HADES RFP Q and A Amendment 0001 20 Aug 26.xlsx
XLSX spreadsheet 71 KB Posted
- Attached to
- HADES (Hybrid Architecture and Development for Experimental Systems) Request for Proposal Federal contract opportunity
- Solicitation number
- FA8809-26-R-B002
- Issued by
- Department of the Air Force
About this file
This file is a Questions and Answers (Q&A) document with government responses addressing clarifications to the HADES RFP released on August 20, 2026.
The Q&A covers administrative clarifications across multiple RFP sections including proposal organization, submission requirements, evaluation criteria, cost/pricing instructions, and technical specifications. Key clarifications include: resumes for key personnel are required but excluded from page limits; Microsoft Project files, CWBS submissions, and labor profile matrices are excluded from page counts; the Contractor Work Breakdown Structure should map to the Basic Services Level 1 in the IDIQ PWS; "common core services" refers to the Ground System Architecture; labor rates must be rounded to the nearest penny while other dollar amounts round to the nearest dollar; staffing matrices should be submitted separately in native Excel format; the 10% subcontractor threshold for full cost volume submission applies per Task Order rather than contract-wide; Small Business Participation Commitment Documents do not require a Government template; the time-phased person-loading graph consolidates subcontractors under 10% into the prime contractor's numbers; Past Performance narratives should reference Section M Table 5 (not Table 7, which does not exist); and the transition period runs 60 days (December 10, 2026 to February 9, 2027) with other Task Orders beginning February 10, 2027. Additional clarifications address ambiguities in PWS numbering, CLIN structure alignment between Section B and Appendix A, property management system requirements for the C-ICP function, small business goals including a 5% Small Disadvantaged Business congressional goal within the 25% overall requirement, and updates to reflect the transition from eSRS to SAM.gov Subcontracting Plan Reporting. The document also corrects numerous PWS paragraph numbering errors, clarifies that no separate Support Services Task Order exists, and confirms that Cost Plus Award Fee rates proposed in Appendix B will be used for pricing but actual costs will be invoiced during execution.
View the file
Other files for this federal contract opportunity
Show all 50
HADES (Hybrid Architecture and Development for Experimental Systems) Request for Proposal has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final RFP Questions
| Section | ||||
| - Document | Paragraph - | |||
| Clause | Table / Chart | |||
| (if App) | Paragraph Verbiage in Question | Question / Comment | Proposed Solution | Write Government response in this column |
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 4.3.1.1
2.2.1.3 "The Offeror shall propose key personnel and provide resumes for each proposed key personnel on the contract."
"all narrative text pages, all tables, charts, graphs, and figures (including those embedded in narrative), organizational charts, diagrams, and flowcharts, sample documents, templates, or examples, resumes (if included), title pages for sections or subsections, and pages with headers/footers only if they contain proposal content." Will the government confirm resumes are required. Resumes are required, and will not count against the page limit. Section L 4.3.1.1 and 2.2.1.3 have been updated to clarify.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 4.3.1.1
2.2.1.3 "The Offeror shall propose key personnel and provide resumes for each proposed key personnel on the contract."
"all narrative text pages, all tables, charts, graphs, and figures (including those embedded in narrative), organizational charts, diagrams, and flowcharts, sample documents, templates, or examples, resumes (if included), title pages for sections or subsections, and pages with headers/footers only if they contain proposal content." Can the government confirm resumes are excluded from page count? Confirm resumes are excluded from page count. Section L 4.3.1.1 and 2.2.1.3 have been updated to clarify.
| (U)_00._HADES_Section_L_20260731_v4.2.1.pdf | 4.1.1 | ||
| 4.3.1 | "Subfactor 1: Program Management Criteria" | ||
| "Subfactor 1.1, Program Management Criteria (Sec M 4.3.1)" | The 4.3.1 heading indicates "Subfactor 1.1"; however, Table 2 and most other references (including Section M.4.3.1)indicate "Subfactor 1". Can the government confirm heading L.4.3.1 should be "Subfactor 1"? | Confirm it is subfactor 1 and Section L has been updated. |
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 4.3.2 (U) Subfactor 2, Systems Engineering Criteria (Sec. M 4.3.2) "...the Offeror shall include a high-level notional development timeline and schedule utilizing Microsoft Project…" Can the government confirm that the MS Project file for the schedule be submitted as an attachment and excluded from page count? Confirm MS Project will not count against page limit and Section L 4.3.2 has been updated.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 4.3.2.2 (U) Hybrid Environment Expertise (Sec. M 4.3.2.2) The Offeror shall explain how its SE processes will support simultaneous execution of multiple Task Orders requiring software intensive systems, integration of mission-unique software with common core services, cybersecurity accreditation and assurance, and how such processes will be applied in both cloud and/or local implementations. Can the government define what the common core services are? The term "common core services" refers to the Ground System Architecture in the operating environment.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 4.3.1.1.2 (U) Labor Profile Matrices 4.3.1.1.2 (U) Labor Profile Matrices The Offeror shall provide a time-based summary of labor hours by Task Order for the first 12 months post-transition and a time-based summary of labor hours by position (or labor category) for the first 12 months post-transition.
The Offeror shall provide a breakout of labor hours associated with each position per month for the 12- months after transition period. Use a format similar to that in Tables 5 and 6 produced in MS Excel. Please confirm the Labor Profile Matrices are to be provided in MS Excel format only. If so, please confirm this is outside of page count. Submit in native excel format, and will not count against Volume II page limit. Section L updated to clarify.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 4.3.1.3 (U) Small Business (Sec. M. 4.3.1.3) Will the government provide the Small Business Participation Commitment Document as an attachment to fill out? The Government does not intend to require a specific template. Requirements for what should be included is in Section L 4.3.1.3.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 5.1.1 (U) Volume Organization (Volume III - Cost/Price) Can the government confirm "Section 4 – Discussion of Business Systems, Offeror Unique Approaches" should instead be provided in Volume V - Contract Documentation in accordance with Section 7.6 (U) Discussion of Business Systems and Offeror’s Unique Approach. Please update Table 8 accordingly. Section L, Table 8 has been updated to remove Section 4. Section 4 is now reserved.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 2.3.5 (U) Electronic Submission Requirements Can the Government please confirm the file size limitation for the upload submission to PIEE? The PIEE solicitation module allows individual file sizes up to 1.9GB, with no total file limit. i.e. individual files can be up to 1.9GB but there is no limit to the number of individual 1.9GB files that can be uploaded.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf L.5.4.4.2 item #7, L.5.4.4.3 item #9 For the Award Fee Table, identify the Offeror's proposed Award Fee percent for each Basic IDIQ CLIN identified in Column (A). The instructions for both Section L Appendix B in L.5.4.4.2 item #7, and Section L Appendix C in L.5.4.4.3 item #9 say to identify the Offeror's proposed Award Fee percent for each Basic IDIQ CLIN identified in Column (A). However, an Award Fee Table is not in either Appendix and Column (A) in both tables is the Labor Category. Is the intent of this instruction for Offerors to fill in the blank Award Fee of _%? The offeror will fill in the Award Fee % in Appendix B, Column E and Appendix C Column I.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 5.1.1 (U) Volume Organization
5.4.3 (U) Labor Hour Basis of Estimate Table 8: Attachment CP3 to Volume III: Prime/Subcontractor Labor Hour Basis of Estimate (BOE) by TO/CLIN/CWBS, Version 1: Pricing applied.
Version 2: Pricing redacted (This is the only content of Vol III that does not have cost/pricing).
5.4.3: The Offeror shall explain the labor hours proposed for the Prime in this section. Labor hours for the subcontracts shall be discussed in the subcontract section. Please confirm that separate BOEs for subcontractor labor are not required. The BOEs provided in accordance with 5.4.3 are inclusive of Prime and Subcontractor labor. Confirm that 5.4.3 is inclusive of prime and subcontractor hours.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 5.1.1 (U) Volume Organization Section 5.3.1 requires submission of Section L Appendix A, and 5.4.4 requires submission of Section L appendices B and C. Table 8 is silent as to where Section L Appendices A, B, and C should be provided in the Cost Volume. Please confirm that Appendices A, B, and C are to be provided as separate MS Word attachments to Section 5 of the Cost Volume. Correct; Section L, Appendix A, B, and C will be provides as separate MS Word attachments to Volume III.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 5.1.2 (U) Rounding All dollar amounts provided shall be rounded to the nearest dollar. Please confirm Prime/Subcontractors rates are to be rounded to 2 decimal points. Confirm that rates will be rounded to the nearest Penny. Section L 5.1.2 has been updated.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 5.2.1 (U) Time-Phased, Person-Loading Graph Bars: Layered/stacked format:
o Bottom bar: Prime contractor hours.
o Each bar above: Each non-prime (subcontractor, interdivisional, associate) with at least 10% of the proposed dollars for each TO. Please confirm that all Subcontractors with less than 10% of the proposed dollars for each TO can be consolidated in one bar so that the total labor hours for each TO will be displayed. Confirm that if Subcontractors account for less than 10% they can be consolidated.
(U)_00._HADES_Section_L_20260731_v4.2.1.pdf 5.1.1 (U) Volume Organization & 5.3 (U) Cost/Price Summaries Estimating Techniques and Methods & 5.3.1 (U) Offeror’s Total Proposed Price (TPP) Calculation Table 8: Section 2 – Cost/Price Summaries per Task Order per CLIN (Cost CLINs only) Section 5.3.1 specifically applies to Section L Appendix A, which includes the FFP CLIN for the Transition TO. Please edit Table 8 to remove "(Cost CLINs Only)" from the Section 2 title. Updated Table 8.
| (U)_00._HADES_Section_L_20260731_v4.2.1.pdf | 5.4.4 (U) Rates | Section L, Appendix B will be incorporated into the contract at award as Attachment 8 of the Basic IDIQ. | Please note Attachment 8 is Rights in Data, while Attachment 9 is Rates and Fees. Please update Section L 5.4.4 accordingly. | Section L has been updated to reference the correct attachment. | |||
| (U) 00. HADES_Section L_20260721_v4.1_Appendix-A | Appendix A | What is the period of performance for each of the Task Order CLINS listed in Column C of Appendix A? | Transition TO anticipated PoP is Dec 10 2026 - Feb 9 2027 and Anticipate the other TOs base period start of 10 Feb 2027 - 9 Feb 2028, with each option period starting 10 Feb and ending 9 Feb the following year. This is notional and specific PoP will be dictated by when the contract is awarded. | ||||
| (U) 00. HADES_Section L_20260721_v4.1_Appendix-A | Appendix A | Do the Task Order CLINS follow a one year base and 6 one year options per the notes in column A of Appendix A? | Yes, each TO will have a 1 year base, and it is expected all initial TOs will continue for the duration of the IDIQ, with the 6 options being exercised if continued performance is required. | ||||
| (U) 00. HADES_Section L_20260721_v4.1_Appendix-A | Appendix A Ground Support Task Order | Each TO has the labor PWS requirements in CLIN 0001 for year one. However in the Ground Support TO, CLIN 0001 (mission support) is present but there is an additional labor CLIN 0002 (PMO labor). |
| Which of the PWS elements should be priced against CLIN 0002 (PMO labor) within the Ground Support TO? | PMO labor should include those activities that are not "Mission Related" But apply across the IDIQ, such as the IDIQ program management team, key personnel at the IDIQ level, etc. | |||||||
| (U) 00. HADES_Section L_20260721_v4.1_Appendix-A.docx | 5.4.3 | Per Instructions: For each Task Order, the Offeror shall prepare a Basis of Estimate (BOE) by CWBS to Level 3 for each Cost-Reimbursable (CR) Travel CLIN, ODC CLIN, and each CPAF CLIN. Is the intent of this to estimate at the PWS 5.X.X level of the PWS. Please confirm this correct. | Confirm, this is correct with the understanding that when referencing 5.X.X level of the PWS this is intending to mean the basic IDIQ PWS, as each TO will have it's own PWS that follows the structure of the IDIQ PWS. With the TO PWS, all items within that PWS are expected to be completed and accounted for in the BOE. | |||||
| (U) 00. HADES_Section L_20260721_v4.1_Appendix-A.docx | 5.4.3 | Regarding estimation of CR Travel CLINs. Please define what 'undirected' travel would be that should be estimated. | Undirected' was not found in Section L 5.4.3. Question submitter will need to clarify what their question is. | |||||
| (U) 00. HADES_Section L_20260731_v4.2-final | L 4.3.2.2 (U) Hybrid Environment Expertise | The term "common core services" is not defined in the RFP. Will the Government define the "common core services" described in this section? | The term "common core services" refers to the Ground System Architecture in the operating environment. | |||||
| (U) 00. HADES_Section L_20260731_v4.2-final | L 4.3.1.1 Staffing/Labor Profile | Requirements state that "Offeror shall propose key personnel and provide resumes for each proposed key position". Given the restricted page count limitations, will the Government exclude resumes from page count? | Resumes will not count against page limit. Section L is updated to clarify. | |||||
| (U) 00. HADES_Section L_20260731_v4.2-final | L 2.2.1.1 Proposal Organization Table | |||||||
| L 4.3.1.1 Staffing/Labor Profile | Table 1 defines the page limitations of Volume II Subfactor 1 as 25 pages with Staffing / Labor profile (Section 4.3.1.1) requirements limited to 15 pages. The last sentence of Section 4.3.1.1 currently states "The narrative and matrices for this subfactor are limited to fifteen (15) pages." This wording implies that the entire subfactor 1 has a page limit of 15 pages, which would also include Sections 4.3.1.2 and 4.3.1.3. | |||||||
| Will the Government change the final sentence of 4.3.1.1 to read: "The narrative and matrices for the Section Staffing/Labor Profile are limited to fifteen (15) pages. | Section L has been updated to clearly detail the staffing/labor matrices are limited to 15 pages. | |||||||
| (U) 00. HADES_Section L_20260731_v4.2-final | 4.2 (U) Contractor Work Breakdown Structure (CWBS) | The document notes CWBS should "Maps to Government Level 1 PWS elements: Systems Engineering, Engineering, Development, Integration, Sustainment, Cybersecurity, and Program Management". But those are not the Level 1's in the IDIQ PWS. Level 1 in the current IDIQ PWS is Basic Services. May we use Basic Services as Level 1 and then breakdown to Level 2 and 3 in alignment with the PWS? | Yes, that is correct and is what is meant in section L. | |||||
| (U) 00. HADES_Section M_20260804_v4.2.1 | M 4.3.2.2 (U) Hybrid Environment Expertise | The Section M 4.3.2.2 criteria does not seem consistent with Section L 4.3.2.2. Section L requests an explanation of a Systems Engineering process across multiple TOs, trade-offs, and insertion of new technologies. Whereas Section M 4.3.2.2 evaluates experience and expertise of applying a systems engineering process. | ||||||
| Will the Government clarify the Section M 4.3.2.2 evaluation criteria? | Section L requested information supports section M evaluation. No change will be made. | |||||||
| (U) 00.HADES_Section L_20260731_v4.2-final | L.6.5.1.4 (U) Contract Data Matrix | Will the Government permit Offerors to submit an email address in place of a fax number for the Points of Contact listed in the Contract Data Matrix? | Yes, e-mail is acceptable and preferred to fax number. Fax number is removed and e-mail address is used instead in Section L 6.5.1.4. | |||||
| (U) Attachment 1 HADES_BASIC_IDIQ_PWS_20260724_v3.8.pdf | IDIQ PWS 5.1.1 Phase-In | IDIQ PWS 5.1.1 states transition will include a 60-day phase-in period. Does the period of performance for Transition phase-in run 60 days prior to the start of the other Task Orders (from 12/10/26-2/9/27)? | That is correct, but start and end date could move based on contract award. But transition will be 60 days. | |||||
| (U)_00._HADES_Section_L_20260721_v4.1_Appendix-A | Table | Materials (Basic CLIN 0003 CR | $7,135,600 | Can the government confirm plug number cost is intended to be $7,135,600? | Without the specific reference provided, it appears the question is about TO 4, Ground Support. TO Option Year 1 Materials. If that is the case, confirm that $7.135,600 is the correct amount. | |||
| (U)_00._HADES_Section_L_20260721_v4.1_Appendix-A | Table | Materials (Basic CLIN 4003) CR $8,400,000 | Can the government confirm plug number cost is intended to be $8,400,000? | Without the specific reference provided, it appears the question is about TO 4, Ground Support. TO Option Year 6 Materials. If that is the case, confirm that $8,400,000 is the correct amount. | ||||
| (U)_00._HADES_Section_L_20260721_v4.1_Appendix-A | The CLIN values do not align with the other options, can the government provide the detailed rationale behind these numbers? | The rationale for the increase is due to the Government's estimate of when a technology refresh will be required for the RSC. | ||||||
| (U)_00._HADES_Section_M_20260804_v4.2.1 | 7.4 (U) Small Business Subcontracting | |||||||
| Evaluated under M 4.3.1.3. A separate submission under this area is not required. The Small Business Subcontracting plan will be incorporated into a subsequent award. | Please confirm the Small Business Plan is required to be submitted with the proposal in the contract volume? | Confirm the small business plan will be submitted as part of the contract volume. L&M have been updated to clarify. | ||||||
| (U)+00.+HADES_Section+L_20260630 | L.5.1.1. Volume Organization | Will the government provide Section L instructions for Volume III Cost/Price Section 4 – Discussion of Business Systems, Offeror Unique Approaches? | Discussion of Business Systems, Offeror Unique Approaches was moved from cost/price to the contract documentation section (L 7.6) in the final RFP. Section 5 under Table 8, is now "Reserved" in section L. | |||||
| (U)+00.+HADES_Section+L_20260630 | L.5.1.2. Rounding | Section L.5.1.2 states that all dollar amounts provided shall be rounded to the nearest dollar. Does this include the labor rates detailed throughout Volume III Cost/Price or should all labor rates be rounded to the nearest penny? | Labor rates should be rounded to the nearest Penny. | |||||
| (U)+00.+HADES_Section+L_20260630 |
Attachment 08 - Rights in Data.pdf L 7.2.6.4 Technical Data Rights
| Attach 8 Rights in Data 3.1.1.3 Instructions | Section L states that the offeror shall complete the fill ins for Section J Attachment 8 – Rights in Data under Volume V Contract Documentation while the Attachment 8 Rights in Data states that Section J Attachment 8 should be submitted as part of Volume III Cost/Price. Which volume should the data rights attachment 8 be submitted in? | Submit section J, Attachment 8 as part of Volume V. Section J, Attachment 8 language has been updated to section V. | ||
| (U)+00.+HADES_Section+L_20260630 | ||||
| (U) 00. HADES_Section L_20260721_v4.1_Appendix-A | Section L 5.4.3 | Section L states that offerors should prepare a Basis of Estimate (BOE) by CWBS to Level 3 for each Cost-Reimbursable (CR) ODC CLIN and each CPAF CLIN. |
| Please confirm if offerors are required to submit BOEs for the pre-populated values for Travel in Appendix A? | Offerors are not required to submit a BOE for travel and materials, unless IAW Section L 5.3.2 "Section L, Appendix A includes filled in amounts for Travel and Materials. These are based on the Government’s estimate for technology refreshes, Government directed travel, and expected expenditures. If the Offeror has a proposed approach that would likely alter these numbers, the offeror should propose that methodology and clearly indicate where they have expected changes. " | |||||
| ...Section L Hades…._v4.2 final | Section 5.1.2 (U) Rounding | "All dollar amounts provided shall be rounded to the nearest dollar." | Are all amounts, including direct labor rates, fringe costs, overhead costs, G&A costs, COM costs, subcontractor's fee costs, and NM Gross Receipts Tax costs to be rounded to zero decimals, or are just bill rates and extended annual costs to be rounded? | Section L 5.1.2 has been updated. All dollar amounts provided shall be rounded to the nearest dollar for TPP and TEP items. Labor rates shall be rounded to the nearest penny. | ||
| 1) FA8809-26-R-B002 (08/05/26) 2) Section L | 1) I 2) 5.3.2, 5.4.4.2, 5.4.4.3 | 1) Section I contains 52.215-17 Waiver of Facilities Capital Cost of Money (Oct 1997), stating that FCCM is unallowable because the contractor did not include FCCM in their proposal. 2) Section L mentions cost of money (COM) in the referenced section/pages as cost element summary category that must be identified. | Question: Please confirm offeror may bid FCCOM consistent with their disclosed practices. | Correct, FCCOM may bid FCCOM consistent with their disclosed practices. | ||
| 1) FA8809-26-R-B002 (08/05/26) 2) Basic IDIQ PWS | 1) H 2) 3.3 | 1) Solicitation section H contains 52.244-2 Subcontracts has a fill in under (d) requiring the Contracting Officers' consent before placing subcontracts which are "Over $2m and/or TS/SCI access". 2) The Basic IDIQ PWS states that "Each Person requiring access to the space ground control systems to perform their work must obtain at least a Top-Secret clearance with Sensitive Compartmented Information eligibility". | Question: With the requirement in the Basic IDIQ PWS, this means essentially all subcontracts will require CO consent. Can the Government please confirm this is this does not apply to contractors that have an approved purchasing system? | Section H does not presently have any clauses. Section I contains 52.244-2. That is correct, consent to subcontract does not apply if the contactor has an approved purchasing system IAW 52.244-(c), with the exception of those contracts under 52.244-2(d). If there are subcontracts that are submitted as part of the proposal, they will be incorporated into the clause at award and considered to have Contracting Officer consent. 52.244-2 subcontracts for TOs and subcontracts that are awarded after the initial TOs will require written consent of the CO if they meet the criteria in section (d) of the clause. | ||
| 1) Section L 2) Basic IDIQ PWS | 1) 7.2.6.5 2) Appendix C | Associate Contractor Agreements. Section L 7.2.6.5 directs Offerors to include ACA's if applicable, or to include a statement that none are applicable in Volume V, Contracts. Basic IDIQ PWS Appendix C requires the contractor to enter into ACA's as needed, and cites the IDIQ level necessary contractor as a.i. solutions Inc. | Question: Can the Government please confirm that the ACA with a.i. solutions Inc does not need to be submitted with the proposal response, and can be completed upon award? | That is correct, only a draft has to be submitted with the proposal, and if the offeror is successful, the ACA will need to be finalized upon award. | ||
| Administrative | Solicitation SF33 page 78-DFARS 252.215-7993 | Section L includes DFARS 252.215-7993, Proposal Adequacy Checklist, in full text; however, the proposal organization and submission instructions do not clearly identify the completed Proposal Adequacy Checklist as a required proposal deliverable or specify where it should be submitted. Please confirm whether Offerors are required to complete and submit the Proposal Adequacy Checklist with their proposal. | Section L 7.2.5 has been updated to clarify that fill in clauses will be submitted as part of Volume V. | |||
| Attachment 1 | The 10 questions across Sections 1, 2 and 3 of the questionnaire include the instructions "Comments (required if E, M, or U)" | Requiring comments for only a portion of the ratings could introduce bias in the evaluation. Will the government consider either removing comments altogether or requiring them for all ratings? | The document has been reviewed, and will not be updated. It is expected that if performance was Exception, Marginal or unsatisfactory, there should be comments that support that. It is also anticipated that if performance was Very Good or Satisfactory, the evaluator that receives the questionnaire would still input supporting comments. | |||
| Attachment 1, Basic IDIQ PWS, v3.8 | 5.2.4 | 5.2.4 Security and Data Handling Management | The requirements under 5.2.4 are out of sequence and labeled as 5.2.6.1, 5.2.6.2, etc. | This has been corrected and updated in v.3.9. | ||
| Attachment 1, HADES Basic IDIQ PWS | 5.0, 5.2 | 5.0 Support Services states, "The Support Services TO will include the non-mission-specific support functions for overall contract management. The individual mission TOs will include mission-specific support functions." 5.2 states, (U) Support Services | ||||
| Intent: Support services are the functions necessary for overall contract management and are not necessarily mission specific. Non-mission-specific support service requirements will be specified in the Support Services TO PWS. Mission-specific support service requirements will be specified in each TO PWS. | The statements indicate that there is a "Support Services TO" and a "Support Services PWS" to cover overall IDIQ functions. Request the government provide the Support Services TO as part of the RFP to be a priced TO to be awarded with the IDIQ. If there is not going to be a separate Support Services TO to cover overall IDIQ program management, request the government provide guidance on how to include overall IDIQ program management support. | This should be priced as part of the PMO labor. No separate TO PWS exists for Support Services. This and will be updated in the Basic IDIQ PWS. | ||||
| Attachment 2_Ordering_Instructions .pdf | Ordering Instructions: paragraph (4) - page 2 of 3 | |||||
| Ordering Instructions paragraph (4): Costs will be proposed using | ||||||
| the burdened direct labor rates table and Award Fee identified in Section J Attachment 10 of the basic contract. | Please note Attachment 9 is Rates and Fees, while Attachment 10 is Small Business Participation. Please update the Ordering Instructions reference. | Ordering instructions has been updated. | ||||
| Attachment 2_Ordering_Instructions .pdf & (U)_00._HADES_Section_L_20260731_v4.2.1.pdf | Ordering Instructions: paragraph (4) - page 2 of 3 |
Section L 5.4.4 (U) Rates Ordering Instructions paragraph (4): Costs will be proposed using the burdened direct labor rates table and Award Fee identified in Section J Attachment 10 of the basic contract.
| Section L 5.4.4: The labor categories and corresponding CPAF rates proposed in Appendix B shall be used in pricing to include all Task Orders to be issued by the Government against the Basic IDIQ in this solicitation, and future Task Orders to be issued under the IDIQ. | Please note Attachment 9 is Rates and Fees, while Attachment 10 is Small Business Participation. Please confirm invoicing will be done on actual cost. | Ordering instruction has been updated to reference the correct attachment. | |||
| Award Fee Plan | Annex 2: Award Fee Evaluation Criteria | Recommend the Government update the Small Business criteria definition to align with FAR 52.219-9. Specifically, "the small business utilization for the evaluation period's total subcontracted value is…" | The language from the RFO states: The Offeror’s subcontracting plan shall include the following: |
(1) Separate goals, expressed in terms of total dollars subcontracted, and as a percentage of total planned subcontracting dollars, for the use of small business, VOSB, SDVOSB, HUBZone small business, SDB, and WOSB concerns as subcontractors. For individual subcontracting plans, and if required by the Contracting Officer, goals shall also be expressed in terms of percentage of total contract dollars, in addition to the goals expressed as a percentage of total subcontract dollars. The Offeror shall include all subcontracts that contribute to contract performance and may include a proportionate share of products and services that are normally allocated as indirect costs. This will be updated in the award fee plan.
| CDRLs | A008 | What is the acceptable Government compatible electronic format for reporting Physical Inventory? | MS products such as excel, word or Adobe PDF as well as through the PIEE GFP module. | |||
| CDRLs | A014 | What are the Logistics Performance Metrics to be reported? What is the acceptable electronic format for delivering Logistics Performance Metrics Reporting? | The report should cover such metrics as Hardware and Software status, and renewals, purchases, inventory processes, supply chain management, and other areas related to logistics management. | |||
| CDRLs | A020 | Interface Requirements Specifications - is this in relation to the inventory system used? | Define and record interface requirements between systems/subsystems to ensure successful data flow and communication. Please reference DI-IPSC-81434A for more information. | |||
| CDRLs | A036 | A036 CDRL requires contractor to convert inventory to NSN. Does this apply to CAP purchased by contractor or will this be based on the use of the MILSTRIP system where NSNs have been assigned to the parts? or both? | If the materials purchased have an NSN, then that NSN should be entered into ELMS. | |||
| Configuration Management | Section L 4.3.2.3; RSC Management SOP; Change Request Process Charter | For purposes of the Section L 4.3.2.3 Configuration Management response, should Offerors assume the Government change-governance model described in the Bidders' Library (including ERB/CCB/Pre-Execution Review/Configuration Audit Board and SZIG-led configuration control) as the baseline Government/mission-partner interface, or should Offerors propose their own interface model subject to post-award tailoring? | The bidder's library Governance model is included to provide a baseline Government mission-partner interface. However, this does not preclude the offeror from proposing their own interface model if it results in a better, or more efficient process IAW Section L 4.2.2.3. | |||
| Cost | Section B, CLIN Structure and Appendix A | The CLIN structure reflected in Section B and Section L, Appendix A appears inconsistent. For example, Section B identifies CLIN 0003 as Materials and CLIN 0004 as Travel, while Appendix A identifies CLIN 0002 as Materials, CLIN 0003 as Travel, and CLIN 0004 as ODCs. Please clarify which CLIN structure offerors shall use in preparing the Volume III Cost/Price proposal, including the required Cost Element Summaries, BOEs, and TPP/TEP calculations, and revise the applicable solicitation documents to provide a consistent CLIN structure. | The CLIN structure in the SF33 is correctly named. In Section L, Appendix A, Task Orders have CLIN 0002, but it references back to the IDIQ CLIN. I.E, Ground Control Task Order CLIN 0002 references Basic IDIQ CLIN 0003 which is materials. The Task Order CLINs may be numbered differently, but they reference back to the IDIQ CLIN structure for the appropriate CLINs. | |||
| COST | Reference: Section L 4.3.1.1.1, Staffing Matrices; Exhibit A, CDRL A001, Transition Plan – PMO Approach/Phase Out | Section L requires Offerors to provide a separate staffing matrix for each Task Order and a Total Staffing Matrix Rollup. Exhibit A, CDRL A001 further requires the PMO Approach to include a plan for charging program management functions—including the Program Manager, Contract Manager, and administrative actions—to individual Task Orders. Please clarify how Offerors shall depict IDIQ-level/shared PMO personnel and associated labor hours in the Section L staffing matrices. Specifically, should shared PMO personnel and hours be: (1) allocated proportionally among and included in each applicable Task Order staffing matrix based on the PMO effort charged to that Task Order; (2) depicted once within a designated Task Order staffing matrix, while the associated costs are allocated among applicable Task Orders in Volume III; or (3) depicted separately as IDIQ-level/shared PMO staffing in the Total Staffing Matrix Rollup and excluded from the individual Task Order staffing matrices? Please also confirm the required treatment of shared PMO headcount and labor hours across the staffing matrices, labor profiles, BOEs, and Volume III Cost/Price submission to ensure consistency without duplicating personnel or labor hours. | PMO labor should be depicted/captured in the Ground Support Task Order, consistent with Section L, Appendix A. | |||
| Cost / Price | Section L 5.4.4.1 | For Offerors without an FPRA/FPRR, Section L 5.4.4.1 requires historical indirect-rate support. Please confirm whether Government-approved Provisional Billing Rates may be submitted as supporting evidence and whether they may substitute for any portion of the requested historical indirect-rate data. | Confirm that Government-Approved Billing rates may be submitted as supporting evidence. Yes, they may be used to substantiate historical indirect-rate data. | |||
| Cost / Price / Subcontractors | Section L 5.2.1; 5.4.8; 7.3.4 | Section L now defines the 10% threshold on a per-Task-Order basis. For non-prime entities meeting that threshold, please confirm whether detailed Cost/Price data must be submitted directly by the non-prime to the Government, included within the Prime's Volume III, or both, and identify any required cross-reference/labeling convention. | Per 5.2.1 a separate submission by the non-prime to the government is not requested. Per 5.4.8 1. | For Non-Prime companies where the proposed total price of the company is at least 10% of the total proposed price for each Task Order, the non-prime company shall be directed by the prime to submit a Cost/Price Volume directly to the Government. The same pricing instructions apply to these non-prime companies. | ||
| 2. | The Prime Offeror shall submit to the Government its written analysis of all non-prime proposals. Evaluation of subcontract proposals shall include direct labor hours and costs/prices that will flow up through the prime to the Government. The Prime Offeror is responsible for showing clear traceability from its subcontractor / vendor / partner proposed amounts to the prime's evaluation and to the CWBS structure. | |||||
| Cost Volume | Section L.5.2.1 | Section L §5.2.1 requires the Offeror to provide a time-phased, person-loading bar graph “for each Cost Plus Award Fee (CPAF) CLIN.” Please clarify whether Offerors are required to provide a separate time-phased person-loading graph for each CPAF CLIN within each Task Order, or whether Offerors may provide a consolidated graph for each Task Order that reflects the applicable CPAF labor effort. | Section L 5.2.1 has been updated to make it clear that this will need to be provided for each Task Order. | |||
| Cost Volume | Section L.5.4.3 Labor Hour Basis of Estimate | Section L requires that, for each Task Order, the Offeror prepare a Basis of Estimate (BOE) by CWBS to Level 3 for each Cost-Reimbursable (CR) Travel CLIN, ODC CLIN, and each CPAF CLIN. Section L, Appendix A, however, provides Government-established values for certain Travel and Materials CLINs. Please confirm that, where an Offeror uses the Government-provided values for Travel and Materials without adjustment, the Offeror is not required to develop or submit a BOE supporting those Government-provided amounts. If a BOE is required, please clarify the level of supporting rationale and detail expected for Government-provided values. | That is correct, if the offeror is using the government provided estimates for travel and Materials, a separate BOE is not required. However, IAW section L 5.3.2 Section L, Appendix A includes filled in amounts for Travel and Materials. These are based on the Government’s estimate for technology refreshes, Government directed travel, and expected expenditures. If the Offeror has a proposed approach that would likely alter these numbers, the offeror should propose that methodology and clearly indicate where they have expected changes. | |||
| Cost Volume Organization | Section L.5.1.1 Cost Volume Organization | Section L, Table 8 identifies multiple Volume III components that appear to require overlapping Cost/Price information at the Task Order and CLIN level, including Section 2 – Cost/Price Summaries per Task Order per CLIN; Section 5 – Cost Attachments per Task Order per CLIN; and Attachment CP1 – Working Excel Files. Please clarify the intended purpose, required content, and level of detail for each of these three components, including what information is expected to be unique to each. | The Government will use this data to make a determination IAW Section M 5.4 | |||
| Cost Volume Organization | Section L.5.1.1 Cost Volume Organization | Section L, Table 8 identifies multiple Volume III components that appear to require overlapping Cost/Price information at the Task Order and CLIN level, including Section 2 – Cost/Price Summaries per Task Order per CLIN; Section 5 – Cost Attachments per Task Order per CLIN; and Attachment CP1 – Working Excel Files. Please confirm whether information presented in one component may be incorporated by reference in another where the required cost data are duplicative. | Recommend if information is duplicative, to still include in both areas. This will minimize cross referencing. | |||
| Cost Volume Organization | Section L.5.1.1 Cost Volume Organization | Section L, Table 8 requires Offerors to identify a filename for each listed Volume III Cost/Price item. Please clarify whether the Government intends for each item identified in Table 8 to be submitted as a separate and distinct electronic file, or whether Offerors may consolidate multiple Table 8 items into logically organized files by file type (e.g., PDF and Microsoft Excel), provided each required item is clearly identified and readily traceable within the submission. If separate files are required, please confirm that a distinct electronic file is required for each applicable Table 8 item. | Yes, offerors may consolidate multiple Table 8 items into logically organized files by file type (e.g., PDF and Microsoft Excel), provided each required item is clearly identified and readily traceable within the submission. | |||
| Cost Volume Organization | Section L.5.1.1 Cost Volume Organization | Section L §5.1.1, Table 8 identifies five required sections and three attachments for Volume III – Cost/Price. Sections 1 through 3 appear to correspond to the detailed instructions provided in Sections L §§5.2 through 5.4. However, Section L does not appear to provide specific proposal preparation instructions identifying the required content for Section 4 – Discussion of Business Systems, Offeror Unique Approaches, or Section 5 – Cost Attachments per Task Order per CLIN. Please provide the required content, level of detail, and organization for Volume III Sections 4 and 5. For Section 4, please also clarify how the required content differs from or supplements the Business Systems information required under Section L §7.6 in Volume V. For Section 5, please identify the specific cost attachments required for each Task Order/CLIN and clarify how those attachments differ from Attachments CP1 through CP3 identified separately in Table 8. | Section L table 8 has been updated to remove Section 4. Section 5 is CP1 - CP3. Section 5 is not distinct from those attachments. Consider Section 5 to be the umbrella over CP1-CP3. | |||
| Fixed Ground Support PWS | Section 5.3.3.14 | Applicable IDIQ PWS Sections | Will the Government please confirm that, within the PWS-to-IDIQ mapping tables, only those IDIQ PWS sections identified with an "X" are applicable to the corresponding Task Order PWS section for estimating purposes? If confirmed, will the Government further confirm that for Fixed Ground Support PWS Section 5.3.3.X, any referenced IDIQ PWS sections whose corresponding boxes are blank (i.e., do not contain an "X") are not applicable to that Task Order PWS section and therefore should not be included in offerors' estimates? | Confirmed. | ||
| Future GS Dev PWS | 3.1 Architecture Design and Requirements Development | The Future Ground System PWS references a "Government-provided Future Functional Ground Architecture reference design and System Concept Document (SYSCON)." Are these available in the Bidder's Library for proposal development? If not, is the intent that the requested Architecture in Section L 4.3.2.1 be referred to as a proposed Reference Architecture for the Future Ground System | Yes, the intent that the requested Architecture in Section L 4.3.2.1 be referred to as a proposed Reference Architecture for the Future Ground System | |||
| Ground Control PWS | Para 5.2.7.12 | 5.2.7.12 The contractor shall be responsible for risk identification and mitigation associated with supporting Ground Control operations and systems. | Can the government confirm 5.2.7.12? It appears to be a mistake copy and paste from 5.2.6.4 "The contractor shall be responsible for risk identification and mitigation associated with supporting Ground Control operations and systems." | This has been corrected and updated in v.3.9. | ||
| Ground Control PWS | Para 5.2.4 | 5.2.4 - Information Management | PWS 5.2.4 is titled Information Management, but then seems to call out IDIQ PWS 5.2.5 Security and Data Handling Management requirements. Information Management requirements appear to have been skipped. Please correct or explain the apparent disconnect between the TO and the referenced IDIQ requirements. | This has been corrected and updated in v.3.9. | ||
| Ground Control PWS | Para 9.1 | 9.1 (U) HADES IDIQ Requirements | The subordinate requirements numbered 5.3.2.11 and 5.3.2.12 should be 5.3.1.11 and 5.3.1.12 respectively. | This has been corrected and updated in v.3.9. | ||
| Ground Control PWS | Document Title | Under "Document Properties," the Title shows "JAGUAR PWS" instead of "GROUND CONTROL PWS." Although this is a trivial issue, it does create confusion when both the Ground Control and Jaguar PWS's are open at the same time. | This has been corrected and updated in v.3.9. | |||
| Ground Control PWS | 5.2.4 | 5.2.4 is aligned to "Information Management" in the GC PWS; however, it should actually be aligned to "Security and Data Handling Management" | This has been corrected and updated in v.3.9. | |||
| Ground Control PWS | Document Title | Under "Document Properties," the Title shows "JAGUAR PWS" instead of "GROUND SUPPORT PWS." Although this is a trivial issue, it does create confusion when both the Ground Control and Jaguar PWS's are open at the same time. | This has been corrected and updated in v.3.9. | |||
| Ground Support PWS | Revision History | Revision History | The Revision History says Ground Control, but should be for Ground Support. | This has been corrected and updated in v.3.9. | ||
| HADES IDIQ CDRLs | A026 | Please provide Page 2 of block 16. | Corrected and updated in v.2. | |||
| HADES IDIQ CDRLs | A029, A032, A034 | Recommend updating Block 12 to "15 days after Request." | Corrected and updated in v.2. | |||
| HADES IDIQ CDRLs | A036 | Please update block 12 to be during the POP for the relevant task orders. Recommend first submission be 120 days after TO award. | CDRL A036 will be updated to clarify correct date/timeline for submission. | |||
| IDIQ PWS | Para 5.2.3.3 | 5.2.3.3 The contractor shall maintain current and accurate operational procedures, technical data, test plans, |
test reports, training materials, and other documents required to conduct activities assigned under
| this contract utilizing a Government-approved configuration management tool and process. | Will the government provide a list of approved configuration management tools? Are these tools contractor provided? | The KanBan Board Planner is one of the current CM Tools currently in use and is a Microsoft application. Jira and Confluence are also CM Tools currently being utilized. | |||||
| IDIQ PWS | Para 5.2.4 | 5.2.4 (U) Security and Data Handling Management | The subordinate paragraphs so 5.2.4 are misnumbered as 5.2.6.x. Recommend these be corrected to avoid duplicate paragraph numbering for different requirements. | This has been corrected and updated in v.3.9. | |||
| IDIQ PWS | 5.2.9 | Should offerors propose integrated, holistic HADES solutions (software, processes, database, configuration management) or does the Government anticipate requiring independent or Task Order-dedicated solutions? | Propose a holistic approach for the initial TOs (software, processes, database, configuration management) . | ||||
| IDIQ PWS | 5.2.7.9 | The Government uses Security+ as an example of appropriate certifications for personnel. Would the Government provide additional examples of the kinds of certifications that they seek, as this will impact how offerors build and price staffing plans? | As stated in 5.2.7.8 "The contractor shall ensure all contractor personnel accessing DoD information systems obtain and maintain required information assurance certifications in accordance with DoD 8140 (formerly DoD 8570) or successor directives." | ||||
| IDIQ PWS | 5.2.4 | The subsections under 5.2.4 are misnumbered. They are currently 5.2.6.1 - 5.2.6.15. | This has been corrected and updated in v.3.9. | ||||
| IDIQ PWS and Section L_L20260731_v4.2-final | PWS 5.2 (page 4/22) | In the IDIQ PWS there is a reference to a "Support Services TO," which Does not exist. There is a statement that "Non-mission-specific support service requirements will be specified in the Support Services TO PWS. Mission-specific support service requirements will be specified in each TO PWS." However, all the 5.2 Support Services requirements (including Program Mgmt, Cost Mgmt, etc.) are included in all 3 TO PWS's. For the purpose of estimating LOE and pricing the Task orders, please confirm that labor to perform all of 5.2 effort in support of all task orders can be estimated and priced as a whole under the Ground Support TO only to simplify evaluation and pricing? | Corrected to "Ground Support TO" and updated in v3.9. | ||||
| Jaguar PWS | Para 10.1 | 10.1 (U) HADES IDIQ Requirements. Subsection 5.4.4 - Network Infrastructure Support | Some of the subordinate requirements for 5.4.4 - Network Infrastructure Support appear to be misnumbered. E.g., it appears that 5.4.3.3 should be 5.4.4.3. Recommend these references be corrected so they correspond to the correct IDIQ requirements. | This has been corrected and updated in v.3.9. | |||
| Jaguar PWS | Various | The PWS identifies several additional requirements not covered in the scope of the IDIQ PWS. These include 8.0 Ground Terminal Support Services and 9.0 Operational Support, and 12.4 HW Packaging and Marking. Please indicate under what IDIQ PWS element these tasks should be included for CWBS purposes. If these are truly additional requirements, recommend they be added to the IDIQ PWS for inclusion in the CWBS | These requirements are additional requirements only required for the Jaguar PWS and will not be incorporated into the IDIQ PWS. | ||||
| Jaguar PWS | 12.2 and 12.3 | This requirement appears redundant to 12.3 and should be included under 12.3 as specific tailoring for IDIQ PWS 5.7 Special Studies. | This has been corrected and updated in v.3.9. | ||||
| L | 2.2.1.1 Table 1 | It is unclear if the 15 pages for Staffing/Labor profile is included in the 25 page total for Subfactor 1, or if it is in addition to the 25 pages of the other two items listed as "Incl.Above" limit, making the total 40 pages. As the most important factor, a 40 page limit would appear to be appropriate. | Update the page limit for Subfactor 1 to 40 and indicate the following for Staffing/Labor Profile page limit "15 Max, Incl.Above" | Section L 4.3.1 has been updated to exclude Resumes, and staffing matrices from the page limit. | |||
| L | 4.3.1.1.1 | Given the 15 page maximum for the tables and narrative that describes the proposed staffing/labor profile, what is the Government's expectations for the table content? Currently offerors have two options: Option 1: Content of Tables 3 & 4 provides a unique row for each 3rd level CWBS/Labor Cat/Company combination. | |||||
| Option 2: Content of Tables 3 & 4 provides a unique row for each GWBS (Level 1)/Labor Cat/Company combination with applicable CWBS elements at level 2, 3 and greater included under that GWBS (Level 1) item listed in the CWBS (Level 2, 3+) cell. | We recommend the Government confirm that Option 2 is the correct approach, as it results in the smaller table. Otherwise for large teams (with multiple subcontractors and multiple labor categories), including levels/seniority (e.g, Systems Eng 1, 2, 3, 4, 5, 6) would quickly expand the size of tables and leave offerors no room for providing narrative content to support the data in the tables. | Section L 4.3.1 has been updated to exclude Resumes, and staffing matrices from the page limit. | |||||
| L | 5.4.4, Appendix B | Per 5.4.4, "The Offeror shall complete Section L, Appendix B and Appendix C with the Offeror's proposed labor categories and the corresponding CPAF rates." There is no instruction for subcontractors to do the same. | Would the Government please confirm that the Prime shall submit a single B table which covers the Prime and all subcontractors? | Section L 5.4.4 has been updated to include subcontractors. | |||
| L | 5.4.8 (1) | Non-Prime companies with at least 10% of the total proposed TO price are required to submit a full cost volume. | Would the Government please confirm that the requirement to provide a full Volume III cost volume only applies to cost-type subcontractors (and not to T&M subcontractors)? | The Government interprets the question to mean Travel and materials subcontractors will not be required to submit a full cost volume. If that is the case, then yes, subcontractors that will primarily supply materials, and not under CPAF CLINs do not need to submit a full cost volume. | |||
| L | 6.3.1.3, 6.5.1.2 | Different definitions of "major subcontractor" are used throughout the solicitation. | Will the Government use the same definition of Major subcontractor described in the Past Performance 6.3.1.3 and 6.5.1.2 (defined as performing ≥10% of the total proposed contract value OR performing work the Prime considers critical to successful performance) for all references, including references for non-primes in Section L 5.2.1, 5.4.8, and 7.3.4 which currently reference (at least 10% of the total proposed price for each Task Order. | The definition used throughout the document all retain the 10% or more language. The use within the L section 5, is appropriate as it is 10% of those Task Orders. | |||
| L | Attachment 1, Section TOC / Section 5.5 | The Table of Contents for Attachment 1 (Performance Questionnaire) lists Section 5.5 "Innovation and Process Improvement" as a numbered question under Section 2: Systems Engineering; however, no Section 5.5 question appears in the body of the questionnaire. The TOC entry for Section 5.5 creates an expectation that evaluators will be asked to rate contractor innovation and process improvement performance. The absence of the actual question text leaves evaluators and offerors uncertain whether this dimension will be evaluated, and if so, what rating scale and comment guidance applies. | Please confirm that the Section 5.5 (Innovation and Process Improvement) in the TOC should not be included in Attachment 1 PP Questionnaire. | Confirm there is no section 5.5. in Section L, Attachment 1. Attachment has been updated. |