Response_to_RFP_Comment_22Sep14.pdf

PDF 48 KB Posted

Attached to
Test Operations and Support Federal contract opportunity
Solicitation number
FA9101-13-R-0100
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Response to Industry's Comments Final Request for Proposal (RFP)

View the file

Other files for this federal contract opportunity

Other files attached to Test Operations and Support, newest first.
File Type Posted
Questions_from_Industry_Post_RFP_7_Oct.pdf PDF
Industry_Announcement_7Oct14.pdf PDF
Questions_from_Industry_Post_RFP_Amd_0003.pdf PDF
Amendment_0003.pdf PDF
Response_to_RFP_Comment.pdf PDF
Attachment_9 _Section_L.pdf PDF
Amendment_0001.pdf PDF
Attachment_9 _Section_L.pdf PDF
PWS_22_84_89_91.pdf PDF
CDRL_30000_30001_81861.pdf PDF
Questions_from_Industry_Post_RFP_for_FBO.pdf PDF
TOS_Award_Fee_Plan_Amd_0001.pdf PDF
Addtl_Responses_to_Draft_RFP_12Sep14.pdf PDF
Attachment_6_-_Award_Fee_Term_Plan.pdf PDF
Attachment_L-1_-_PPI_for_Offerors.pdf PDF
Attachment_L-4_-_Client_Authorization_Letter.pdf PDF
Exhibit_A_-_Contract_Data_Requirements_List.pdf PDF
Attachment_10_-_Section_M.pdf PDF
Attachment_L-9_-_TOS_Cost_Model.xlsx XLSX spreadsheet
Attachment_L-8_-_Workload_Resource_Guide.pdf PDF
Attachment_5_-_Davis_Bacon_Wage_Decisions.pdf PDF
Attachment_11_-_Government_Furnished_Property.pdf PDF
TOS_RFP_Cover_Letter_Atch.pdf PDF
Draft_RFP_Responses_to_Comments_and_Atch.pdf PDF
AGENDA_Final_20140610.pdf PDF
Attachment_2_-_DoD_Contract_Security_Classification_Specification_CORRECTED.pdf PDF
Industry_Day_No._4_Registration.pdf PDF
Combined_Test_Force_(CTF)_Briefing.pdf PDF
Attachment_7_-_Statement_of_Objectives.pdf PDF
Attachment_L-11__TOS_Cost_Model.xlsx XLSX spreadsheet
TOS_DRFP_Final_19_May.pdf PDF
Exhibit_A_-_DRAFT_Contract_Data_Requirements_List.pdf PDF
Attachment_4_-_Service_Contract_Act_Wage_Determinations.pdf PDF
Attachment_5_-_Davis_Bacon_Wage_Decisions.pdf PDF
Question_to_Industry_Quality_22Jan14.pdf PDF
Request_for_Information_No._4.pdf PDF
RFI_No._3.pdf PDF
Industry_Familiarization_Session.pdf PDF
RFI_No._3_Delay_10Sep13.pdf PDF
RFI_No._2_Amendment_01.pdf PDF
Atch_1 _REVISED_Agenda_Industry_Day_No._2_v7.pdf PDF
Atch_1 _REVISED_Agenda_Industry_Day_No._2_v5.pdf PDF
Atch_1 _REVISED_Agenda_Industry_Day_2_v4.pdf PDF
Revised_Agenda_for_Industry_Day__2.pdf PDF
Atch_1 _Agenda_for_Industry_Day_Draft.pdf PDF
Amendment_03_RFI_No._1.pdf PDF
CDRL_30001_30049.pdf PDF
CDRL_30100_81611.pdf PDF
Atch_2 _OCI_Clause.pdf PDF
Atch_1_-_PWS.pdf PDF
Show all 50

Test Operations and Support has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to Industry’s Comments Final Request for Proposal (RFP)

Solicitation No. FA9101-13-R-0100, Test Operations and Sustainment 22 September 2014

Question

RFP Reference

Attachment 9, Section L

May the font and font size requirements be set aside for the information in the margins as it will only be logos, company identifiers, and required markings—RFP number, titles, disclosure text?

The font and font size requirements specified in Section L‐2.2.1.1 do not apply to company logos, identifiers, or required markings. However, please note the minimum font size requirements in L‐2.2.1.1 (b) for tables, charts, graphs, and figures.

L‐7.1 states that A through K should be included in Volume V. However the specific section callouts in L‐

7.1.1 through L‐7.l.4 do not ask for Sections C, D, E, F, and J. If all attachment listed in section J were printed as given in the RFP files they would account for ~1411 pages. Are we correct to assume that the Section C, D, E, F and the attachments from Section J are not required in Volume V unless specifically requested in Sections L‐7.2 or L‐7.3?

Sections A through K should be completed and returned in Volume V – Contract Documentation. The attachments from Section J are not required unless specifically requested in Sections L‐7.2 and L‐

7.3. Section L‐7.2 requires

exceptions to the solicitation requirements to be identified and the supporting rationale provided.

Section L‐7.3 requires Offerors to submit the following as attachments to the model contract:

‐ L-7.3.4.1, GFP and Base Support Requirements, a listing of Government furnished items required other than those listed in Attachment 11, Government Furnished Property.

‐ L‐7.3.4.2, Small Business Subcontracting Plan

‐ L‐7.3.4.3, OCI Mitigation Plan

‐ L‐7.3.4.4, Staffing Plan

‐ L‐7.3.4.5, Associate Contractor Agreements, letters of intent.

The RFP does not call out a requirement for the Major Subcontractors to submit a complete and separate Cost Volume proposal. Is it the Government’s intention that the Prime Offeror will submit one integrated cost proposal that satisfies the requirements in Section L‐6.0 including any supporting data/rates provided to the Prime Offeror from the Major Subcontractors?

Please see L‐6.4.5. If any subcontractor does not want to share detailed information with the prime, separate packages should be submitted to the Contracting Officer.

To the extent that separate sealed packages from subcontractors are included, the prime should include summary level information about the subcontractor.

We acknowledge that if separate subcontractor packages are submitted, the prime will not have fringe details to include in their submission. In that case, modify the formulas as needed in the cost model.

The RFP requires all pages to be numbered sequentially by volume. For the Past Performance Volume, the offerors must use the past performance information tool for printing relevant contract information. This tool has two separate print options: (1) Business Relationships, and (2) Past Performance. For each of these printed documents, the tool does not allow the offeror to change the starting page of the document (i.e., page numbering is automated by the tool); thus the Business Relationships and the Past Performance information both start on page 1 for each contract. This does not allow for sequential numbering of these two printed documents. Is it acceptable include these documents at the back of the Past Performance Volume with their automated numbering so that the remainder of the material (i.e., all except the Business Relationships and Past Performance print‐outs from the PPI Tool) can be sequentially numbered?

Yes.