SMORS_Pre-Proposal_Conference_-_Sample_Fee_Calculation.pdf

PDF 101 KB Posted

Attached to
SUSTAINMENT AND MODIFICATION OF OPTICAL AND RADAR SENSORS (SMORS)
Solicitation number
FA8707-12-R-0010
Issued by

About this file

IFP Sample Calculation

View the file

Other files

File Type Posted
Synopses_of_Contract_Award.docx DOCX document
20170125_Submission_of_Classified_Data.pdf PDF
20170125_DD_Form_254_Contract_Security_Classification_Specification.pdf PDF
CONFORMED_FA8723-17-R-0001_20170120.doc DOC document
20170120_Conformed_SF33_&_NDA_POCs.pdf PDF
CONFORMED_FA8723-17-R-0001_20170119.PDF PDF
20170119_Conformed_SF33_and_SB.pdf PDF
20170118_Cross_Reference_Matrix_Use.pdf PDF
BL_updates_12Jan17.docx DOCX document
Amendment_0003_sig_page.pdf PDF
SMORS_Amendment_0003_13Jan2017_Updated_Files.zip ZIP file
FA8723-17-R-0001-0003.pdf PDF
20170113_SMORS_AMEND_0003.pdf PDF
SMORS_2016Dec_RFP_Industry_CRM_v01_12Jan2017.pdf PDF
SMORS_2016Dec_RFP_Industry_CRM_v00.pdf PDF
20161229_SMORS_Pre-Proposal_Conference_Q&A.pdf PDF
15Dec16_preproposal_attend.pdf PDF
BL_Update_29Dec16.pdf PDF
SMORS_Pre-Proposal_Conference_-_Sample_Fee_Calculation_v002.pdf PDF
SMORS_Pre-Proposal_Conference_Slides_v00rev004.pptx PPTX presentation
FA8723-17-R-0001-0002.pdf PDF
SMORS_Amendment_0002_Updated_Files.zip ZIP file
FA8723-17-R-0001_0001.pdf PDF
00_11_SMORS_IDIQ_ATCH09_Sec_L_v08rev000_AMD01.pdf PDF
20161214_NDA_POC.pdf PDF
SMORS_Pre-Proposal_Conference_Slides_v00rev003.pptx PPTX presentation
20161214PRE-PROPOSAL_CONFERENCE_AND_INCENTIVE_FEE_HANDOUT.pdf PDF
F0014_ExhA_RFP.zip ZIP file
F0014_ExhC_RFP.zip ZIP file
F0013_ExhA_RFP.zip ZIP file
F0014_ExhB_RFP.zip ZIP file
F0013_ExhB_RFP.zip ZIP file
F0012_ExhB_RFP.zip ZIP file
F0011_ExhA_RFP.zip ZIP file
F0012_ExhA_RFP.zip ZIP file
F0011_ExhB_RFP.zip ZIP file
F0009_ExhA_RFP.zip ZIP file
F0010_ExhA_RFP.zip ZIP file
F0010_ExhB_RFP.zip ZIP file
F0009_ExhC_RFP.zip ZIP file
F0009_ExhB_RFP.zip ZIP file
F0008_ExhA_RFP.zip ZIP file
F0006_ExhA_RFP.zip ZIP file
F0006_ExhB_RFP.zip ZIP file
F0007_ExhB_RFP.zip ZIP file
F0007_ExhA_RFP.zip ZIP file
F0004_ExhA_RFP.zip ZIP file
F0003_ExhA_RFP.zip ZIP file
F0003_ExhB_RFP.zip ZIP file
F0003_ExhC_RFP.zip ZIP file
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUSTAINMENT & MODIFICATION OF RADAR SENSORS (SMORS)

PRE-PROPOSAL CONFERENCE HANDOUT

SAMPLE FEE CALCULATION

The following scenario provides an example of the how the Government will apply criteria to calculate the cost, performance and schedule incentive fees earned by the contractor. This example is based on the Ballistic Missile Early Warning System (BMEWS) and PAVE Phased Array Warning System (PAWS) (BPP) High-Altitude Electromagnetic Pulse (HEMP) Hardness Maintenance (HM) and Hardness Surveillance (HS)(HM/HS) Task Order (TO) [FA8723-17-F-0004 (F0004)]. This example will show the caluclations of the various elements to show the overall resulting incentive fee for the Base Period of HM/HS (CLINs 0001, 9001 and 9002). The incentive fees are based on the contractor’s Target Cost. The values used throughout the scenario are for illustration purposes only and do not reflect any estimates, budgets or other data associated with this TO.

Sample Data

CLIN 0001

Target Cost (TC): $5,000,000 (proposed amount)

Target Fee (cost) (1.20%): $60,000 $5,000,000 x 1.2%

Maximum Fee (cost) (2.00%): $100,000 $5,000,000 x 2.0%

Minimum Fee (cost) (0.40%): $20,000 $5,000,000 x 0.4%

Underrun share ratio: 75/25

Overrun share ratio: 75/25

CLIN 9001

Performance Incentive Fee Pool (5.00%): $250,000 $5,000,000 x 5.0%

CLIN 9002

Schedule Incentive Fee Pool (3.00%): $150,000 $5,000,000 x 3.0%

F0004 Incentive Fee Plan Performance Incentive Fee Criteria

The contractor will earn the allocated portion of the incentive based upon the number of discrepancies contained per TM/TO in the delivered TM/TOs. The average number of TM/TO discrepancies will be calculated by dividing the total number of TM/TO discrepancies within the contractor’s control assigned at each In-Process Review (IPR) (30-40% completion and 70-80% completion) and TO Certification by the total number of IPRs and TO Certifications during each evaluation period.

Performance incentive will be based on the average number of TM/TO discrepancies according to:

100% of Available PIF (Max) = Average # of discrepancies ≤ 1

84% of Available PIF = Average # of discrepancies = 2

72% of Available PIF = Average # of discrepancies = 3

60% of Available PIF = Average # of discrepancies = 4

40% of Available PIF = Average # of discrepancies = 5

20% of Available PIF (Min) = Average # of discrepancies ≥ 6

F0004 Incentive Fee Plan Schedule Incentive Fee Criteria

Schedule is measured when the Contractor, as a result of accomplishing depot maintenance activities, delivers to the Government technical baseline data that has been created and/or updated. The contractor will earn the allocated portion of the schedule incentive according to the measures below:

100% of Available SIF (Max) = Completes technical baseline data ≥ 10 business days ahead

60% of Available SIF = Zero (0) days behind ≥ completes technical baseline data < 10 business days ahead

20% of Available SIF (Min) = Completes technical baseline data ≥ one (1) business day behind

Sample Contract Results and Incentive Fee Calculations

After the end of the period of performance of the Base Period, the Governemnt determined the contractor delivered all the required Technical Manuals and Technical Orders. The Government determined the average number of TM/TO discrepancies to be two (2) discrepancies, and delivered seven (7) business days ahead of the contractually agreed to schedule. The Total Allowable Cost was $4,851,502.

Sample Cost Incentive Fee Calculation for CLIN 0001

𝑇𝑇𝑇𝑇 ≡ 𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇 𝑇𝑇𝐶𝐶𝐶𝐶𝑇𝑇 𝑖𝑖𝑖𝑖𝑇𝑇𝑖𝑖𝑇𝑇𝑖𝑖𝑖𝑖𝑖𝑖𝑇𝑇𝑖𝑖 𝑖𝑖𝑖𝑖 𝑇𝑇𝐶𝐶𝐶𝐶𝐶𝐶

𝑇𝑇𝑇𝑇 ≡ 𝑇𝑇𝑇𝑇𝑇𝑇 𝑇𝑇𝐶𝐶𝐶𝐶𝐶𝐶𝑎𝑎𝑖𝑖𝑇𝑇𝑇𝑇𝑇𝑇𝑖𝑖 𝑤𝑤𝑖𝑖𝑇𝑇ℎ 𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇 𝑇𝑇𝐶𝐶𝐶𝐶𝑇𝑇 (1.2%)

𝑇𝑇𝐶𝐶𝐶𝐶 ≡ 𝑇𝑇𝐶𝐶𝑖𝑖𝑇𝑇𝑇𝑇𝑇𝑇𝑎𝑎𝑇𝑇𝐶𝐶𝑇𝑇′𝐶𝐶 𝐶𝐶ℎ𝑇𝑇𝑇𝑇𝑇𝑇 𝐶𝐶𝑇𝑇𝑇𝑇𝑇𝑇 (25%)

𝑇𝑇𝑇𝑇𝑇𝑇 ≡ 𝑇𝑇𝐶𝐶𝑇𝑇𝑇𝑇𝑇𝑇 𝑇𝑇𝑇𝑇𝑇𝑇𝐶𝐶𝑤𝑤𝑇𝑇𝐴𝐴𝑇𝑇𝑇𝑇 𝑇𝑇𝐶𝐶𝐶𝐶𝑇𝑇

𝑇𝑇𝑇𝑇 ≡ 𝑇𝑇𝑎𝑎𝑇𝑇𝐴𝐴𝑇𝑇𝑇𝑇 𝑇𝑇𝑇𝑇𝑇𝑇 𝑇𝑇𝐶𝐶𝐶𝐶𝐶𝐶𝑎𝑎𝑖𝑖𝑇𝑇𝑇𝑇𝑇𝑇𝑖𝑖 𝑤𝑤𝑖𝑖𝑇𝑇ℎ 𝑇𝑇𝐶𝐶𝑇𝑇𝑇𝑇𝑇𝑇 𝑇𝑇𝑇𝑇𝑇𝑇𝐶𝐶𝑤𝑤𝑇𝑇𝐴𝐴𝑇𝑇𝑇𝑇 𝑇𝑇𝐶𝐶𝐶𝐶𝑇𝑇

𝑇𝑇𝑇𝑇 = 𝑇𝑇𝑇𝑇 + [𝑇𝑇𝐶𝐶𝐶𝐶 × (𝑇𝑇𝑇𝑇 − 𝑇𝑇𝑇𝑇𝑇𝑇)]

Cost Incentive Fee Earned: $97,125 $60,000 + [25% * ($5,000,000 – $4,851,502)]

Sample Performance Incentive Fee Calculation for CLIN 9001

Performance Incentive Fee Earned: $210,000 $250,000 x 84%

Sample Schedule Incentive Fee Calculation for CLIN 9002

Schedule Incentive Fee Earned: $90,000 $150,000 x 60%

Sample Total Incentive Fee Calculation (Cost, Performance & Schedule))

Total Incentive Fee Earned: $397,125 $97,125 + $210,000 + $90,000

Total Fee Percentage: 8.19% $397,125 / $4,851,502