not ask for Sections C, D, E, F, and J. If all attachment listed in section J were printed as given in the RFP files they would account for ~1411 pages. Are we correct to assume that the Section C, D, E, F and the attachments from Section J are not required in Volume V unless specifically requested in Sections L‐7.2 or L‐7.3?

Sections A through K should be completed and returned in Volume V – Contract Documentation. The attachments from Section J are not required unless specifically requested in Sections L‐7.2 and L‐

7.3. Section L‐7.2 requires

exceptions to the solicitation requirements to be identified and the supporting rationale provided.

Section L‐7.3 requires Offerors to submit the following as attachments to the model contract:

‐ L-7.3.4.1, GFP and Base Support Requirements, a listing of Government furnished items required other than those listed in Attachment 11, Government Furnished Property.

‐ L‐7.3.4.2, Small Business Subcontracting Plan

‐ L‐7.3.4.3, OCI Mitigation Plan

‐ L‐7.3.4.4, Staffing Plan

‐ L‐7.3.4.5, Associate Contractor Agreements, letters of intent.

The RFP does not call out a requirement for the Major Subcontractors to submit a complete and separate Cost Volume proposal. Is it the Government’s intention that the Prime Offeror will submit one integrated cost proposal that satisfies the requirements in Section L‐6.0 including any supporting data/rates provided to the Prime Offeror from the Major Subcontractors?

Please see L‐6.4.5. If any subcontractor does not want to share detailed information with the prime, separate packages should be submitted to the Contracting Officer.

To the extent that separate sealed packages from subcontractors are included, the prime should include summary level information about the subcontractor.

We acknowledge that if separate subcontractor packages are submitted, the prime will not have fringe details to include in their submission. In that case, modify the formulas as needed in the cost model.

The RFP requires all pages to be numbered sequentially by volume. For the Past Performance Volume, the offerors must use the past performance information tool for printing relevant contract information. This tool has two separate print options: (1) Business Relationships, and (2) Past Performance. For each of these printed documents, the tool does not allow the offeror to change the starting page of the document (i.e., page numbering is automated by the tool); thus the Business Relationships and the Past Performance information both start on page 1 for each contract. This does not allow for sequential numbering of these two printed documents. Is it acceptable include these documents at the back of the Past Performance Volume with their automated numbering so that the remainder of the material (i.e., all except the Business Relationships and Past Performance print‐outs from the PPI Tool) can be sequentially numbered?

Yes.