Amendment_0004.pdf

PDF 14 KB Posted

Attached to
Test Operations and Support
Solicitation number
FA9101-13-R-0100
Issued by

About this file

Amendment 0004

View the file

Other files

File Type Posted
Attachment_4_-_Service_Contract_Labor_Standards_Wage_Determination.pdf PDF
Attachment_5_-_Davis_Bacon_Wage_Decisions.pdf PDF
Questions_from_Industry_Post_RFP_7_Oct.pdf PDF
Industry_Announcement_7Oct14.pdf PDF
Attachment_L-7 _Cross_Reference_Matrix_(Revised).pdf PDF
Questions_from_Industry_Post_RFP_Amd_0003.pdf PDF
Amendment_0003.pdf PDF
Response_to_RFP_Comment_22Sep14.pdf PDF
Amendment_0002.pdf PDF
Attachment_9 _Section_L.pdf PDF
Response_to_RFP_Comment.pdf PDF
Attachment_10 _Section_M.pdf PDF
TOS_Award_Fee_Plan_Amd_0001.pdf PDF
Wage_Determination_Nos._2061_2103_2491.pdf PDF
Attachment_L-8_-_Workload_Resource_Guide_with_cost_changes.pdf PDF
Amendment_0001.pdf PDF
Attachment_9 _Section_L.pdf PDF
CDRL_30000_30001_81861.pdf PDF
PWS_22_84_89_91.pdf PDF
Questions_from_Industry_Post_RFP_for_FBO.pdf PDF
Attachment_10 _Section_M.pdf PDF
Attachment_2 _Contract_Security_Classification_Specification _DD_Form_254.pdf PDF
Addtl_Responses_to_Draft_RFP_12Sep14.pdf PDF
Attachment_11_-_Government_Furnished_Property.pdf PDF
Attachment_7_-_Statement_of_Objectives.pdf PDF
Attachment_L-5_-_Subcontractor_Consent_Letter.pdf PDF
TOS_Request_for_Proposal.pdf PDF
Attachment_6_-_Award_Fee_Term_Plan.pdf PDF
Attachment_L-1_-_PPI_for_Offerors.pdf PDF
Attachment_L-6_-_Relevancy_Matrix.pdf PDF
Attachment_L-4_-_Client_Authorization_Letter.pdf PDF
Attachment_4_-_Service_Contract_Labor_Standards_Wage_Determinations.pdf PDF
Attachment_L-9_-_TOS_Cost_Model.xlsx XLSX spreadsheet
Attachment_8_-_Performance_Work_Statement.pdf PDF
Attachment_L-3 _PPQ_Cover_Letter.pdf PDF
Attachment_L-8_-_Workload_Resource_Guide.pdf PDF
Exhibit_A_-_Contract_Data_Requirements_List.pdf PDF
Attachment_10_-_Section_M.pdf PDF
Attachment_L-7_-_Cross_Reference_Matrix.pdf PDF
Attachment_L-2_-_Past_and_Present_Performance_Questionnaire.pdf PDF
Attachment_5_-_Davis_Bacon_Wage_Decisions.pdf PDF
Attachment_1_-_Workload_by_WBS.pdf PDF
Exhibit_B_-_Data_Item_Descriptions.pdf PDF
TOS_RFP_Cover_Letter_Atch.pdf PDF
Attachment_2_-_DD_Form_254.pdf PDF
Exhibit_C_-_Collective_Bargaining_Agreement_between_ATA_and_AEMTC_and_Affiliated_Unions.pdf PDF
Attachment_9_-_Section_L.pdf PDF
ppi_tool.accdb —
Additional_Responses_to_Draft_RFP_Comments.pdf PDF
Draft_RFP_Responses_to_Comments_and_Atch.pdf PDF
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

22 APR 2015

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY AEDC/SSO CODE 7. ADMINISTERED BY (If other than Item 6) CODE

AEDC/SSO

1307 SCHRIEVER AVE

ARNOLD AFB, TN 37389-5100

JOE D. WARREN 931-454-5933

AEDC.SSO@US.AF.MIL

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

TO ALL POTENTIAL OFFERORS:

FA9101-13-R-0100

X 9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.

Offers must acknowledge receipt of this amendment prior to he hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM

10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 0 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible )

See Schedule of Changes

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.14.1 FAR (48 CFR) 53.243 Created 11 Sep 2014 3:40 PM

SCHEDULE OF CHANGES

FA9101-13-R-0100 0001

The purpose of this amendment is to:

A. Clarify that the Firm-Fixed-Price Phase-In, CLIN 0001, is not included in the Government’s Most Probable Cost calculation (Reference M-2.4.1).

M-2.4.1 is hereby changed to read “The Offeror’s Cost / Price proposal will be evaluated by the Most Probable Cost (MPC) computed by the Government for the basic requirements (basic award exclusive of CLIN 0001 Phase-In), option periods, and award terms. The Offeror’s proposed estimated costs shall not be controlling for source selection purposes. MPC shall be the Government’s estimate of anticipated performance costs plus any fee anticipated to be awarded.”

B. Attachment 4 Service Contract Labor Standards Wage Determination and Attachment 5 Davis

Bacon Wage Decisions are replaced by the attached revisions which include the most current versions of the applicable wage determinations.

File details come from the government source that posted it. Updated .