CRH_Final_RFP_Industry_Q A_Matrix_30_Oct_12.pdf

PDF 85 KB Posted

Attached to
Combat Rescue Helicopter (CRH)
Solicitation number
FA8629-12-R-2400
Issued by

View the file

Other files

File Type Posted
RFP_Amd_0004_Signed.pdf PDF
Sec_M_-Eval_Factors_for_Award_MASTER_17_Dec.pdf PDF
Sec_L_Attachment_1_-_TEP_Workbook_14_Dec.xlsx XLSX spreadsheet
CRH_Final_RFP_Industry_Q A_Matrix_17_Dec_12_Unsecure.pdf PDF
Amd_0002_SIGNED.pdf PDF
Sec_J _Attachment_3_-_SOW__14_Nov_12_(Master).pdf PDF
Sec_L_Attachment_1_-_TEP_Workbook_(14_Nov)_w_Adjustment.xlsx XLSX spreadsheet
Sec_L_-_Instructions_to_Offerors_MASTER_14_Nov.pdf PDF
Sec_M_-Eval_Factors_for_Award_MASTER_14_Nov.pdf PDF
CRH_Final_RFP_Industry_Q A_Matrix_-_16_Nov_12_Unsecure.pdf PDF
FA8629-12-R-2400-0001_Signed_Cover_Letter.pdf PDF
FA8629-12-R-2400-Amd0001.pdf PDF
Sec_L _Attachment_2_-_CRH_Cross_Reference_Matrix_(CRM)_12OCT2012.pdf PDF
Sec_J _Attachment_31_-_TMCR_10_01_2012.pdf PDF
Sec_L _Attachment_13_-_Past_Performance_Client_Authorization_Ltr_20_Jul.pdf PDF
Sec_J _Attachment_17_-_RSP_Kit_Listing_-_19_Jun.pdf PDF
Sec_J _Attachment_20_-_CRH_IMP_02_Oct_12.pdf PDF
Sec_J _Attachment_7_-_VIQ_Matrix_19_Jun.pdf PDF
Sec_J _Attachment_5_-_AFMC_Form_158.pdf PDF
Sec_J _Attachment_13_-_Base_Support_Agreement_20_Jul.pdf PDF
Sec_J _Attachment_25_-_2794-Contract_Prime_LRIP_19_Jul.pdf PDF
Sec_J _Attachment_30_-_2794-Contract_RDT_FRP_19_Jul.pdf PDF
Sec_L _Attachment_10_-_PAST_PERFORMANCE_SAMPLE_CONSENT_LETTER.pdf PDF
Sec_J _Attachment_32_-_Listing_of_Licenses_for_CLIN_0006.pdf PDF
CRH_Offeror_RFP_Question_Format.xlsx XLSX spreadsheet
Sec_L _Attachment_14_-_DCMA_14_Point_SHA_Macro.pdf PDF
Sec_J _Attachment_10_-_SE_Mobility_Package_Kit_Listing_-_19_Jun.pdf PDF
Sec_L _Attachment_11_-_PAST_PERFORMANCE_SAMPLE_QUESTIONNAIRE_CORP_COVER_LTR_19JUL.pdf PDF
Sec_M_-Eval_Factors_for_Award_MASTER_21_Sep_Credit.pdf PDF
Sec_J _Attachment_21_-_Training_System_SE_Listing-_24_Aug.pdf PDF
Sec_J _Attachment_8_-_Restrictions_on_Technical_Data_and_Computer_Software_21_Jun.pdf PDF
Sec_J _Attachment_28_-_2794-Contract_Prime_FRP_19_Jul.pdf PDF
Sec_A_through_K_-_19_Oct.pdf PDF
Sec_L _Attachment_9_-_PAST_PERFORMANCE_QUESTIONNAIRE_TRACKING_RECORD.pdf PDF
Sec_J _Attachment_26_-_2794-Contract_Sub_LRIP_19_Jul.pdf PDF
Sec_L _Attachment_1_-_TEP_Workbook_(24_Sep)_w_Adjustment.xlsx XLSX spreadsheet
Sec_J _Attachment_12_-_CLIN_and_SOW_Matrix_9_Oct.pdf PDF
Sec_J _Attachment_6_-__LFTE_Assets_List_19_Jun_12.pdf PDF
Sec_L _Attachment_3_-_Past_Performance_Information_Tools_24_May_12.pdf PDF
Sec_J _Attachment_15_-_Aircraft_SE_Listing-_19_Jun.pdf PDF
CRH_RFP_Cover_Letter.pdf PDF
Sec_J _Attachment_27_-_2794-Contract_RDT_LRIP_19_Jul.pdf PDF
Sec_L _Attachment_12_-_PAST_PRESENT_PERFORMANCE_QUESTIONNAIRE-_1_Jun.pdf PDF
Sec_J _Attachment_16_-_Training_System_Spares_Listing-_24_Aug.pdf PDF
Sec_J _Exhibit_A_CDRL_Non-OMIT_07-12-2012rev928.pdf PDF
Sec_J _Attachment_24_-_2794-Contract_RDT_EMD_19_Jul.pdf PDF
Sec_J _Attachment_3_-_SOW__3_Oct_12_(Master).pdf PDF
Sec_J _Exhibit_B_CDRL_OMIT_07-12-2012rev1010.pdf PDF
Sec_L_-_Instructions_to_Offerors_MASTER_1_Oct_TEP_Credit.pdf PDF
Sec_J _Attachment_14_-_Aircraft_Spares_Listing_-_19_Jun.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Section If Section J, list

Attach or Exhibit Paragraph Page Question or Comment Answer or Resolution

J 1 & 3

1 - SS, 3.2.3.3

Maintainability and

Section 4 3 - SOW, Reliability and Maintainability

Program Plan

(RMPP)

SOW – Page

The SOW contained within the final RFP added a new requirement (SOW 1.2.11.1) for the contractor to conduct Maintainability Demonstrations to verify compliance, in conjunction with T.O. certification and verification activities. The new requirement is ambiguous to the extent of the maintainability demonstration required and could potentially gives offerors with solutions currently in the U.S. inventory an advantage.

In order to ensure a level playing field please confirm that all offerors are required to bid a 100% maintainability demonstration as a part of this program, or specify the level of maintainability demonstration efforts offerors are required to propose.

The verification requirements for the maintainability requirements are clearly delineated in Section 4 of the SS. The purpose of the sentence in SOW para 1.2.11.1 (The contractor shall conduct maintainability demonstrations to verify compliance with maintainability requirements, in conjunction with Technical Order certification and verfication.) was to clarify that demonstrations for maintainability requirements should be combined with T.O.

certification/verifications activities to avoid duplication of effort. The statement was not meant to override the required verifications in the SS. The sentence in SOW para 1.2.11.1 will be removed since Section 4 of the SS already addresses methods of verification. There is no requirement for 100% maintainability demonstrations; see the SS, Section 4 for the verfication methodologies required.

CRH Final RFP Industry Q&A Matrix 30 Oct 12 (Unsecure)

Final RFP Q&As

File details come from the government source that posted it. Updated .