04_02_A309_SP_800-128 _Security_Impact_Analysis_Template.pdf

Special Publication PDF 29 KB Posted

Attached to
SUSTAINMENT AND MODIFICATION OF OPTICAL AND RADAR SENSORS (SMORS)
Solicitation number
FA8707-12-R-0010
Issued by

About this file

04_02_A309 SP 800-128 Security Impact Analysis Template

View the file

Other versions and copies of NIST SP 800-128

Who attaches NIST SP 800-128

Other files

File Type Posted
Synopses_of_Contract_Award.docx DOCX document
20170125_Submission_of_Classified_Data.pdf PDF
20170125_DD_Form_254_Contract_Security_Classification_Specification.pdf PDF
CONFORMED_FA8723-17-R-0001_20170120.doc DOC document
20170120_Conformed_SF33_&_NDA_POCs.pdf PDF
CONFORMED_FA8723-17-R-0001_20170119.PDF PDF
20170119_Conformed_SF33_and_SB.pdf PDF
20170118_Cross_Reference_Matrix_Use.pdf PDF
BL_updates_12Jan17.docx DOCX document
Amendment_0003_sig_page.pdf PDF
SMORS_Amendment_0003_13Jan2017_Updated_Files.zip ZIP file
FA8723-17-R-0001-0003.pdf PDF
20170113_SMORS_AMEND_0003.pdf PDF
SMORS_2016Dec_RFP_Industry_CRM_v01_12Jan2017.pdf PDF
SMORS_2016Dec_RFP_Industry_CRM_v00.pdf PDF
20161229_SMORS_Pre-Proposal_Conference_Q&A.pdf PDF
15Dec16_preproposal_attend.pdf PDF
BL_Update_29Dec16.pdf PDF
SMORS_Pre-Proposal_Conference_-_Sample_Fee_Calculation_v002.pdf PDF
SMORS_Pre-Proposal_Conference_Slides_v00rev004.pptx PPTX presentation
FA8723-17-R-0001-0002.pdf PDF
SMORS_Amendment_0002_Updated_Files.zip ZIP file
FA8723-17-R-0001_0001.pdf PDF
00_11_SMORS_IDIQ_ATCH09_Sec_L_v08rev000_AMD01.pdf PDF
20161214_NDA_POC.pdf PDF
SMORS_Pre-Proposal_Conference_Slides_v00rev003.pptx PPTX presentation
SMORS_Pre-Proposal_Conference_-_Sample_Fee_Calculation.pdf PDF
20161214PRE-PROPOSAL_CONFERENCE_AND_INCENTIVE_FEE_HANDOUT.pdf PDF
F0014_ExhA_RFP.zip ZIP file
F0014_ExhC_RFP.zip ZIP file
F0013_ExhA_RFP.zip ZIP file
F0014_ExhB_RFP.zip ZIP file
F0013_ExhB_RFP.zip ZIP file
F0012_ExhB_RFP.zip ZIP file
F0011_ExhA_RFP.zip ZIP file
F0012_ExhA_RFP.zip ZIP file
F0011_ExhB_RFP.zip ZIP file
F0009_ExhA_RFP.zip ZIP file
F0010_ExhA_RFP.zip ZIP file
F0010_ExhB_RFP.zip ZIP file
F0009_ExhC_RFP.zip ZIP file
F0009_ExhB_RFP.zip ZIP file
F0008_ExhA_RFP.zip ZIP file
F0006_ExhA_RFP.zip ZIP file
F0006_ExhB_RFP.zip ZIP file
F0007_ExhB_RFP.zip ZIP file
F0007_ExhA_RFP.zip ZIP file
F0004_ExhA_RFP.zip ZIP file
F0003_ExhA_RFP.zip ZIP file
F0003_ExhB_RFP.zip ZIP file
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Special Publication 800-128 Guide for Security-Focused Configuration Management of Information Systems

APPENDIX I I-1

APPENDIX I

SAMPLE SECURITY IMPACT ANALYSIS TEMPLATE

The following is a sample template for a Security Impact Analysis that can be used within a SecCM program. Organizations are encouraged to adapt it to suit their needs.

The [insert relevant parties, e.g., Change Control Board, Information system Owner (ISO), Information System Security Officer (ISSO),system administrators, security assessors] complete Tables 1-6, which will be used to review the change and determine requirements.

Table 1: Initiative/Release Background [TEMPLATE NOTE: Pre-filled information in Table 1 is for illustrative purposes only and should be replaced with information applicable to individual organizations] Initiative/Release Name Project Type [Examples only]:

-New Development: [insert description] -Enhancement: [insert description] -Maintenance: [insert description] [Insert project types and descriptions as applicable]

System Changes Provide an overview of the changes.

Baseline Changes Provide description of the new baseline.

Security Risks Provide any risks or impacts on the system.

Planned Deployment Initiation Date Planned Deployment Completion Date System(s) Impacted by change Current Security Categorization of Impacted System(s) [Insert initiative/release background info required by the organization as applicable]

Special Publication 800-128 Guide for Security-Focused Configuration Management of Information Systems

APPENDIX I I-2

Table 2: Initiative/Release Description and Potential Security Issues [TEMPLATE NOTE: Pre-filled information in Table 2 is for illustrative purposes only and should be replaced with information applicable to individual organizations] What are the business requirements driving the change?

Please provide a description of the proposed change(s), including ALL additions, deletions, and modifications.

Is the Technical Lead and/or Project Lead aware of any potential security-related issues or challenges associated with this change? If so, briefly describe them or provide and attachment describing them.

Table 3: Change Type Worksheet Please review the list of Change Types below. In the second column, mark each applicable change type with an “X”. Provide a brief explanation of why applicable change types are selected in the third column. The change types are not intended to be mutually exclusive, so multiple change types may be selected for a single initiative/release. If none of the change types are applicable, please mark “Other change” and provide a description of the change in the third column.

[TEMPLATE NOTE: Change type provided in Table 3 are for illustrative purposes only and should be replaced with changes types applicable to individual organizations]

Change Type Applicable?

(Mark X if Applicable)

Explanation (If Applicable)

New network device(s) (e.g., router, switch, firewall, VPN gateway)

New server(s) New workstation(s) (desktops or laptops)

Other new HW Decommissioning of existing HW

New virtual server New OS

Upgrade of existing OS New COTS application

Upgrade or patch of COTS application New custom application

Upgrade or bug fix for existing custom application

New DBMS (e.g., Microsoft SQL Server or Oracle)

Upgrade of existing DBMS (e.g., Oracle

Special Publication 800-128 Guide for Security-Focused Configuration Management of Information Systems

APPENDIX I I-3

Change Type Applicable?

(Mark X if Applicable)

Explanation (If Applicable)

9i to 10g) Addition of new DB instance

Modification of an existing DB instance (e.g., changes to a table)

New or upgraded Middleware application or service

Modifications to ports, protocols, and services used or provided by the system

Changes intended to address security requirements or improve/modify the security of the system (e.g., cryptographic modules, security patch, authentication, authorization, role changes)

New information type processed, stored, or transmitted on the system

Interface change (addition/removed) Change of location

Other change

Table 4: Device Impact Worksheet [TEMPLATE NOTE: Column headings in Table 4 are for illustrative purposes only and should be replaced with information relevant/applicable to individual organizations] System Name

Device Name

IP

Address

Manufacturer Model

Serial No.

Asset/ Component Property ID

OS Software Description

Table 5: Testing Worksheet [TEMPLATE NOTE: Pre-filled information in Table 5 is for illustrative purposes only and should be replaced with information applicable to individual organizations] Please describe the tests that were conducted against the change?

Please provide a description of the test results for each change (or provide reference to another document with test results).

Special Publication 800-128 Guide for Security-Focused Configuration Management of Information Systems

APPENDIX I I-4

Table 6: Analysis Worksheet [TEMPLATE NOTE: Pre-filled information in Table 6 is for illustrative purposes only and should be replaced with information applicable to individual organizations] Analysis, Recommendations, and Requirements

[Reviewed by: Name (Title)]

Signature

[Insert relevant role] [Date]

Signature

[Insert relevant role] [Date]

Signature

[Insert relevant role] [Date]

Special Publication 800-128 Guide for Security-Focused Configuration Management of Information Systems

APPENDIX I I-5

ATTACHMENT 1

SECURITY IMPACT WORKSHEET

1. AC: Will change(s) to system effect how the system limits: (i) information system access to authorized users, processes acting on behalf of authorized users or devices (including other information systems); and (ii) the types of transactions and functions that authorized users are permitted to exercise.

If so, describe.

2. AT: Will change(s) affect required system training to ensure that personnel are adequately trained to carry out their assigned information security-related duties and responsibilities?

If so, describe.

3. AU: Will change(s) affect how system audit requirements to (i) create, protect, and retain information system audit records to the extent needed to enable the monitoring, analysis, investigation, and reporting of unlawful, unauthorized, or inappropriate information system activity; and (ii) ensure that the actions of individual information system users can be uniquely traced to those users so they can be held accountable for their actions.

If so, describe.

4. CM: Will change(s) to the system impact the (i) baseline configuration and inventory of organizational information systems; (ii) establishment and enforcement of security configuration settings; and (iii) ability to monitor and control changes to the baseline configurations and to the constituent components of the systems (including hardware, software, firmware, and documentation) throughout the respective system development life cycle.

If so, describe.

5. IA: Will change(s) to the system impact how it (i) identifies users, processes acting on behalf of users, or devices; and (ii) authenticates (or verifies) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

If so, describe.

6. MA: Will change(s) to the system impact how (i) periodic and timely maintenance is performed; and (ii) provide effective controls on the tools, techniques, mechanisms, and personnel used to conduct information system maintenance.

If so, describe.

7. MP: Will change(s) to the system impact how (i) information contained in the systems in printed form or on digital media is protected; (ii) access to information in printed form or on digital media removed from the systems is limited to authorized users; and (iii) how digital media is sanitized or destroyed before disposal or release for reuse.

If so, describe.

8. PE: Will change(s) to the system/system environment change how (i) physical access to information systems, equipment, and the respective operating environments is limited

Special Publication 800-128 Guide for Security-Focused Configuration Management of Information Systems

APPENDIX I I-6

to authorized individuals; (ii) the physical plant and support infrastructure for information systems is protected; (iii) supporting utilities for information systems is provided; (iv) and (v) appropriate environmental controls in facilities are provided.

If so, describe.

9. SC: Will change(s) to the system effect how: (i) communications (i.e., information transmitted or received by organizational information systems) are monitored, controlled, and protected at the external boundaries and key internal boundaries of the information systems; and (ii) architectural designs, software development techniques, and systems engineering principles that promote effective information security are implemented.

If so, describe.

10. SI: Will change(s) to the system effect how (i) system flaws are identified, reported, and corrected in a timely manner; (ii) malicious code protection is employed; (iii) system events are monitored and detected; (iv) the correct operation of security functions is verified; and (v) information is checked for accuracy, completeness, validity, and authenticity.

If so, describe.

File details come from the government source that posted it. Updated .