Pre-Proposal Forum Questions
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM #
| PAGE |
| LINE |
| COMMENT |
| RATIONALE |
| RESPONSE |
| 1. |
| Page 9 of 41 |
| 4.9.6, 4.9.6.1 |
| The government requires offerors provide a Small Business Participation Commitment Document (SBPCD) as part of our submission with the proposal. The Government did not provide this document on the final February 15th RFP release. Is it the Government’s intent for offerors to use the Small Business Participation Commitment Document provided 11-16-17? |
Is now posted in FBO as Attachment 5
2.
4.9.7 Attachment 6 to Volume I: Small Business Subcontracting Plan
4.9.7.1 “The Offeror shall submit a Small Business Subcontracting Plan as Volume I, Attachment 3 that meets the requirements addressed in FAR 19.704 and 52. 219-9, as supplemented. If the Offeror has an approved master subcontracting plan (see FAR 19.704(b) and 52.219-(f)) or an approved comprehensive subcontracting plan (see DFARS 219.702), the Offeror shall submit a program specific addendum as Attachment 3 covering any additional information required by this solicitation. The addendum shall incorporate the master or comprehensive plan by reference and the Offeror shall include the master comprehensive plan as an attachment to Volume IV. If the offeror is a small business, no plan is required.”
Question: Please clarify if it is Attachment 6 or Attachment 3.
This should state “shall submit a Small Business Subcontracting Plan as Volume I, Attachment 6”.
| 3. |
| Page 9 of 41 |
| 4.9.7, 4.9.7.1 |
| “Subfactor Four – Small Business Participation: This requirement is met when the offeror’s submitted Exhibit D, Small Business Participation Commitment Document, as well as a Small Business Subcontracting Plan (Exhibit E) if the offeror is a large business, meets or exceeds the minimum quantitative requirement (MQR) of 8% of the total contract value in awards to small businesses.” |
Question: The Section L references 2 documents and provides exhibit identification. But these document templates were not released with the final RFP. Can the government provide Exhibit D and Exhibit E for format and content requirements?
Changed Section M Para 5.1.4 to “This requirement is met when the offeror’s submitted Attachment 5, Small Business Subcontracting Commitment Document, as well as a Small Business Subcontracting Plan (Attachment 6), if the offeror is a large business, meets or exceeds…”. Additionally, Identified that SubFactor 4 is submitted under Volume I and does not count towards overall page limitation.
| 4. |
| Page 10 of 41 |
| 5.0, 5.1 |
| Table 3 – Volume II – Organization |
Volume II, Table 3 is the Volume organization according to the solicitation. Will the Government confirm that it requires offerors to also provide Factor I – Past Performance (Volume III) as part of Volume II – Technical.
Past Performance is submitted under Volume III and will not be evaluated under Volume II. The Factor is identified for completeness and it is annotated to be in Volume III. No past performance information should be in Volume II.
| 5. |
| PWS pg8, 3.1.4 |
| PWS 3.1.4 |
| Is the 30-day backfill (to present a suitable candidate for SAP processing) counted from date of notification of termination or resignation, or is it when the vacancy actually occurs. |
PWS states when vacancy occurs the 30 day period begins (See PWS 6.1.1(5)).
| 6. |
| Sec L, page 9 |
| 4.9.6.1 - 4.9.7.1 |
| This paragraph requires the Small Business Participation Commitment Document (SBPCD) and Small Business Subcontracting Plan to be delivered with Volume I as Attachments 5 and 6. It is also implied in Paragraph 5.3.4.1, on page 12 of Sec L that this plan must also be submitted with Volume II as Subfactor 4. |
| Is it the Government’s intent that the Small Business Participation Commitment Document (SBPCD) and Small Business Subcontracting Plan be submitted in its entirety in both Volumes I and II? If yes, then will the government exclude the requirements from the page count within Volume II? |
The Draft RFP CRM Item 42 states that this issue was corrected in Section L, now para 4.9.7.1, but it reads the same.
As identified above Sub Factor 4 supporting documentation is submitted under Volume I and does not count towards overall page limitation in Volume II.
| 7. |
| Sec L, pages 5-6 |
| 3.2.2 |
| This paragraph requires that font size must not be less than 12 point. |
| Will the Government allow less than 12-point font to be used in tables/graphics? |
The Draft RFP CRM Item 51 states that 8 point font is fine for tables and graphics, Section L, para 3.2.2, but it reads the same.
Para 3.2.2 has been revised to allow 8 point font for tables/graphics and identifies Times New Roman as the correct font.
| 8. |
| Sec L, page 10 |
| 5.1, Table 3 |
| This Table, outlining Volume II – Technical has a reference to Factor 1 – Past Performance. |
| Is it the Government’s intent that volume II includes a reference to the Past Performance volume? |
The Draft RFP CRM Item 54 states that the reference to Factor I – Past Performance has been removed from Table 3, but it reads the same.
Past Performance is submitted under Volume III and will not be evaluated under Volume II. The Factor is identified for completeness and it is annotated to be in Volume III. No past performance information should be in Volume II.
| 9. |
| Sec L, page 17 |
| 7.1.1 |
| There are two section 4’s identified. |
| Will the Government clarify that the second section 4 should read section 5? |
The Draft RFP CRM Item 56 states that the second “section 4” in L, para 7.1.1 would be changed to section 5, but it reads the same.
Revised, Cost Attachment should be Section 5.
| 10. |
| Sec M, page 5 |
| 6.2.1.1 |
| There are two paragraph 6.2.1.1s. |
| Will the Government clarify that the second instance of “6.2.1.1” should be 6.2.1.3? |
The Draft RFP CRM Item 80 states that the second para 6.2.1.1 in L has been corrected, but it reads the same.
Corrected to read 6.2.1.3.
| 11. |
| Sec L |
Para 4.8.7.2 Sec M Para 5.1.4
| N/A |
| Section L states a small business subcontracting goal of at least 8% of total proposed cost. Section M states the 8% is a “minimum quantitative requirement”. Recommend aligning the Section L verbiage to match the Section M verbiage. |
| Clarity of Government requirement. We assume the Section M language is the correct verbiage (requirement vs. goal). L and M should be consistent. |
The Draft RFP CRM Item 13 states that the language in L and M were aligned, but they still read the same.
Both documents state 8% is the minimum requirement. Term goal was revised to read requirement.
| 12. |
| FACTS Sheet |
Item P.
| N/A |
| This asks if the contract effort discussed was for a previous WR-ALC procurement. This would not seem to be relevant for this SMC solicitation. Recommend deleting this question or changing the “WR-ALC” to “SMC”. |
| Clarity of Government Requirements. |
The Draft RFP CRM Item 86 states that WR-ALC was changed to SMC, but it reads the same.
Revised to read Space and Missile Systems Center (SMC)
| 13. |
| Sec L, page 15 |
| 6.3.6 |
| Within the FACTS sheet, paragraph J.1 states that descriptions of work are limited to two pages “…beyond the page limitation of the FACTS sheet information.” |
As the FACTS sheet itself is over five pages long before any information has been added, is it the Government’s position that the FACTS and related information is effectively 8 pages?
The Relevance table instructions also allows two pages for the relevance table, making the information effectively 10 pages?
Given that past performance is the most important factor in the overall evaluation will the government consider removing the severe page limit restrictions and allow 12-15 pages for each FACTS Sheet and associated information?
| Clarity and alignment to importance of the evaluation factors . |
| Paragraph 6.3.6 of Section L has been revised to read, The answering space on the FACTS Sheet may be expanded so that the filled-in FACTS Sheet for each relevant contract covers increases no more than both sides of three (3) 8 ½ x 11 inch pages (i.e., no more than six (6) pages). |
| 14. |
| Page 3 |
| Relevance Table |
| We have several questions about the relevancy table: |
1. Item 1, Nature of Business Area(s) involved. What is the difference between this area and paragraph J.1. Brief Description of Effort?
1. Item 2. Required Levels of Technology. What is the government looking for?
1. Item 3. Materials and Production Processes. Why is this being asked for a services contract? Is the government looking for something specific?
| Clarity |
| Within this table if an offeror feels that a section does not apply, they may input N/A. This table assists the PCO in evaluating relevancy so please be as specific as possible as they relate to the offeror. |
| 15. |
| PWS, Attachment IV Position Descriptions |
| Education Requirements |
| The Government has allowed for experience in lieu of degrees throughout the position descriptions within the PWS. However, the PWS does not provide clarification for situations in which the proposed personnel possesses a lesser degree than required. |
| Will the Government accept an understood experience equivalency as follows: |
· In lieu of a Bachelors Degree, 4 additional years of experience or an Associates degree and 2 years of additional experience are required.
· In lieu of a Masters Degree, 6 additional years of experience or a Bachelors and 2 years additional experience is required.
Will revise PWS - Permitting combination of degree(s) and relevant experience. Experience values: Associates Degree = 2 years, Bachelor’s Degree = 4 years, Master’s Degree = 6 years
| 16. |
| 12 |
| L.5.3.4.1 |
| In Volume I Solicitation Documentation both the Small Business Participation Commitment Document (SBPCD) (attachment 5) and the Small Business subcontracting plan (attachment 6) are attachments to the volume. In section M 5.1.4 the government states SBPCD (Exhibit D) and the Small Business subcontracting plan (Exhibit E) Since the SBPCD and Small Business Subcontracting plan are listed in Section M as exhibits and the offers Small Business Subcontracting plan is a company mandated compliance document would the government remove as part of the page count in Volume II – Technical and make them exhibits as they are stated in Section M 5.1.4? |
| Clarification |
| Changed Section M Para 5.1.4 to “This requirement is met when the offeror’s submitted Attachment 5, Small Business Subcontracting Commitment Document, as well as a Small Business Subcontracting Plan (Attachment 6), if the offeror is a large business, meets or exceeds…”. |
| 17. |
| L pg. 11 of 41 |
| 2 |
| In Section L 5.1, Volume II-Technical, Table 3 (Organization) lists Factor I as “Past Performance (Volume III).” The offeror assumes that Past Performance is not to be included within the page count limitations for Volume II Technical. Will the Government please confirm that Volume III Past Performance is outside of Volume II Technical page count? |
| Clarification |
| Past Performance is submitted under Volume III and will not be evaluated under Volume II. The Factor is identified for completeness and it is annotated to be in Volume III. No past performance information should be in Volume II. |
| 18. |
| Att.L7 pg. 5 |
| 9 |
| Per “SAOSS_CRM_from_Draft_RFP_with_responses”, the Government clarified in the answer to questions 86 and 88 that FACTS Sheet item P. is meant to refer to SMC as opposed to WR-ALC. Would the Government please provide an updated Attachment L7 with this change? |
| Clarification |
| Revised to read Space and Missile Systems Center (SMC) |
| 19. |
| Attachment 3 Page 7 |
| 7.2 |
| In 7.2 Security Violation the RFP states” The Contractor will receive zero Objective Performance Incentive Fee for any year in which a fully adjudicated security violation is attributed to one of their employees on this contract, in the event of a security violation in accordance with the PWS, para 6.1.1” |
1. If a contractor is not going to get incentive fee for any other incentive fee criteria for a security violation then a single violation could deter reporting of a violation, and if a violation is adjudicated within the beginning of an option year it could deter the contractor from controlling costs for the remainder of the year. Would the government consider changing the security violation penalty from not forfeiting all available incentive fee to only forfeiting the security portion of the incentive fee pool for that period?
| Adjustment of Contractor Incentive Fee calculation |
| This is a Security Services Effort and the professionals hired are expected to exhibit the highest level of security services. Any security incident must be reported and level of incident is determined by security oversight authorities. This is a critical area and if the successful offeror has a security violation, this is a major issue and the resultant action must be equivalent. |
20.
| Does the Government intend to update the RFP with an amendment to include answers to questions from draft and final solicitations? |
| Implementation of Q&A into RFP |
| Added to FBO announcement. |
| 21. |
| Sec L, Page 5 |
| L.3.2 Table 1 |
| Would the Government please confirm that offerors are to submit/provide Attachment_L11_-_SAOSS_Pricing_Template in soft copy only? |
| Clarification |
| Confirm this shall be in electronic version (see Section L Paragraph 7.1) |
| 22. |
| Sec L, Page 5 |
| L.3.2.2 |
| Section L.3.2.2 provides font size requirements but not a font type requirement. |
Please provide an updated Section L.3.2.2 to reflect the response to item #27 of the Draft RFP Q&As, which states that Times New Roman is the required font type.
| Implementation of Q&A into RFP |
| Para 3.2.2 has been revised and identifies Times New Roman as the correct font. |
| 23. |
| Section L Page 5-6 |
| L.3.2.2 |
| Section L.3.2.2 does not specify font type or size for tables and graphics. |
Please provide an updated Section L.3.2.2 to reflect the response to item #28 of the Draft RFP Q&As, which states that font type for tables and graphics is Times New Roman, and font size is no smaller than 8 point.
| Implementation of Q&A into RFP |
| Para 3.2.2 has been revised to allow 8 point font for tables/graphics and identifies Times New Roman as the correct font. |
| 24. |
| Section L Page 5 |
| L.3.2.1 |
| Glossaries are excluded from page limitations, but they are not included within the volume organization structure for each volume. |
Please confirm that we can include a glossary of abbreviations and acronyms in the front matter of each volume.
| Clarification |
| Concur – not page count limitation |
| 25. |
| Section L Page 5 |
| L.3.2.1 |
| Will the Government please clarify whether or not the List of Tables (required in the organization of Volume I [L.4.1]; Volume II [L.5.1]; and Volume III [L.6.1]) is counted against prescribed page limits? |
Please provide an updated Section L.3.2.1 to reflect the response to item #36 of the Draft RFP Q&As, which states that the List of Tables is excluded from page limitations.
| Implementation of Q&A into RFP |
| Concur – not page count limitation |
| 26. |
| Sec L, Page 6 |
| 3.2.6 |
| The instructions in this paragraph to “Use separate files to permit rapid location of all portions, including subfactors, exhibits, annexes, and attachments, if any” implies that the volumes are to be broken up into multiple parts (separate files) when saved to CD or DVD. |
Please provide an updated Section L.3.2.6 to reflect the response to item #41 of the Draft RFP Q&As, which states that this requirement has been removed.
| Implementation of Q&A into RFP |
| The requirement remains unchanged to assist in the Source Selection Process. |
| 27. |
| Section L Page 9 |
| 4.9.6 |
| Attachment 5 Volume I: Small Business Participation Commitment Document. Will the government please provide the Document, since it was not provided during the final RFP? |
| Missing Document |
| Attachment 5 Volume I: Small Business Participation Commitment Document has been uploaded to the FBO Posting. |
| 28. |
| Day 30 Staffing |
| Position 1102, 1303, 1304 |
| The IAT certification levels for these positions are reversed, calling for IAT level 2 and IAM level 3. Requirement in PWS is for IAT level 3 and IAM level 2. Will the Government please correct? |
| Typographical Correction |
| Requirement updated in 30-Day Staffing Matrix |