Sec_L _Attachment_2_-_CRH_Cross_Reference_Matrix_(CRM)_12OCT2012.pdf
PDF 673 KB Posted
- Attached to
- Combat Rescue Helicopter (CRH) Federal contract opportunity
- Solicitation number
- FA8629-12-R-2400
About this file
Sec L Attachment 2- CRH Cross Reference Matrix
View the file
Other files for this federal contract opportunity
Show all 50
Combat Rescue Helicopter (CRH) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8629-12-R-2400
Section L, Attachment 2
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
SOW Para. Number Statement of Work (SOW)
03 OCT 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION XX XX
1.1 PROGRAM STRUCTURE AND OBJECTIVES 1.1 Basis of Contract Award XX XX
2.0 GENERAL INSTRUCTIONS XX XX
2.1 XX XX XX XX
2.2 XX XX XX XX
2.3 XX XX XX XX
2.4 XX XX XX XX
2.5 XX XX XX XX
2.6 General Information XX XX XX XX
2.6.1 Point of Contact XX XX XX XX
2.6.2 Debriefings XX XX XX XX
2.6.3 Discrepancies XX XX XX XX
2.6.4 Electronic Reference Documents XX XX XX XX
2.6.5 Organization/Number of Copies/Page Limits XX XX XX XX
2.6.6 Page Limitations XX XX XX XX
2.7 Classified Information XX XX XX XX
2.7.1 Disposition of Classified Material Not Received
Under a Specific Contract
XX XX XX XX
2.7.2 Directions for Classifying Documents XX XX XX XX
2.8 Cross Referencing XX XX XX XX
2.8.1 Cross Referencing Matrix (CRM) XX XX XX XX
2.8.2 Cross Referencing Between Volumes XX XX XX XX
2.9 Indexing XX XX XX XX
2.10 Glossary of Abbreviations and Acronyms XX XX XX XX
2.11 Page Size and Format XX XX XX XX
2.11.1 Page Size XX XX XX XX
2.11.2 Tables, Charts, Graphs & Figures XX XX XX XX
2.12 Binding and Labeling XX XX XX XX
2.13 Electronic Offers XX XX XX XX
2.14 Proposal Submission XX XX XX XX
3.0 VOLUME I – EXECUTIVE SUMMARY VOLUME XX XX
3.1 Narrative Summary XX XX XX XX
3.2 Table of Contents XX XX XX XX
3.3 Cross Reference Matrix (CRM) XX XX XX XX
4.0 VOLUME II – TECHNICAL VOLUME 2.3 Factor 1: Technical XX XX
4.1 Technical Volume XX XX XX XX
4.2 Format and Specific Content XX XX XX XX
4.2.1 Technical XX XX XX XX
4.2.1.1 Volume Organization XX XX XX XX
4.2.1.2 Reserved XX XX XX XX
4.2.1.3 Air Vehicle Description Data 2.3 Factor 1: Technical XX XX
4.3 Subfactor 1.1: Systems Integration 2.3.3 Subfactor 1.1 Systems Integration
4.3.1 Reserved XX XX XX XX
4.3.2 RF Capabilities Required 2.3.3 Radio Frequency (RF) Capabilities Required XX XX
4.3.3 EO/IR Detection and Countermeasures Required 2.3.3 EO/IR Detection and Countermeasures Required XX XX
4.3.4 LASER Detection 2.3.3 LASER Detection XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
SOW Para. Number Statement of Work (SOW)
03 OCT 2012
4.3.5 Ballistic Threat Vulnerability Reduction and
Force Protection
2.3.3 Ballistic Threat Vulnerability Reduction and Force
Protection
XX XX
4.3.6 Net-Ready 2.3.3 Net-Ready XX XX
4.3.7 Tactical Datalink and Integrated Broadcast
Service Requirements
2.3.3 Tactical Datalink and Integrated Broadcast Service
Requirements
XX XX
4.3.8 Tactical Communications Requirements 2.3.3 Tactical Communications Requirements XX XX
4.3.9 Mock-ups and System Integration Labs (SILs) 2.3.3 Mock-ups and System Integration Labs 1.4.3.1 through 1.4.3.4 System Integration Lab Development, SIL Maintenance, Avionics Integration Support Facilities, ASIF Maintenance
4.4 Subfactor 1.2: Aircraft Mission Capability 2.3.4 Subfactor 1.2: Aircraft Mission Capability
4.4.1 Combat Radius 2.3.4 Combat Radius XX XX
4.4.2 Hover 2.3.4 Hover XX XX
4.4.3 Payload 2.3.4 Payload XX XX
4.4.4 Mission Performance 2.3.4 Mission Performance XX XX
4.4.5 Human Systems Integration 2.3.4 Human Systems Integration XX XX
4.5 Subfactor 1.3 - Systems Engineering / Program
Management (SE/PM)
2.3.5 Subfactor 1.3: Systems Engineering / Program
Management (SE/PM)
4.5.1 Schedule: Integrated Master Plan (IMP) /
Integrated Master Schedule
2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.1 IMP 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.1.1 Key Program Events 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.1.2 Significant Accomplishments 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.1.3 Entrance/Exit Criteria 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.1.4 Process Narratives 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2 IMS 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.1 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.2 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.3 IMS Content 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.4 IMS Format 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5 Chapter 1 - IMS 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
SOW Para. Number Statement of Work (SOW)
03 OCT 2012
4.5.1.2.5.1 Electronic / Hard Copy 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5.2 Critical Path 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5.3 Predecessors/Successors 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5.4 LOE tasks 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5.5 Durations 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5.6 Reserved 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5.7 Tasks 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5.8 Technical Subfactor in MS Project Text2 Field 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5.9 Reserved 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5.10 Excessive Lag Time 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.5.11 Logical Relationships 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.6 Chapter 2 - Schedule Rationale 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.6.1 Narratives 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.6.1.1 Assumptions & Data used for relationships 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.6.1.2 Reserved XX XX XX XX
4.5.1.2.6.1.3 Multiple critical paths 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.6.1.4 Offeror's / Government work calendar 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.1.2.6.1.5 Schedule Health Assessment (SHA) 2.3.5 Schedule 1.3.1, 1.2.2.7 Program Management, Technical Reviews
4.5.2 Reserved XX XX XX XX
4.5.3 Contract Work Breakdown Structure (CWBS) 2.3.5 Contract Work Breakdown Structure (CWBS) 1.3.6.1 Contract Work Breakdown Structure (CWBS)
4.5.4 Airworthiness (AW) 2.3.5 Airworthiness (AW) 1.2.1.2, 1.2.2.2 Airworthiness Specification, Airworthiness Plan
4.5.5 Live Fire Test and Evaluation (LFT&E) 2.3.5 Live Fire Test & Evaluation (LFT&E) 1.4.1.3.1
1.4.1.3.2
Live Fire Test & Evaluation (LFT&E)
LFT&E Reports and Data
4.5.6 Manufacturing and Quality 2.3.5 Manufacturing and Quality 1.3.5 Manufacturing and Quality
4.5.6 Quality 2.3.5 Quality 1.3.5.5 Quality Assurance Program
4.5.6 Production Capacity 2.3.5 Production Capacity 1.3.5 Manufacturing and Quality
4.5.6 Manufacturing Readiness Assessment (MRA) 2.3.5 Manufacturing Readiness Assessment (MRA) 1.3.5.3 Manufacturing Readiness Assessment (MRA)
4.5.7 Reserved XX XX XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
SOW Para. Number Statement of Work (SOW)
03 OCT 2012
4.5.8 Small Business 2.3.5 Small Business Participation Plan 1.3.1.1 Small Business Participation Plan
4.5.8.1 Reserved XX XX XX XX
4.5.8.2 Small Business Participation Plan 2.3.5 Small Business Participation Plan 1.3.1.1 Small Business Participation Plan
4.5.9 Reliability 2.3.5 Reliability 1.2.11, 1.2.11.1 Reliability and Maintainability (R&M) Program
Reliability and Maintainability Program Plan (RMPP)
4.5.9.1 Reliability 2.3.5 Reliability 1.2.11, 1.2.11.1 Reliability and Maintainability (R&M) Program
Reliability and Maintainability Program Plan (RMPP)
4.5.9.2 Reliability and Maintainability (R&M)
Engineering Program
2.3.5 Reliability 1.2.11, 1.2.11.1 Reliability and Maintainability (R&M) Program
Reliability and Maintainability Program Plan (RMPP)
4.5.9.2.1 Reliability Models 2.3.5 Reliability 1.2.11, 1.2.11.1, 1.2.11.3 Reliability and Maintainability (R&M) Program
Reliability and Maintainability Program Plan (RMPP)
System Reliabiilty Math Models, Allocations and
Predictions
4.5.9.2.2 System Engineering Integration 2.3.5 Reliability 1.2.11, 1.2.11.1 Reliability and Maintainability (R&M) Program
Reliability and Maintainability Program Plan (RMPP)
4.5.9.2.3 Life-Cycle Loads on Subsystems, Assemblies, Subassemblies, LRUs, and Components
2.3.5 Reliability 1.2.11, 1.2.11.1 Reliability and Maintainability (R&M) Program
Reliability and Maintainability Program Plan (RMPP)
4.5.9.2.4 Reliability 2.3.5 Reliability 1.2.11, 1.2.11.1 Reliability and Maintainability (R&M) Program
Reliability and Maintainability Program Plan (RMPP)
4.5.9.2.5 Reliability 2.3.5 Reliability 1.2.11, 1.2.11.1 Reliability and Maintainability (R&M) Program
Reliability and Maintainability Program Plan (RMPP)
4.5.9.2.6 Reliability 2.3.5 Reliability 1.2.11, 1.2.11.1 Reliability and Maintainability (R&M) Program
Reliability and Maintainability Program Plan (RMPP)
4.6 Subfactor 1.4: Training System 2.3.6 Subfactor 1.4: Training System 1.5 CRH Training System
4.6.1 Reserved XX XX XX XX
4.6.2 Training Devices Development & Delivery 2.3.6 Aircrew Training Devices (ATD) & Maintenance
Training Devices (MTD)
Development and Delivery
SOW Annex D Projected CRH Air Vehicle Beddown
4.6.3 Aircrew & Maintenance Courseware 2.3.6 Aircrew & Maintenance Courseware Development 1.5.2.2
1.5.2.2.1
Aircrew & Maintenance Courseware Development
Courseware Requirements
4.6.4 Type 1 Training 2.3.6 Type 1 Training 1.5.2.1 Type 1 Training
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
SOW Para. Number Statement of Work (SOW)
03 OCT 2012
4.6.5 ATD & MTD Concurrency with air vehicle to
meet ATD/MTD beddown
2.3.6 Training System Configuration Management /
Concurrency
1.2.15.4
SOW Annex D
Training System Configuration Management / Concurrency
Projected CRH Air Vehicle Beddown
4.6.6 Distributed Mission Operations (DMO) 2.3.6 DMO for WST & OFT 1.5.2.3 WST/OFT Capability for Distributed Mission Operations
(DMO)
4.6.7 Preservation of fidelity of primary crew
members
2.3.6 Preservation of fidelity of primary crew members XX XX
4.7 Subfactor 1.5: Product Support 2.3.7 Subfactor 1.5: Product Support
4.7.1 Maintainability 2.3.7 Maintainability 1.2.11.2 Maintainability Program Plan (RPP)
4.7.1.1 Maintainability 2.3.7 Maintainability 1.2.11.2 Maintainability Program Plan (RPP)
4.7.2 Logistics Support 2.3.7 Logistics Support 1.9.5.1 Integrated Logistics Support (ILS) Process
4.7.2.1 Logistics Support Strategy during POS & ISS 2.3.7 Logistics Support 1.9.5.1 Integrated Logistics Support (ILS) Process
4.7.2.2 Initial Spares, Readiness Spares Package (RSP), SE Package, SE Mobility Package
2.3.7 Logistics Support 1.9.5.3.1.4
1.9.5.3.1.4.1
AV Spares, Readiness Spares Packages (RSP) and SE/TMDE
Parts List
Spares and SE
4.7.2.3 Management of Spares during ISS transition
from C-ICP to the government
2.3.7 Logistics Support 1.9.5.3.1 Interim Supply Support (ISS)
4.7.3 Technical Manuals 2.3.7 Technical Manuals 1.6.1.1.1 Technical Data / Technical Orders
4.7.3.1 Technical Manuals 2.3.7 Technical Manuals 1.6.1.1.1 Technical Data / Technical Orders
4.7.3.2 Technical Manuals 2.3.7 Technical Manuals 1.6.1.1.1 Technical Data / Technical Orders
4.7.3.3 Technical Manuals 2.3.7 Technical Manuals 1.6.1.1.1 Technical Data / Technical Orders
4.7.3.4 Technical Manuals 2.3.7 Technical Manuals 1.6.1.1.1 Technical Data / Technical Orders
4.7.3.5 Technical Manuals 2.3.7 Technical Manuals 1.6.1.1.1 Technical Data / Technical Orders
4.7.3.6 Technical Manuals 2.3.7 Technical Manuals 1.6.1.1.1 Technical Data / Technical Orders
4.7.4 Data Management 2.3.7 Data Management /Rights 1.6 Data
4.7.4.1 Data Rights 2.3.7 Data Management /Rights 1.6 Data
4.7.4.1.1 Pre-Award Identification and Assertion 2.3.7 Data Management /Rights 1.6 Data
4.7.4.1.1.1 Noncommercial Technologies 2.3.7 Data Management /Rights 1.6 Data
4.7.4.1.1.2 Commercial Technologies 2.3.7 Data Management /Rights 1.6 Data
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
SOW Para. Number Statement of Work (SOW)
03 OCT 2012
4.7.4.1.1.3 Reserved 2.3.7 Data Management /Rights 1.6 Data
4.7.4.1.1.4 2.3.7 Data Management /Rights 1.6 Data
4.7.4.1.1.5 2.3.7 Data Management /Rights 1.6 Data
4.7.4.1.2 Reserved XX XX XX XX
4.7.4.1.3 Commercial Software License Terms 2.3.7 Data Management /Rights 1.6 Data
4.8 Reserved 2.3.8 Reserved XX XX
5.0 Volume III: Cost/Price Volume 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1 General Instructions 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.1 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.2 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.3 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.4 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.5 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.6 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.7 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.8 Phasing of Funding Requirements 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.8.1 EMD Phasing 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.8.2 Production Phasing (Procurement) 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.1.9 Reserved XX XX XX XX
5.1.10 Quantities 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.2 Total Evaluated Price (TEP) 2.4.1 Total Evaluated Price (TEP) XX XX
5.2.1 Total Proposed Price (TPP) 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.2.1.1 Overrun to EMD Ceiling Price 2.4 Factor 2: Cost/Price Evaluation Procedures XX XX
5.2.1.2 VIQ Matrix for Aircraft 2.4.1.1.1 Aircraft VIQ Matrix (Section J, Attachment 7) XX XX
5.2.1.3 VIQ Pricing Narrative XX XX XX XX
5.2.1.4 Interim Supply Support (ISS) CLINs 2.4.1.1.2 Interim Supply Support (ISS) CLINs (to include ISS-
IOT&E) 1.9.5.3.1 Interim Supply Support
5.2.1.5 Live Fire Assets CLINs 2.4.1.1.5 Live Fire Test Assets CLINs 1.4.1.3.1 Live Fire Test & Evaluation (LFT&E)
5.2.1.6 Readiness Spares Packages (RSP) and SE
Mobility Packages
2.4.1.1.6 Readiness Spares Packages (RSP) and SE Mobility
Packages
1.9.5.3.1.4 AV Spares, Readiness Spares Packages (RSP) and SE/TMDE
Parts List
Spares and SE
5.2.2 Fuel Adjustment 2.4.1.2 Fuel Costs Adjustment to TEP XX XX
5.2.3 ST/TE Adjustment 1.3
2.4.1.3
Competitive Advantage from Use Special Tooling/Test
Equipment
Special Tooling/Test Equipment (ST/TE) Adjustment to
TEP
XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
SOW Para. Number Statement of Work (SOW)
03 OCT 2012
5.2.4 Goal Adjustment 2.3.1
2.4.1.4
Technical Compliance Rating
Goal Credit Adjustment to TEP
XX XX
6 Volume IV - Contract 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1 Model Contract/Representations and
Certifications
5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.1 Section A - Solicitation/Contract Form 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.2 Section B - Supplies or Services and Costs/Prices 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.3 Section C - Description/Specs/Work Statement 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.4 Section D - Packaging and Marking 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.5 Section E - Inspection and Acceptance 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.6 Section F - Deliveries or Performance 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.7 Section G - Contract Administrative Data 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.8 Section H - Special Contract Requirements 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.9 Section I - Contract Clauses 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10 Section J – List of Attachments 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.1 Exhibits 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.2 Attachments 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.2.1 Attachments 1 through 3 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.2.2 Attachment 4, 5, 11, 12, 13, 18, 22, 23, 24, 25, 26, 27, 28, 29, 30, and 31
5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.2.3 Attachment 6 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.2.4 Attachment 7 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.2.5 Attachment 8 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.2.6 Attachments 10, 14, 15, 16, 17, and 21 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.2.7 Attachment 19 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.2.8 Attachment 20 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.10.2.9 Attachment 32 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.1.11 Section K - Representations, Certifications, and
other Statements of Offerors
5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.2 CEO Certification 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.3 Other Information Required 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.3.1 DD Form 2345 - Military Critical Technical Data
Agreement
5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
6.3.2 Government Offices 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
SOW Para. Number Statement of Work (SOW)
03 OCT 2012
6.3.3 Company/Division Address, Identifying Codes, and Applicable Designations
5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
XX XX
7 Volume V - Past Performance 2.5 Factor 3: Past Performance Evaluation Procedures
7.1 General Instructions 2.5 Factor 3: Past Performance Evaluation Procedures XX XX
7.1.1 Content of Past Performance Volume 2.5 Factor 3: Past Performance Evaluation Procedures XX XX
7.1.1.1 Table of Contents 2.5 Factor 3: Past Performance Evaluation Procedures XX XX
7.1.1.2 Summary Page 2.5 Factor 3: Past Performance Evaluation Procedures XX XX
7.1.1.3 Past Performance Information Tool 2.5 Factor 3: Past Performance Evaluation Procedures XX XX
7.1.1.3.1 2.5 Factor 3: Past Performance Evaluation Procedures XX XX
7.1.1.4 Past Performance Questionnaire and Tracking
Record
2.5 Factor 3: Past Performance Evaluation Procedures XX XX
7.1.1.5 Consent Letters / Client Authorization Letter 2.5 Factor 3: Past Performance Evaluation Procedures XX XX
7.1.1.6 Organization Structure Change History 2.5 Factor 3: Past Performance Evaluation Procedures XX XX
7.1.1.7 Small Business Utilization 2.3.5 Small Business Participation Plan 1.3.1.1 Small Business Participation Plan
7.1.1.7.1 2.3.5 Small Business Participation Plan 1.3.1.1 Small Business Participation Plan
7.1.1.7.2 2.3.5 Small Business Participation Plan 1.3.1.1 Small Business Participation Plan
7.1.2 Relevancy and Recency of Past Performance
Information
2.5 Factor 3: Past Performance Evaluation Procedures XX XX
7.1.3 Determination of Responsibility 2.5 Factor 3: Past Performance Evaluation Procedures XX XX
8 List of Attachments XX XX XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION
1.1 PROGRAM STRUCTURE AND OBJECTIVES 1.1 Basis of Contract Award
2.0 GENERAL INSTRUCTIONS
2.1 XX XX
2.2 XX XX
2.3 XX XX
2.4 XX XX
2.5 XX XX
2.6 General Information XX XX
2.6.1 Point of Contact XX XX
2.6.2 Debriefings XX XX
2.6.3 Discrepancies XX XX
2.6.4 Electronic Reference Documents XX XX
2.6.5 Organization/Number of Copies/Page Limits XX XX
2.6.6 Page Limitations XX XX
2.7 Classified Information XX XX
2.7.1 Disposition of Classified Material Not Received
Under a Specific Contract
XX XX
2.7.2 Directions for Classifying Documents XX XX
2.8 Cross Referencing XX XX
2.8.1 Cross Referencing Matrix (CRM) XX XX
2.8.2 Cross Referencing Between Volumes XX XX
2.9 Indexing XX XX
2.10 Glossary of Abbreviations and Acronyms XX XX
2.11 Page Size and Format XX XX
2.11.1 Page Size XX XX
2.11.2 Tables, Charts, Graphs & Figures XX XX
2.12 Binding and Labeling XX XX
2.13 Electronic Offers XX XX
2.14 Proposal Submission XX XX
3.0 VOLUME I – EXECUTIVE SUMMARY VOLUME
3.1 Narrative Summary XX XX
3.2 Table of Contents XX XX
3.3 Cross Reference Matrix (CRM) XX XX
4.0 VOLUME II – TECHNICAL VOLUME 2.3 Factor 1: Technical
4.1 Technical Volume XX XX
4.2 Format and Specific Content XX XX
4.2.1 Technical XX XX
4.2.1.1 Volume Organization XX XX
4.2.1.2 Reserved XX XX
4.2.1.3 Air Vehicle Description Data 2.3 Factor 1: Technical
4.3 Subfactor 1.1: Systems Integration 2.3.3 Subfactor 1.1 Systems Integration
4.3.1 Reserved XX XX
4.3.2 RF Capabilities Required 2.3.3 Radio Frequency (RF) Capabilities Required
4.3.3 EO/IR Detection and Countermeasures Required 2.3.3 EO/IR Detection and Countermeasures Required
4.3.4 LASER Detection 2.3.3 LASER Detection
System Spec
Para. Number
System Specification
04 SEP 2012
Training System Spec
Para. Number
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
SS 3.2.1.3.6.1.2, 3.2.1.3.6.1.2.1,
3.2.1.3.6.2.2, Appendix D, Appendix F
Radio Frequency Countermeasures requirements XX
SS 3.2.1.3.6.1.3, 3.2.1.3.6.1.3.1,
3.2.1.3.6.2.3 through - 3.2.1.3.6.2.4.1.2, 3.2.1.4.1.2, 3.2.1.4.4.1.2.1, Appendix D, Appendix F
EO/IR Countermeasures requirements
XX
SS 3.2.1.3.6.1.4, 3.2.1.3.6.1.4.1,
Appendix D, Appendix F
LASER Detection XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 4.3.5 Ballistic Threat Vulnerability Reduction and
Force Protection
2.3.3 Ballistic Threat Vulnerability Reduction and Force
Protection
4.3.6 Net-Ready 2.3.3 Net-Ready
4.3.7 Tactical Datalink and Integrated Broadcast
Service Requirements
2.3.3 Tactical Datalink and Integrated Broadcast Service
Requirements
4.3.8 Tactical Communications Requirements 2.3.3 Tactical Communications Requirements
4.3.9 Mock-ups and System Integration Labs (SILs) 2.3.3 Mock-ups and System Integration Labs
4.4 Subfactor 1.2: Aircraft Mission Capability 2.3.4 Subfactor 1.2: Aircraft Mission Capability
4.4.1 Combat Radius 2.3.4 Combat Radius
4.4.2 Hover 2.3.4 Hover
4.4.3 Payload 2.3.4 Payload
4.4.4 Mission Performance 2.3.4 Mission Performance
4.4.5 Human Systems Integration 2.3.4 Human Systems Integration
4.5 Subfactor 1.3 - Systems Engineering / Program
Management (SE/PM)
2.3.5 Subfactor 1.3: Systems Engineering / Program
Management (SE/PM)
4.5.1 Schedule: Integrated Master Plan (IMP) /
Integrated Master Schedule
2.3.5 Schedule
4.5.1.1 IMP 2.3.5 Schedule
4.5.1.1.1 Key Program Events 2.3.5 Schedule
4.5.1.1.2 Significant Accomplishments 2.3.5 Schedule
4.5.1.1.3 Entrance/Exit Criteria 2.3.5 Schedule
4.5.1.1.4 Process Narratives 2.3.5 Schedule
4.5.1.2 IMS 2.3.5 Schedule
4.5.1.2.1 2.3.5 Schedule
4.5.1.2.2 2.3.5 Schedule
4.5.1.2.3 IMS Content 2.3.5 Schedule
4.5.1.2.4 IMS Format 2.3.5 Schedule
4.5.1.2.5 Chapter 1 - IMS 2.3.5 Schedule
System Spec
Para. Number
System Specification
04 SEP 2012
Training System Spec
Para. Number
SS 3.2.1.4.2.1 through 3.2.1.4.2.1.2.3.1,
3.2.1.4.3 - 3.2.1.4.3.2.1, Appendix D, Appendix F
Ballistic Threat Vulnerability
Reduction and Force Protection
XX
SS 3.2.3.4.4.1 through 3.2.3.4.4.1.7 Net-Ready XX
SS 3.2.1.3.5.2.1 and 3.2.1.3.5.2.2 Tactical Datalink and Intelligence
Broadcast requirements
XX
SS 3.2.1.3.1.2.7 through 3.2.1.3.1.2.10 Tactical Communications requirements
XX
XX XX XX
SS 3.2.1.2.1.2.5.1
SS 3.2.1.2.1.2
Combat Radius
Combat Search and Rescue (CSAR)
Primary Mission
XX
SS 3.2.1.2.3.1 Hover XX
SS 3.2.1.2.1.1, 3.2.1.2.1.2,
3.2.1.2.1.2.4.2.1, 3.2.1.2.1.2.4.2.2, Table 3.2-1
Payload XX
SS 3.2.1.2.1.2 Mission Performance XX
SS 3.2.1.3.9.9.3 through
3.2.1.3.9.9.3.3.1, 3.2.1.3.9.9.4, 3.2.1.3.9.9.4.1, 3.2.1.3.9.9.5, 3.2.1.3.9.9.5.1,3.4.1.1.5.1, 3.2.1.4.3.2, and 3.4.1.1.5.2
Human Systems Integration XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 4.5.1.2.5.1 Electronic / Hard Copy 2.3.5 Schedule
4.5.1.2.5.2 Critical Path 2.3.5 Schedule
4.5.1.2.5.3 Predecessors/Successors 2.3.5 Schedule
4.5.1.2.5.4 LOE tasks 2.3.5 Schedule
4.5.1.2.5.5 Durations 2.3.5 Schedule
4.5.1.2.5.6 Reserved 2.3.5 Schedule
4.5.1.2.5.7 Tasks 2.3.5 Schedule
4.5.1.2.5.8 Technical Subfactor in MS Project Text2 Field 2.3.5 Schedule
4.5.1.2.5.9 Reserved 2.3.5 Schedule
4.5.1.2.5.10 Excessive Lag Time 2.3.5 Schedule
4.5.1.2.5.11 Logical Relationships 2.3.5 Schedule
4.5.1.2.6 Chapter 2 - Schedule Rationale 2.3.5 Schedule
4.5.1.2.6.1 Narratives 2.3.5 Schedule
4.5.1.2.6.1.1 Assumptions & Data used for relationships 2.3.5 Schedule
4.5.1.2.6.1.2 Reserved XX XX
4.5.1.2.6.1.3 Multiple critical paths 2.3.5 Schedule
4.5.1.2.6.1.4 Offeror's / Government work calendar 2.3.5 Schedule
4.5.1.2.6.1.5 Schedule Health Assessment (SHA) 2.3.5 Schedule
4.5.2 Reserved XX XX
4.5.3 Contract Work Breakdown Structure (CWBS) 2.3.5 Contract Work Breakdown Structure (CWBS)
4.5.4 Airworthiness (AW) 2.3.5 Airworthiness (AW)
4.5.5 Live Fire Test and Evaluation (LFT&E) 2.3.5 Live Fire Test & Evaluation (LFT&E)
4.5.6 Manufacturing and Quality 2.3.5 Manufacturing and Quality
4.5.6 Quality 2.3.5 Quality
4.5.6 Production Capacity 2.3.5 Production Capacity
4.5.6 Manufacturing Readiness Assessment (MRA) 2.3.5 Manufacturing Readiness Assessment (MRA)
4.5.7 Reserved XX XX
System Spec
Para. Number
System Specification
04 SEP 2012
Training System Spec
Para. Number
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 4.5.8 Small Business 2.3.5 Small Business Participation Plan
4.5.8.1 Reserved XX XX
4.5.8.2 Small Business Participation Plan 2.3.5 Small Business Participation Plan
4.5.9 Reliability 2.3.5 Reliability
4.5.9.1 Reliability 2.3.5 Reliability
4.5.9.2 Reliability and Maintainability (R&M)
Engineering Program
2.3.5 Reliability
4.5.9.2.1 Reliability Models 2.3.5 Reliability
4.5.9.2.2 System Engineering Integration 2.3.5 Reliability
4.5.9.2.3 Life-Cycle Loads on Subsystems, Assemblies, Subassemblies, LRUs, and Components
2.3.5 Reliability
4.5.9.2.4 Reliability 2.3.5 Reliability
4.5.9.2.5 Reliability 2.3.5 Reliability
4.5.9.2.6 Reliability 2.3.5 Reliability
4.6 Subfactor 1.4: Training System 2.3.6 Subfactor 1.4: Training System
4.6.1 Reserved XX XX
4.6.2 Training Devices Development & Delivery 2.3.6 Aircrew Training Devices (ATD) & Maintenance
Training Devices (MTD)
Development and Delivery4.6.3 Aircrew & Maintenance Courseware 2.3.6 Aircrew & Maintenance Courseware Development
4.6.4 Type 1 Training 2.3.6 Type 1 Training
System Spec
Para. Number
System Specification
04 SEP 2012
Training System Spec
Para. Number
XX XX XX
XX XX XX
XX XX XX
XX XX XX
SS 3.2.3.2 Reliability XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX 3.2
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 4.6.5 ATD & MTD Concurrency with air vehicle to meet ATD/MTD beddown
2.3.6 Training System Configuration Management /
Concurrency
4.6.6 Distributed Mission Operations (DMO) 2.3.6 DMO for WST & OFT
4.6.7 Preservation of fidelity of primary crew
members
2.3.6 Preservation of fidelity of primary crew members
4.7 Subfactor 1.5: Product Support 2.3.7 Subfactor 1.5: Product Support
4.7.1 Maintainability 2.3.7 Maintainability
4.7.1.1 Maintainability 2.3.7 Maintainability
4.7.2 Logistics Support 2.3.7 Logistics Support
4.7.2.1 Logistics Support Strategy during POS & ISS 2.3.7 Logistics Support
4.7.2.2 Initial Spares, Readiness Spares Package (RSP), SE Package, SE Mobility Package
2.3.7 Logistics Support
4.7.2.3 Management of Spares during ISS transition
from C-ICP to the government
2.3.7 Logistics Support
4.7.3 Technical Manuals 2.3.7 Technical Manuals
4.7.3.1 Technical Manuals 2.3.7 Technical Manuals
4.7.3.2 Technical Manuals 2.3.7 Technical Manuals
4.7.3.3 Technical Manuals 2.3.7 Technical Manuals
4.7.3.4 Technical Manuals 2.3.7 Technical Manuals
4.7.3.5 Technical Manuals 2.3.7 Technical Manuals
4.7.3.6 Technical Manuals 2.3.7 Technical Manuals
4.7.4 Data Management 2.3.7 Data Management /Rights
4.7.4.1 Data Rights 2.3.7 Data Management /Rights
4.7.4.1.1 Pre-Award Identification and Assertion 2.3.7 Data Management /Rights
4.7.4.1.1.1 Noncommercial Technologies 2.3.7 Data Management /Rights
4.7.4.1.1.2 Commercial Technologies 2.3.7 Data Management /Rights
System Spec
Para. Number
System Specification
04 SEP 2012
Training System Spec
Para. Number
XX XX XX
XX XX 3.2.18
XX XX 3.2
XX XX XX
SS 3.2.3.3 Maintainability XX
XX XX XX
XX XX XX
SS 3.2.3.1 Availability XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 4.7.4.1.1.3 Reserved 2.3.7 Data Management /Rights
4.7.4.1.1.4 2.3.7 Data Management /Rights
4.7.4.1.1.5 2.3.7 Data Management /Rights
4.7.4.1.2 Reserved XX XX
4.7.4.1.3 Commercial Software License Terms 2.3.7 Data Management /Rights
4.8 Reserved 2.3.8 Reserved
5.0 Volume III: Cost/Price Volume 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1 General Instructions 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.1 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.2 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.3 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.4 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.5 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.6 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.7 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.8 Phasing of Funding Requirements 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.8.1 EMD Phasing 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.8.2 Production Phasing (Procurement) 2.4 Factor 2: Cost/Price Evaluation Procedures
5.1.9 Reserved XX XX
5.1.10 Quantities 2.4 Factor 2: Cost/Price Evaluation Procedures
5.2 Total Evaluated Price (TEP) 2.4.1 Total Evaluated Price (TEP)
5.2.1 Total Proposed Price (TPP) 2.4 Factor 2: Cost/Price Evaluation Procedures
5.2.1.1 Overrun to EMD Ceiling Price 2.4 Factor 2: Cost/Price Evaluation Procedures
5.2.1.2 VIQ Matrix for Aircraft 2.4.1.1.1 Aircraft VIQ Matrix (Section J, Attachment 7)
5.2.1.3 VIQ Pricing Narrative XX XX
5.2.1.4 Interim Supply Support (ISS) CLINs 2.4.1.1.2 Interim Supply Support (ISS) CLINs (to include ISS-
IOT&E)
5.2.1.5 Live Fire Assets CLINs 2.4.1.1.5 Live Fire Test Assets CLINs
5.2.1.6 Readiness Spares Packages (RSP) and SE
Mobility Packages
2.4.1.1.6 Readiness Spares Packages (RSP) and SE Mobility
Packages
5.2.2 Fuel Adjustment 2.4.1.2 Fuel Costs Adjustment to TEP
5.2.3 ST/TE Adjustment 1.3
2.4.1.3
Competitive Advantage from Use Special Tooling/Test
Equipment
Special Tooling/Test Equipment (ST/TE) Adjustment to
TEP
System Spec
Para. Number
System Specification
04 SEP 2012
Training System Spec
Para. Number
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
SS 3.2.3.4.2 Fuel Usage Factor XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 5.2.4 Goal Adjustment 2.3.1
2.4.1.4
Technical Compliance Rating
Goal Credit Adjustment to TEP
6 Volume IV - Contract 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1 Model Contract/Representations and
Certifications
5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.1 Section A - Solicitation/Contract Form 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.2 Section B - Supplies or Services and Costs/Prices 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.3 Section C - Description/Specs/Work Statement 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.4 Section D - Packaging and Marking 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.5 Section E - Inspection and Acceptance 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.6 Section F - Deliveries or Performance 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.7 Section G - Contract Administrative Data 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.8 Section H - Special Contract Requirements 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.9 Section I - Contract Clauses 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10 Section J – List of Attachments 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.1 Exhibits 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.2 Attachments 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.2.1 Attachments 1 through 3 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.2.2 Attachment 4, 5, 11, 12, 13, 18, 22, 23, 24, 25, 26, 27, 28, 29, 30, and 31
5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.2.3 Attachment 6 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.2.4 Attachment 7 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.2.5 Attachment 8 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.2.6 Attachments 10, 14, 15, 16, 17, and 21 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.2.7 Attachment 19 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.2.8 Attachment 20 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.10.2.9 Attachment 32 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.1.11 Section K - Representations, Certifications, and
other Statements of Offerors
5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.2 CEO Certification 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.3 Other Information Required 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.3.1 DD Form 2345 - Military Critical Technical Data
Agreement
5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
6.3.2 Government Offices 5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
System Spec
Para. Number
System Specification
04 SEP 2012
Training System Spec
Para. Number
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 6.3.3 Company/Division Address, Identifying Codes, and Applicable Designations
5.0 M005 SOLICITATION REQUIREMENTS, TERMS AND
CONDITIONS
7 Volume V - Past Performance 2.5 Factor 3: Past Performance Evaluation Procedures
7.1 General Instructions 2.5 Factor 3: Past Performance Evaluation Procedures
7.1.1 Content of Past Performance Volume 2.5 Factor 3: Past Performance Evaluation Procedures
7.1.1.1 Table of Contents 2.5 Factor 3: Past Performance Evaluation Procedures
7.1.1.2 Summary Page 2.5 Factor 3: Past Performance Evaluation Procedures
7.1.1.3 Past Performance Information Tool 2.5 Factor 3: Past Performance Evaluation Procedures
7.1.1.3.1 2.5 Factor 3: Past Performance Evaluation Procedures
7.1.1.4 Past Performance Questionnaire and Tracking
Record
2.5 Factor 3: Past Performance Evaluation Procedures
7.1.1.5 Consent Letters / Client Authorization Letter 2.5 Factor 3: Past Performance Evaluation Procedures
7.1.1.6 Organization Structure Change History 2.5 Factor 3: Past Performance Evaluation Procedures
7.1.1.7 Small Business Utilization 2.3.5 Small Business Participation Plan
7.1.1.7.1 2.3.5 Small Business Participation Plan
7.1.1.7.2 2.3.5 Small Business Participation Plan
7.1.2 Relevancy and Recency of Past Performance
Information
2.5 Factor 3: Past Performance Evaluation Procedures
7.1.3 Determination of Responsibility 2.5 Factor 3: Past Performance Evaluation Procedures
8 List of Attachments XX XX
System Spec
Para. Number
System Specification
04 SEP 2012
Training System Spec
Para. Number
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
XX XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION
1.1 PROGRAM STRUCTURE AND OBJECTIVES 1.1 Basis of Contract Award
2.0 GENERAL INSTRUCTIONS
2.1 XX XX
2.2 XX XX
2.3 XX XX
2.4 XX XX
2.5 XX XX
2.6 General Information XX XX
2.6.1 Point of Contact XX XX
2.6.2 Debriefings XX XX
2.6.3 Discrepancies XX XX
2.6.4 Electronic Reference Documents XX XX
2.6.5 Organization/Number of Copies/Page Limits XX XX
2.6.6 Page Limitations XX XX
2.7 Classified Information XX XX
2.7.1 Disposition of Classified Material Not Received
Under a Specific Contract
XX XX
2.7.2 Directions for Classifying Documents XX XX
2.8 Cross Referencing XX XX
2.8.1 Cross Referencing Matrix (CRM) XX XX
2.8.2 Cross Referencing Between Volumes XX XX
2.9 Indexing XX XX
2.10 Glossary of Abbreviations and Acronyms XX XX
2.11 Page Size and Format XX XX
2.11.1 Page Size XX XX
2.11.2 Tables, Charts, Graphs & Figures XX XX
2.12 Binding and Labeling XX XX
2.13 Electronic Offers XX XX
2.14 Proposal Submission XX XX
3.0 VOLUME I – EXECUTIVE SUMMARY VOLUME
3.1 Narrative Summary XX XX
3.2 Table of Contents XX XX
3.3 Cross Reference Matrix (CRM) XX XX
4.0 VOLUME II – TECHNICAL VOLUME 2.3 Factor 1: Technical
4.1 Technical Volume XX XX
4.2 Format and Specific Content XX XX
4.2.1 Technical XX XX
4.2.1.1 Volume Organization XX XX
4.2.1.2 Reserved XX XX
4.2.1.3 Air Vehicle Description Data 2.3 Factor 1: Technical
4.3 Subfactor 1.1: Systems Integration 2.3.3 Subfactor 1.1 Systems Integration
4.3.1 Reserved XX XX
4.3.2 RF Capabilities Required 2.3.3 Radio Frequency (RF) Capabilities Required
4.3.3 EO/IR Detection and Countermeasures Required 2.3.3 EO/IR Detection and Countermeasures Required
4.3.4 LASER Detection 2.3.3 LASER Detection
Training System Spec
04 SEP 2012
IMP IMS CWBS CDRL
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX XX
XX
XX XX
XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 4.3.5 Ballistic Threat Vulnerability Reduction and
Force Protection
2.3.3 Ballistic Threat Vulnerability Reduction and Force
Protection
4.3.6 Net-Ready 2.3.3 Net-Ready
4.3.7 Tactical Datalink and Integrated Broadcast
Service Requirements
2.3.3 Tactical Datalink and Integrated Broadcast Service
Requirements
4.3.8 Tactical Communications Requirements 2.3.3 Tactical Communications Requirements
4.3.9 Mock-ups and System Integration Labs (SILs) 2.3.3 Mock-ups and System Integration Labs
4.4 Subfactor 1.2: Aircraft Mission Capability 2.3.4 Subfactor 1.2: Aircraft Mission Capability
4.4.1 Combat Radius 2.3.4 Combat Radius
4.4.2 Hover 2.3.4 Hover
4.4.3 Payload 2.3.4 Payload
4.4.4 Mission Performance 2.3.4 Mission Performance
4.4.5 Human Systems Integration 2.3.4 Human Systems Integration
4.5 Subfactor 1.3 - Systems Engineering / Program
Management (SE/PM)
2.3.5 Subfactor 1.3: Systems Engineering / Program
Management (SE/PM)
4.5.1 Schedule: Integrated Master Plan (IMP) /
Integrated Master Schedule
2.3.5 Schedule
4.5.1.1 IMP 2.3.5 Schedule
4.5.1.1.1 Key Program Events 2.3.5 Schedule
4.5.1.1.2 Significant Accomplishments 2.3.5 Schedule
4.5.1.1.3 Entrance/Exit Criteria 2.3.5 Schedule
4.5.1.1.4 Process Narratives 2.3.5 Schedule
4.5.1.2 IMS 2.3.5 Schedule
4.5.1.2.1 2.3.5 Schedule
4.5.1.2.2 2.3.5 Schedule
4.5.1.2.3 IMS Content 2.3.5 Schedule
4.5.1.2.4 IMS Format 2.3.5 Schedule
4.5.1.2.5 Chapter 1 - IMS 2.3.5 Schedule
Training System Spec
04 SEP 2012
IMP IMS CWBS CDRL
XX XX
XX XX
XX XX
XX XX
XX DI-CMAN-81253A/T (A002)
DI-SESS-81000D/T (B023)
DI-SESS-81003D/T (B044)
DI-SESS-81000D/T (B045)
XX XX
XX XX
XX XX
XX XX
XX XX
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 4.5.1.2.5.1 Electronic / Hard Copy 2.3.5 Schedule
4.5.1.2.5.2 Critical Path 2.3.5 Schedule
4.5.1.2.5.3 Predecessors/Successors 2.3.5 Schedule
4.5.1.2.5.4 LOE tasks 2.3.5 Schedule
4.5.1.2.5.5 Durations 2.3.5 Schedule
4.5.1.2.5.6 Reserved 2.3.5 Schedule
4.5.1.2.5.7 Tasks 2.3.5 Schedule
4.5.1.2.5.8 Technical Subfactor in MS Project Text2 Field 2.3.5 Schedule
4.5.1.2.5.9 Reserved 2.3.5 Schedule
4.5.1.2.5.10 Excessive Lag Time 2.3.5 Schedule
4.5.1.2.5.11 Logical Relationships 2.3.5 Schedule
4.5.1.2.6 Chapter 2 - Schedule Rationale 2.3.5 Schedule
4.5.1.2.6.1 Narratives 2.3.5 Schedule
4.5.1.2.6.1.1 Assumptions & Data used for relationships 2.3.5 Schedule
4.5.1.2.6.1.2 Reserved XX XX
4.5.1.2.6.1.3 Multiple critical paths 2.3.5 Schedule
4.5.1.2.6.1.4 Offeror's / Government work calendar 2.3.5 Schedule
4.5.1.2.6.1.5 Schedule Health Assessment (SHA) 2.3.5 Schedule
4.5.2 Reserved XX XX
4.5.3 Contract Work Breakdown Structure (CWBS) 2.3.5 Contract Work Breakdown Structure (CWBS)
4.5.4 Airworthiness (AW) 2.3.5 Airworthiness (AW)
4.5.5 Live Fire Test and Evaluation (LFT&E) 2.3.5 Live Fire Test & Evaluation (LFT&E)
4.5.6 Manufacturing and Quality 2.3.5 Manufacturing and Quality
4.5.6 Quality 2.3.5 Quality
4.5.6 Production Capacity 2.3.5 Production Capacity
4.5.6 Manufacturing Readiness Assessment (MRA) 2.3.5 Manufacturing Readiness Assessment (MRA)
4.5.7 Reserved XX XX
Training System Spec
04 SEP 2012
IMP IMS CWBS CDRL
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX XX
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX DI-MGMT-81650/T (A031)
XX XX
XX DI-MGMT-81334D (A022)
XX DI-SESS-81766/T (B021)
DI-MGMT-80004A/T (B022)
XX DI-MISC-80564/T (A059)
DI-NDTI-81284/T (A063)
DI-NDTI-80809B/T (A062)
XX DI-MGMT-80004/T (A024)
XX DI-QCIC-81794B (A028)
XX DI-MGMT-80004/T (A024)
XX DI-MGMT-80004A/T (A025)
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 4.5.8 Small Business 2.3.5 Small Business Participation Plan
4.5.8.1 Reserved XX XX
4.5.8.2 Small Business Participation Plan 2.3.5 Small Business Participation Plan
4.5.9 Reliability 2.3.5 Reliability
4.5.9.1 Reliability 2.3.5 Reliability
4.5.9.2 Reliability and Maintainability (R&M)
Engineering Program
2.3.5 Reliability
4.5.9.2.1 Reliability Models 2.3.5 Reliability
4.5.9.2.2 System Engineering Integration 2.3.5 Reliability
4.5.9.2.3 Life-Cycle Loads on Subsystems, Assemblies, Subassemblies, LRUs, and Components
2.3.5 Reliability
4.5.9.2.4 Reliability 2.3.5 Reliability
4.5.9.2.5 Reliability 2.3.5 Reliability
4.5.9.2.6 Reliability 2.3.5 Reliability
4.6 Subfactor 1.4: Training System 2.3.6 Subfactor 1.4: Training System
4.6.1 Reserved XX XX
4.6.2 Training Devices Development & Delivery 2.3.6 Aircrew Training Devices (ATD) & Maintenance
Training Devices (MTD)
Development and Delivery4.6.3 Aircrew & Maintenance Courseware 2.3.6 Aircrew & Maintenance Courseware Development
4.6.4 Type 1 Training 2.3.6 Type 1 Training
Training System Spec
04 SEP 2012
IMP IMS CWBS CDRL
XX DI-MGMT-80368A/T (A082)
XX XX
XX DI-MGMT-80368A/T (A082)
XX DI-MGMT-81453A/T (A001)
DI-SESS-81613/T (A091)
XX DI-MGMT-81453A/T (A001)
DI-SESS-81613/T (A091)
XX DI-MGMT-81453A/T (A001)
DI-SESS-81613/T (A091)
XX DI-MGMT-81453A/T (A001)
DI-SESS-81613/T (A091)
DI-RELI-81496/T (A090)
XX DI-MGMT-81453A/T (A001)
DI-SESS-81613/T (A091)
XX DI-MGMT-81453A/T (A001)
DI-SESS-81613/T (A091)
XX DI-MGMT-81453A/T (A001)
DI-SESS-81613/T (A091)
XX DI-MGMT-81453A/T (A001)
DI-SESS-81613/T (A091)
XX DI-MGMT-81453A/T (A001)
DI-SESS-81613/T (A091)
XX XX
CRH Aircrew Training
Devices
XX DI-SESS-81522B/T (B061)
DI-SESS-81517B/T, B056;
DI-SESS-81518B/T, B057;
DI-SESS-81519B/T, B058;
DI-SESS-81520B/T, B059;
DI-SESS-81521B/T, B060;
DI-SESS-81522B/T, B061;
DI-SESS-81523B/T, B062;
DI-SESS-81524B/T, B063;
DI-SESS-81525B/T, B064;
DI-SESS-81526B/T, B065;
DI-SESS-81527B/T, B066
XX DI-ILSS-80872/T (B051)
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions , Conditions, and
Notices to Offerors or Respondents)
01 OCT 2012
SEC M Para.
Number
SECTION M (Evaluation Factors for Award)
21 SEP 2012
1.0 PROGRAM STRUCTURE AND OBJECTIVES 1.0 SOURCE SELECTION 4.6.5 ATD & MTD Concurrency with air vehicle to meet ATD/MTD beddown
2.3.6 Training System Configuration Management /
Concurrency
4.6.6 Distributed Mission Operations (DMO) 2.3.6 DMO for WST & OFT
4.6.7 Preservation of fidelity of primary crew
members
2.3.6 Preservation of fidelity of primary crew members
4.7 Subfactor 1.5: Product Support 2.3.7 Subfactor 1.5: Product Support
4.7.1 Maintainability 2.3.7 Maintainability
4.7.1.1 Maintainability 2.3.7 Maintainability
4.7.2 Logistics Support 2.3.7 Logistics Support
4.7.2.1 Logistics Support Strategy during POS & ISS 2.3.7 Logistics Support
4.7.2.2 Initial Spares, Readiness Spares Package (RSP), SE Package, SE Mobility Package
2.3.7 Logistics Support
4.7.2.3 Management of Spares during ISS transition
from C-ICP to the government
2.3.7 Logistics Support
4.7.3 Technical Manuals 2.3.7 Technical Manuals
4.7.3.1 Technical Manuals 2.3.7 Technical Manuals
4.7.3.2 Technical Manuals 2.3.7 Technical Manuals
4.7.3.3 Technical Manuals 2.3.7 Technical Manuals
4.7.3.4 Technical Manuals 2.3.7 Technical Manuals
4.7.3.5 Technical Manuals 2.3.7 Technical Manuals
4.7.3.6 Technical Manuals 2.3.7 Technical Manuals
4.7.4 Data Management 2.3.7 Data Management /Rights
4.7.4.1 Data Rights 2.3.7 Data Management /Rights
4.7.4.1.1 Pre-Award Identification and Assertion 2.3.7 Data Management /Rights
4.7.4.1.1.1 Noncommercial Technologies 2.3.7 Data Management /Rights
4.7.4.1.1.2 Commercial Technologies 2.3.7 Data Management /Rights
Training System Spec
04 SEP 2012
IMP IMS CWBS CDRL
XX DI-CMAN-80858B/T (A005)
Network Connectivity -
Distributed Mission
Operations
XX
CRH Aircrew Training
Devices
XX
XX DI-SESS-81613/T (A091)
XX DI-SESS-81613 (A091)
XX DI-ILSS-80095/T (A037)
XX DI-ILSS-80095/T (A037)
XX
DI-ILSS-80134A/T (A100)
DI-SESS-80294B/T (A047)
XX DI-MGMT-80368A/T (A012)
DI-ILSS-81226 (B004)
XX TM-86-01N/T (B005)
DI-TMSS-80067B/T (A051)
XX TM-86-01N;
DI-TMSS-80067B/T (A051)
XX TM-86-01N;
DI-TMSS-80067B/T (A051)
XX TM-86-01N;
DI-TMSS-80067B/T (A051)
XX TM-86-01N;
DI-TMSS-80067B/T (A051)
XX TM-86-01N;
DI-TMSS-80067B/T (A051)
XX TM-86-01N;
DI-TMSS-80067B/T (A051)
XX XX
XX XX
XX XX
12 Oct 2012
Proposal
Reference with Page
Number
SEC L Para.
Number
SECTION L (Instructions…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .