07 Attachment L-07 Quality Control Manager Experience Outline.docx

DOCX document 27 KB Posted

Attached to
Roofing, Repair, and Replacement Follow-on (R3F) Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ)
Solicitation number
FA890326R0009
Issued by

About this file

This is a template and qualification documentation form for proposing a Quality Control Manager (QCM) in response to the Air Force's Roofing, Repair, and Replacement Follow-on (R3F) Multiple Award Task Order Contract (MATOC) IDIQ solicitation (FA890326R0009). The form requires offerors to document the proposed QCM's qualifications, including current employment status, total years of experience as a QCM, and a breakdown of experience in DoD or commercial roofing construction versus commercial/private sector work. The template mandates that the proposed individual must be currently employed in accordance with solicitation Section L&M paragraph 2.1.5.

The form requires submission of three project examples demonstrating at least five years of QCM experience in DoD or commercial roofing construction. For each project, offerors must provide the project title, location or DoD installation, total project value, project dates (which must fall within five years of the RFP date), the contractor firm name, and a certification statement confirming the individual served in the QCM role throughout all pre-construction activities and for at least half of the field construction duration. The submission is limited to three pages total for project documentation. Experience years must be rounded to 0.25, 0.5, or 0.75 increments, and DoD experience plus commercial/private sector experience must equal the stated total years of experience.

View the file

Other files

File Type Posted
(FLATTENED) FA890326R00090001 - R3F Solicitation Amendment (14 Apr 2026).pdf PDF
(FLATTENED) FA890326R0009 - R3F Solicitation.pdf PDF
FA890326R00090001 - R3F Solicitation Amendment (14 Apr 2026).pdf PDF
04 Attachment L-04-01 Bases by Region Maps and List (9 Apr 2026).docx DOCX document
09 Attachment - R3F Q and A FINAL (9 Apr 2026).xlsx XLSX spreadsheet
03 Attachment L-03 Roofing Contract Evaluation (9 Apr 2026).xlsx XLSX spreadsheet
01 Attachment - R3F Statement of Work FINAL (9 Apr 2026).docx DOCX document
06 Attachment L-06 Project Manager Outline (9 Apr 2026).docx DOCX document
08 Attachment L-08 PIEE - Vendor Registration Instructions.docx DOCX document
02 Attachment L-02 Q and A Template.docx DOCX document
06 Attachment L-06 Certified Roofing Installer Project Manager Outline.docx DOCX document
03 Attachment L-03 Roofing Contract Evaluation.xlsx XLSX spreadsheet
04 Attachment L-04 Regional Experience Outline.docx DOCX document
05 Attachment L-05 Superintendent Experience Outline.docx DOCX document
L-03 Roofing Contract Evaluation.xlsx XLSX spreadsheet
L-06 Certified Roofing Installer Project Manager Outline.docx DOCX document
L-08 PIEE Vendor Registration.docx DOCX document
01 Attachment - R3F Statement of Work FINAL 10 Mar 2026.docx DOCX document
L-04 Regional Experience Outline.docx DOCX document
L-07 Quality Control Manager Experience Outline.docx DOCX document
L-02 Q and A Template.docx DOCX document
FA890326R0009 - R3F Solicitation.pdf PDF
L-05 Superintendent Experience Outline.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L-07 Quality Control Manager Experience Outline

· Name of Proposed Quality Control Manager (QCM):

· Current Employer: [Must be employed IAW Section L&M para 2.1.5]

· Total Years of Experience as a QCM:

· Years Experience performing DoD or Commercial Roofing Construction/Roofing as a QCM:

· Years Experience in the Commercial/Private Sector as a QCM:

· [Note 1: Ensure DoD + Commercial/Private Experience = Total Years]

· [Note 2: Round the “years” to .25, .5, or .75, as applicable]

· General narrative description of experience to capture at least five years of experience working DoD or Commercial Roofing Construction specifically as a Quality Control Manager.

Role/General Work Type [Highlight role and DoD Construction experience] Claiming DoD Exp (Yes or No)

Company Name
Month/Year Worked
Total Years DoD Construction as QCM

Total Qualified Experience

[Project # (1 or 2) – Project Title]

· Individual’s Employer (Construction Firm) for this project:

· Role/Position Served: [Quality Control Manager]

· Project Title:

· Location or DoD Installation where work was performed:

· Total Value:

· Date of Project [or “Phase” if applicable]: [Must be within 5 years of this RFP date]

· Provide a statement certifying the extent the individual served in the identified role for that project. (At a minimum, they must have served in that role for all pre-construction activities, and at least half of the field construction duration of the project.)

*Instructive language show in [Italics]. Offerors must delete or modify instructive language. Ensure three (3) projects are submitted. Do not submit more than three (3) pages total for project.