Attachment L-8 Workload Guide (Revised)
View the file
Other files for this federal contract opportunity
Show all 50
Test Operations and Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOS
FA9101-13-R-0100
Amendment 0001 Attachment 9
Attachment L-8
WORKLOAD RESOURCE GUIDE
(FY16 Government Estimate)
The Government has prepared this estimate to assist the offerors in quantifying the work described in the Performance Work Statement (PWS). Table L-8.1, Test Workload, presents the test workload by cell in operational units and is the baseline workload for this proposal. This test workload shall be held constant over the entire contract period for purposes of proposal preparation. Table L-8.2, FY16 Government Estimate, represents the labor hours (including overtime) estimated to accomplish the FY16 workload assuming accomplishment of the AEDC mission under the current contract structure.
The workload estimates are presented in terms of the AEDC Work Breakdown Structure (WBS) format. A map showing the approximate linkage between the PWS and the AEDC WBS is provided at Table L-8.3. The FY16 Government estimate was determined by averaging the workload in the various test facilities over the last 10 years and by guidance from functional area managers where averages were deemed not indicative.
Offerors should consider this Government estimate as a guide only. We anticipate Offerors outlining initiatives to accomplish the PWS with different resource levels including reapportionment of labor hours and/or reduced staffing. We expect to see these initiatives outlined in the Technical Volume and the results reflected in the Cost proposal.
Staffing levels must be fully supported showing a clear understanding of the work and providing a high confidence level for achieving proposed reductions. Proposed staffing reductions based on increased productivity must be specifically identified and explained in detail. Ambiguous or unrealistic assumptions regarding increased productivity are not acceptable and will negatively impact evaluation of your proposal. Reducing the scope of work defined by this baseline or proposing to shift work to other Government contractors are not acceptable approaches.
Total resources available in any fiscal year are based upon a budget subject to Congressional approval and funding allocation to AEDC. Therefore, it may be necessary to adjust the contract resources during phase-in and prior to performance to accommodate actual funding availability for FY16.
Amendment 0001 Attachment 9
Table L-8.1 (Highlights indicate change from RFP)
TEST CELLS Units Number
16S UOH 50
16T UOH 3,650
4T UOH 845
ABC UOH 1,285
Flight Systems Prep Work Mhrs 5,176
NFAC UOH 1,460
NFAC Test Prep Work Mhrs 11,335
Small (T5/11/12,SL2/3) AOH 335 Small (SL1/2/3 Sea Level) SLOH 1,325 Medium (T1,T2,T4,J1,J2) AOH 517 Large (C1/C2) AOH 340 C1 Sea Level SLOH 268
T3 AOH 4
APTU Runs 11 Aeropropulsion Prep Work Mhrs 50,000
Chambers - 12V OSH ‐ Chambers - Mark I OSH
Chambers - Research OSH
Chambers - Complex OSH 1,831 STAT Mhrs 360
NWE (MBS) WEEK
J4/J6 Firings 4 Arcs (total) Runs 36 H1 Runs 22 H2 Runs 7 H3 Runs 8 Range G/I Shots 9 Range S Shots
AMSC Mhrs 35,000
Tunnel 9 OccDays 60
Technology/Foreign Tech Mhrs 54,084
UOH - User Occupancy Hour - All of the facility available productive hours after the test article is installed in the facility until the start of removal of the test article from the facility. For clarification - available means scheduled shift hours - if 2 shift ops the max available in a day would be 16 hours without overtime. UOH does not include downtime
Amendment 0001 Attachment 9 hours or hours where scheduled maintenance prevents the customer from making productive use of the time.
AOH: Air-On-Hour are tracked to measure progress of a test relative to the AOHs specified in the Statement of Capability and any subsequent project change agreements to add or reduce AOHs. The AOH does not include the pre-test checks and operation of the plant equipment or the posttest securing of the equipment. Air-On is declared by an event which is usually the opening of an isolation valve. Air-off is declared by when the test cell isolation valves are closed and it is safe to begin the test cell entry procedure.
The total power used during pre-operation, test and post operation is billed to the customer along with the direct labor charges for facility operations.
SLOH: Sea-Level-Air-On-Hour are tracked to measure progress of a test relative to the SLOH specified in the Statement of Capability and any subsequent project change agreements to add or reduce SLOHs. SLOH do not include pre-test checks or posttest checks and securing of supporting systems. The SLOH is declared by the test engineer upon confirmation that all supporting systems are ready for testing. Sea-Level air-off is declared once the engine throttle is put in the engine off position.
Occupancy Day. The base unit (i.e., final cost objective) used for charging the direct costs of Tunnel 9 operations to a customer. An occupancy day is based on a contiguous period of operations where both the operations staff and the test capability are dedicated to the support of a customer test program.
Shot: A shot is the measure of progress for an AEDC Hypervelocity Flyout, Impact, and Lethality Ground T&E project, relative to the number of shots specified in the Statement of Capability and any subsequent Project Change Agreements to increase or decrease the number of shots on the project. A shot starts at T=0 and consists of the firing of the two-stage light-gas gun (ignition of the powder charge). A typical shot lasts ~40 milliseconds. If the gun does not fire, another attempt of the shot may be executed. A shot does not include pre-test checks nor post-test securing of the aeroballistic range.
Firing: A firing is the measure of progress of an AEDC Solid Rocket Motor Ground T&E project, relative to the number of firings specified in the Statement of Capability and any subsequent Project Change Agreements to increase or decrease the number of firings on the project. A firing starts at T=0 and consists of rocket motor ignition, running the length of time specified in the test plan/matrix, thrust termination, and shutdown. A typical firing lasts ~60 seconds. If the firing is aborted before T=0, another attempt of that firing may be executed. A firing does not include pre-test checks nor post-test securing of the rocket test cell.
Run: A run is the measure of progress of an AEDC High-Temperature Materials Characterization and Evaluation project, relative to the number of runs specified in the Statement of Capability and any subsequent Project Change Agreements to increase or decrease the number of runs on the project. A run starts at T=0 and consists of energizing the arc-heater, ramping to conditions, probe verification of conditions, on-point data
Amendment 0001 Attachment 9 collection with multiple test samples, and shutdown. A run can last 1-30 minutes and, depending on test requirements, can test up to ten test articles and probes in a single run.
If the run is aborted before T=0 another attempt of that run may be executed. A run does not include pre-test checks or post-test securing of the arc-heater test cell.
Operation Shift Hour (OSH): An OSH is the measure of progress of an AEDC High- Altitude / Space Environmental Effects and Sensor Ground T&E project, relative to the number of OSHs specified in the Statement of Capability and any subsequent Project Change Agreements to increase or decrease the number of OSHs on the project. An OSH starts at T=0 and consists of evacuating and cooling the chamber, establishing test conditions, on-condition data collection, and warm-up and re-pressurizing the chamber.
A typical test can last 720 OSHs. Pre-test checks, post-test securing of the space chamber and performance of data analysis and reporting do not result in OSHs.
Amendment 0001 Attachment 9
Table L-8.2 Displays the government estimate in hours (regular plus overtime) for FY16
WBS WBS Description Hours
1.0 IT&E Management 24,268
1.1.1 Aeropropulsion Products 303,998
1.1.2 Flight Systems Products 260,000
1.1.3 Space & Missile Test 84,280
1.2.1 Aeropropulsion Technology/A&E 10,917
1.2.2 Flight Systems Technology/A&E 8,583
1.2.3 Space & Missile Technology/A&E 15,699
1.2.5 M&S/I&D/A&E 44,145
1.2.6 Technology/A&E Maint & Mgmt 11,518
1.2.9 Capabilites Planning 9,539
1.3.1 Turbine Technology RBA 2,780
1.3.2 Flight Systems Technology RBA 196
1.3.3 Space & Missile Technology RBA 43,118
1.3.4 Hypersonic T&E S&T 9,630
1.3.5 Core Tech RBA (M&S/I&D/A&E) 31,590
1.3.6 Foreign Technology RBA 8,127
1.4.1 Hypersoncis Management 29,609
1.4.2 Hypersonic Products 367
1.4.3 Tunnel 9 Product Cost 8,884
1.5.1 NFAC Management 88,120
1.5.2 NFAC Products 30,000
2.1.1 ETF Investments 127,248
2.1.2 PWT Investments 122,595
2.1.3 Space & Missile Fac Inv 51,688
2.1.4 VKF Plant Investments 75,057
2.1.5 CORE & Support Fac Innovation 44,145
3.1.1 Aeropropulsion Asset Stewardship 57,350
3.1.2 Flight Systems Asset Stewardship 47,257
3.1.3 Space & Missile Asset Stewardship 54,714
3.1.4 Plant Asset Stewardship 422,000
3.1.6 Safe Reliable Effective Operations 17,975
3.2.1 Machine & Fab, TMDE, and Chem Lab 59,316
4.1.2 Industrial Security 3,620
4.2 Environmental Management 5,430
4.3.1 Facility Plans & Programs, Sustainment, and 163,840
4.5.1 Logistics Support & Purchasing 25,026
4.3.6 Utitlies 203,159
5.1.1 ID&C Maintenance & Info Assurance 105,888
6.1.2 Corporate Services/Mgmt/Admin 94,841
6.2 Safety 10,860
6.3 Quality 10,288
Total 2,727,663
Amendment 0001 Attachment 9
WBS TOS WBS Description
P W
S D es cr ip ti on
.1 T es t an d E va lu at io n
.2 T ec h n o lo gy P ro je ct s
.3 O p er at io n o f Te st A ss es ts a n d T es t
A rt ic le s
.4 In te gr at ed
S ch ed u lin g
.5 L if ec yc le S u st ai n m en t o f Te st a n d
Te st S u p p o rt A ss et s
.6
ID
C E n gi n ee ri n g Se rc ie s an
Li fe cy cl e Su st ai n m en t
.7 T es t M ea su re m en t an d D ia gn o ic
Eq u ip m en t (T M D E) M an ag em en t
.8 C ap it al Im p ro ve m en ts
.9 P ro vi d e Fu el s M an ag em en t
Se rv ic es
.1 M ac h in in g/ Fa b ri ca ti o n a
C h em ic al /M at er ia l A n al ys is
.1 O p er at io n s an d L if ec yc le
Su ai n m en t o f A
ED
C B as e Su p p o rt
A ss et s
.1 U ti lit ie s G en er al S u p p o rt
.1 D at a an d d o cu m en ta ti o n f o r A
ED
C co fi gu ra ti o n it em s
.1 A
ED
C G ro u n d , W ea p o n s
Sy em
S af et y P ro gr am s
.1 S en si ti ve C o m p ar tm en te
In fo rm at iu o n
SC
I)
.1 F in an ci al M an ag em en t
.1 A cq u is it io n o f su p p lie s, s er vi ce s, e q u ip m en t
.1 In te rf ac e M an ag em en t
.1 G en er al M an ag em en t
.2 S tr at eg ic P la n n in g
.2 F o re ig n T ec h n o lo gy
.2 P u b lic A ff ai rs
.2 R ea l P ro p er ty M an ag em en t
A cc o u n ta b ili ty S er vi ce s
.2 C o n ti n u o u s Im p ro ve m en t
P ro gr am
.2 In te gr at ed p er fo rm ce m ag em en t p ro gr am
1.0 IT&E Management
1.1.1 Aeropropulsion Products
1.1.2 Flight Systems Products
1.1.3 Space & Missile Test
1.2.1 Aeropropulsion Technology/A&E
1.2.2 Flight Systems Technology/A&E
1.2.3 Space & Missile Technology/A&E
1.2.5 M&S/I&D/A&E
1.2.6 Technology/A&E Maint & Mgmt
1.2.9 Capabilites Planning
1.3.1 Turbine Technology RBA
1.3.2 Flight Systems Technology RBA
1.3.3 Space & Missile Technology RBA
1.3.4 Hypersonic T&E S&T
1.3.5 Core Tech RBA (M&S/I&D/A&E)
1.3.6 Foreign Technology RBA
1.4.1 Hypersoncis Management
1.4.2 Hypersonic Products
1.4.3 Tunnel 9 Product Cost
1.5.1 NFAC Management
1.5.2 NFAC Products
2.1.1 ETF Investments
2.1.2 PWT Investments
2.1.3 Space & Missile Fac Inv
2.1.4 VKF Plant Investments
2.1.5 CORE & Support Fac Innovation
3.1.1 Aeropropulsion Asset Stewardship
3.1.2 Flight Systems Asset Stewardship
3.1.3 Space & Missile Asset Stewardship
3.1.4 ETF Plant Asset Stewardship
3.1.5 High Pressure Air Costs
3.1.6 Safe Reliable Effective Operations
3.2.1 Machine & Fab, TMDE, and Chem Lab
4.1.2 Industrial Secuirty
4.2 Environmental Management
4.3.1 Facility Plans & Programs, Sustainment, and
Investments
4.5.1 Logistics Support & Purchasing
4.3.6 Utitlies
5.1.1 ID&C Maintenance
6.1.2 Corporate Services/Mgmt/Admin
6.2 Safety
6.3 Quality
Hours for PWS element primarily in WBS
Table L. 8‐3
Hours included throuhout WBS elements indicating that some work done in WBS