Sec_J _Exhibit_B_CDRL_OMIT_07-12-2012rev1010.pdf
PDF 3 MB Posted
- Attached to
- Combat Rescue Helicopter (CRH) Federal contract opportunity
- Solicitation number
- FA8629-12-R-2400
About this file
Sec J Exhibit B CDRL OMIT
View the file
Other files for this federal contract opportunity
Show all 50
Combat Rescue Helicopter (CRH) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G R I T S
CDRL TABLE OF CONTENTS
SET NAME: CRH - EXH B OMIT
CONTRACT NO: FA8629-12-R-2400
PROGRAM ID: COMBAT RESCUE
HELICOPTER
CONTRACTOR: TBD
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
B001 AFLCMC/WISE(CM) DI-CMAN-80643C/T
SPECIFICATION CHANGE NOTICE (SCN)
1.2.15
B002 AFLCMC/WISE(CM) DI-MISC-81454B/T
AUTOMATED COMPUTER PROGRAM
IDENTIFICATION NUMBER (ACPIN) DATA AND
CONTROL RECORD
1.2.15.2
B003 AFLCMC/WISL DI-ILSS-80739/T
DEPOT MAINTENANCE STUDY
DEPOT MAINTENANCE ACTIVATION PLANNING
(DMAP)
1.9.5.2.2
B004 AFLCMC/WISL DI-ILSS-81226
ICS SEE BLK 16
ISS DEPOT REPAIR
1.9.5.3.1
B005 AFLCMC/WISL TM-86-01N/T
TECHNICAL MANUAL CONTRACT REQUIREMENTS
(TMCR)
1.6.1.1.1, 1.4.1.2.2
B006 406 SCMS/GUMACB DI-PACK-80121C/T
SPECIAL PACKAGING INSTRUCTIONS (SPIs)
1.9.5.6
B007 AFLCMC/WISV-TEST DI-QCIC-80553A
ACCEPTANCE TEST PLAN
SYSTEM ACCEPTANCE
1.3.5.6.1, 1.4.6.1, 1.4.6.2, 1.4.6.4
B008 AFLCMC/WISE DI-IPSC-81431A/T
SYSTEM SUBSYSTEM SPECIFICATION (SSS)
AIR VEHICLE SPECIFICATION (AVS)
1.2.1.4
B009 AFLCMC/WISE DI-MISC-80711A/T
SCIENTIFIC AND TECHNICAL REPORTS
AERODYNAMIC LOADS ANALYSIS
1.2.3.3
B010 AFLCMC/WISE DI-MISC-80711A/T
MISSION PERFORMANCE ANALYSIS
B011 AFLCMC/WISE DI-MISC-80711A/T
FLIGHT DYNAMICS AND HANDLING QUALITIES
B012 AFLCMC/WISE DI-MISC-80711A
ENGINE CYCLE PERFORMANCE DECK
1.2.3.4
B013 AFLCMC/WISE DI-HFAC-80746B/T
HUMAN ENGINEERING DESIGN APPROACH
DOCUMENT
OPERATOR
1.2.6.2
B014 AFLCMC/WISE DI-HFAC-80747B/T
HUMAN ENGINEERING DESIGN APPROACH
DOCUMENT
MAINTAINER
1.2.6.3
B015 AFLCMC/WISE DI-MGMT-81501A/T
WEIGHT AND BALANCE REPORT FOR AIRCRAFT
WEIGHT AND BALANCE REPORTS AND CHARTS
1.2.7
B016 AFLCMC/WISE DI-MISC-80508B/T
TECHNICAL REPORT-STUDY/SERVICES
Blk 16
1.2.8.3
B017 AFLCMC/WISE DI-MISC-80508B/T
1.2.8.4
B018 AFLCMC/WISE DI-MISC-80508B/T
1.2.8.2
B019 AFLCMC/WISE DI-MISC-80508B/T
ASIP TECHNICAL REPORTS BLK 16
1.2.8.1
B020 AFLCMC/WISE DI-MFFP-81403/T
CORROSION PREVENTION AND CONTROL PLAN
1.2.4.6
B021 AFLCMC/WISE DI-SESS-81766/T
AIRWORTHINESS SPECIFICATION
1.2.1.2
B022 AFLCMC/WISE DI-MGMT-80004A/T
MANAGEMENT PLAN
AIRWORTHINESS PLAN
1.2.2.2
B023 WR-ALC/ENGLDC DI-SESS-81000D/T
PRODUCT DRAWINGS/MODELS AND ASSOCIATED
LISTS
SYSTEM INTEGRATION LABORATORY (SIL)
1.4.3.1, 1.6.2.2
B024 RESERVED
B025 AFLCMC/WISE DI-IPSC-81427A/T
SOFTWARE DEVELOPMENT PLAN (SDP)
1.2.9.1, 1.2.9.1.1
B026 AFLCMC/WISE DI-IPSC-81435A/T
SOFTWARE DESIGN DESCRIPTION (SDD)
1.2.9.2
B027 AFLCMC/WISE DI-IPSC-81438A/T
SOFTWARE TEST PLAN (STP)
B028 AFLCMC/WISE DI-IPSC-81439A/T
SOFTWARE TEST DESCRIPTION (STD)
B029 AFLCMC/WISE DI-IPSC-81441A/T
SOFTWARE PRODUCT SPECIFICATION (SPS)
1.2.9.2, 1.5.2.2.3
B030 AFLCMC/WISE DI-IPSC-81432A/T
SYSTEM/SUBSYSTEM DESIGN DESCRIPTION (SSDD)
B031 AFLCMC/WISE DI-IPSC-81433A/T
SOFTWARE REQUIREMENTS SPECIFICATION (SRS)
BLK 16
B032 AFLCMC/WISE DI-IPSC-81434A/T
INTERFACE REQUIREMENTS SPECIFICATION (IRS)
SEE BLK 16
B033 AFLCMC/WISE DI-IPSC-81440A/T
SOFTWARE TEST REPORT (STR)
B034 AFLCMC/WISE DI-IPSC-81442A/T
SOFTWARE VERSION DESCRIPTION (SVD)
B035 AFLCMC/WISE-MFG DI-SDMP-81493A/T
PROGRAM-UNIQUE SPECIFICATION DOCUMENTS
AIRCRAFT PRODUCT ATTRIBUTES SPECIFICATION
1.2.1.6
B036 AFLCMC/WISE DI-SDMP-81493A/T
PROGRAM-UNIQUE SPECIFICATION DOCUMENTS
1.2.15.2
B037 AFLCMC/WISE DI-CMAN-81248A/T
INTERFACE CONTROL DOCUMENT (ICD)
1.2.1.7, 1.2.3.5, 1.2.3.7, 1.2.3.8
B038 AFLCMC/WISV-ENVIR DI-SESS-81694B/T
ENGINEERING DATABASE AND CONFIGURATION
MANAGEMENT INFORMATION
ESOH HAZARD RISK TRACKING DATABASE
1.2.4.4
B039 AFLCMC/WISE DI-SESS-80980A/T
RELIABILITY CENTERED MAINTENANCE (RCM)
FAILURE MODE AND EFFECTS ANALYSIS
RCM FMECA REPORT
1.2.3.1, 1.2.11.6
B040 AFLCMC/WISE DI-SESS-81315B/T
FAILURE ANALYSIS AND CORRECTIVE ACTION
REPORT (FACAR)
1.2.11.5
B041 AFLCMC/WISE DI-MISC-80508B/T
TECHNICAL REPORT - STUDY/SERVICES
REQUIRED NAVIGATION PERFORMANCE
ANALYSIS
1.2.16.6
B042 AFLCMC/WISE DI-MISC-80508B/T
OCEANIC COMMUNICATIONS AVAILABILITY
ANALYSIS
1.2.16.6
B043 WR-ALC/ENGLDC DI-SESS-81000D/T
LISTS
1.6.2.5
B044 WR-ALC/ENGLDC DI-SESS-81003D/T
COMMERCIAL DRAWINGS/MODELS AND
ASSOCIATED LISTS
1.4.3.1, 1.6.2.4
B045 WR-ALC/ENGLDC DI-SESS-81000D/T
LISTS
AVIONICS INTEGRATION SUPPORT FACILITY
(AISF)
1.4.3.3, 1.6.2.3
B046 AFLCMC/WISV-TRAIN DI-ILSS-80134A/T
PROPOSED SPARE PARTS LIST
CRH TRAINING SYSTEM
1.5.2.4
B047 AFLCMC/WISV-TRAIN DI-ILSS-80502
LIST OF FAULTS INSERTED FOR TRAINING
PURPOSES
CRH TRAINING SYSTEM
1.5.1.1, 1.5.1.2, 1.5.1.3, 1.5.1.4
B048 AFLCMC/WISV-TRAIN DI-MISC-80508B/T
SIMULATOR DATA PACKAGE
1.6.2.1
B049 AFLCMC/WISV-TRAIN DI-MISC-80508B/T
BLK16
B050 RESERVED
B051 AFLCMC/WISV-TRAIN DI-ILSS-80872/T
TRAINING MATERIALS
CRH TRAINING SYSTEM - TYPE 1 TRAINING
MATERIAL
1.5.2.1
B052 AFLCMC/WISV-TRAIN DI-ILSS-81070/T
TRAINING PROGRAM DEVELOPMENT AND
MANAGEMENT PLAN
CRH TRAINING SYSTEM - MANAGEMENT PLAN
1.5
B053 AFLCMC/WISV-TRAIN DI-MISC-81184/T
TRAINING EQUIPMENT SUMMARY
CRH TRAINING SYSTEM - ORANGE BOOK
1.5.1, 1.5.1.1
B054 AFLCMC/WISV-TRAIN DI-MISC-81417/T
MINIMUM EQUIPMENT SUBSYSTEM LIST (MESL)
CRH TRAINING SYSTEM -ATD/MTD EQUIPMENT
1.5.2.6, 1.9.5.2.1
B055 AFLCMC/WISV-TRAIN DI-IPSC-81448A/T
FIRMWARE SUPPORT MANUAL
B056 AFLCMC/WISV-TRAIN DI-SESS-81517B/T
TRAINING SITUATION DOCUMENT
B057 AFLCMC/WISV-TRAIN DI-SESS-81518B/T
INSTRUCTIONAL PERFORMANCE REQUIREMENTS
DOCUMENT
B058 AFLCMC/WISV-TRAIN DI-SESS-81519B/T
INSTRUCTIONAL MEDIA REQUIREMENTS
DOCUMENT
B059 AFLCMC/WISV-TRAIN DI-SESS-81520B/T
INSTRUCTIONAL MEDIA DESIGN PACKAGE
B060 AFLCMC/WISV-TRAIN DI-SESS-81521B/T
TRAINING PROGRAM STRUCTURE DOCUMENT
B061 AFLCMC/WISV-TRAIN DI-SESS-81522B/T
COURSE CONDUCT INFORMATION PACKAGE
B062 AFLCMC/WISV-TRAIN DI-SESS-81523B/T
TRAINING CONDUCT SUPPORT DOCUMENT
B063 AFLCMC/WISV-TRAIN DI-SESS-81524B/T
TRAINING EVALUATION DOCUMENT
B064 AFLCMC/WISV-TRAIN DI-SESS-81525B/T
TEST PACKAGE
B065 AFLCMC/WISV-TRAIN DI-SESS-81526B/T
INSTRUCTIONAL MEDIA PACKAGE
B066 AFLCMC/WISV-TRAIN DI-SESS-81527B/T
TRAINING SYSTEM SUPPORT DOCUMENT
B067 AFLCMC/WISV-TRAIN DI-IPSC-81431A/T
SYSTEM/SUBSYSTEM SPECIFICATION (SSS)
CRH TRAINING SUBSYSTEM SPECIFICATIONS
1.2.1.5, 1.2.1.5.1, 1.2.1.5.2
B068 AFLCMC/WISV-TRAIN DI-FACR-80966/T
TRAINER FACILITIES REPORT (TRF)
1.5.3.3, 1.5.3.4
B069 AFLCMC/WISV-TRAIN DI-MGMT-80004/T
1.2.5.2.1
B070 AFLCMC/WISV-TRAIN DI-MGMT-81845/T
INFORMATION ASSURANCE DESIGN REVIEW
INFORMATION PACKAGE (DRIP)
DRIP FOR CRH TRAINING SYSTEM
1.2.5.2.2
B071 RESERVED
B072 AFLCMC/WISE DI-IPSC-81431A
SYSTEM/SUBSYSTEM SPECIFICATION (SSS)
SYSTEM SPECIFICATION
1.2.1.1
B073 RESERVED
B074 AFLCMC/WISV-TRAIN DI-MGMT-80368A/T
STATUS REPORT
CRH TRAINING SYSTEM ICS MONTHLY REPORT
1.5.2.5
B075 AFLCMC/WISV DI-MISC-81281/T
AIRCRAFT TRAINER CRITERIA REPORT
CRH TRAINING SYSTEM DESIGN CRITERIA LIST
(DCL)
1.6.2.1.2
B076 AFLCMC/WISV-TRAIN DI-SDMP-81464A/T
DETAIL SPECIFICATION DOCUMENTS
1.2.1.5.1, 1.2.1.5.2
B077 AFLCMC/WISE DI-MGMT-80004/T
AVIONICS INTEGRATION SUPPORT FACILITY
1.6.2.3
B078 AFLCMC/WISE DI-SESS-81000D/T
PRODUCT DRAWINGS/MODEL AND ASSOCIATED
LISTS
B079 AFLCMC/WISE DI-SESS-81001D/T
CONCEPTUAL DESIGN DRAWINGS/MODELS
TEST BENCH CONCEPTS AND SPECIFICATIONS
B080 AFLCMC/WISE DI-SESS-81770/T
SYSTEM SOFTWARE INTEGRATION LAB (SIL)
DEVELOPMENT
1.6.2.2
B081 AFLCMC/WISE DI-SESS-81000D/T
LISTS
B082 AFLCMC/WISE DI-SESS-81001D/T
CONCEPTUAL DESIGN DRAWINGS/MODELS
TEST BENCH CONCEPTS AND SPECIFICATIONS
(SIL)
B083 AFLCMC/WISE DI-IPSC-81429A
SOFTWARE TRANSITION PLAN (STRP)
POST DEPLOYMENT SOFTWARE SUPPORT
1.6.1.2.1.3
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER CMAN
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE O F DATA ITEM 3. SUBTITLE
B001 SPECIFICATION CHANGE NOTICE (SCN)
4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
AFLCMC/WISE(CM)
DI-CMAN-80643C/T 1.2.15
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. Date of First Submission
14. DISTRIBUTION
LT D BLK16 BLK16
a. ADDRESSEE
b. COPIES
8.APP CODE
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
16. REMARKS WISE (CM) 1 1
. WISE 1 1
.Blk 4: This DID is tailored as follows:
.a. SCN shall include the identifier of the ECP which proposed
.the current change.
.Blk 9: See General Notes.
.Blks 10, 12 & 13: Submit proposed SCN's to affected System
.Specification or any other contract specification, as part of
.the Engineering Change Proposals (ECPs). Specification
.revisions shall be submitted via a no-cost ECP after
.incorporation of five SCNs or after incorporation of SCNs which
.drive changes to 25% or more of the specification, based on
Total number of requirements, whichever occurs first.
.Blk 14: Distribute "approved" signed SCN's 30 days after
.receipt of contract modification.
Blk 14: See General Notes, paragraph 6.
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
FA8629-12-R-2400
Exhibit B
17. PRICE
GROUP
18.ESTIMATED
TOTAL PRICE
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MISC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
B002 AUTOMATED COMPUTER PROGRAM IDENTIFICATION
NUMBER (ACPIN) DATA AND CONTROL RECORD
AFLCMC/WISE(CM)
DI-MISC-81454B/T 1.2.15.2
14. DISTRIBUTION
LT BLK16 BLK16 BLK16
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
16. REMARKS WISE (CM) 1
WISE 1
.a. Contractor format is acceptable.
.b. ACPIN request shall be submitted for each CSCI.
.Blk 9: Distribution "E" if documents contain proprietary, "D" if documents does not contain proprietary.
.Blks 10, 12: Training System first submission shall be submitted
.30 days after System Functional Review (SFR).
.Blk 13: Request for ACPIN shall be submitted for Air Vehicle
30 days after SRR.
.Submit with each ECP and when the requirement is identified. an
.ACPIN version shall be delivered with each software delivery
.and each release of an interim change. ACPIN version or
.revision request shall be submitted for any developed or
.modified software.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER ILSS
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
DEPOT MAINTENANCE ACTIVATION
PLANNING (DMAP)
B003 DEPOT MAINTENANCE STUDY
AFLCMC/WISL
DI-ILSS-80739/T 1.9.5.2.2
14. DISTRIBUTION
SD D BLK16 BLK16
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
16. REMARKS WISL 1 1
WISE(CM) 1 1
WR-ALC/GRUBB 1 1
.Para 10.3.8 - Appendix H. - Delete
AFMC/A4D 1 1
.Blk 9: See General Notes
.Blks 10, 12 & 13:
.a. Submit draft for approval 120 days after contract award.
.b. Submit final copy 30 days after Government approval of draft.
.c. Subsequent updates:
.(1) Due triannually, 60 days prior to each scheduled triannual
.Depot Maintenance Activation Working Group (DMAWG) meeting.
.(2) Shall continue until Depot stand-up/activation occurs, or
.upon termination notification from the Government, whichever
.occurs first.
15. TOTAL 4 4 0
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER ILSS
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
ISS DEPOT REPAIR B004 ICS SEE BLK 16
DI-ILSS-81226 1.9.5.3.1
14. DISTRIBUTION
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
16. REMARKS WISL 1 1
.Blk 2: INTERIM CONTRACTOR SUPPORT (ICS) PARTS USAGE AND WISE(CM) 1 1
.MAINTENANCE DATA COLLECTION REPORT
.Blk 12: First submission not later than sixty (60) days
.after DEPOT Repair Interim Contractor Support (ICS) period
.of performance begins.
.Blk 10 & 13: After initial submission, monthly thereafter.
.Final submission NLT 90 days after DEPOT period of performance
.ends.
15. TOTAL 2 2 0
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
xxx4 B TDP TM X OTHER
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B005 TECHNICAL MANUAL CONTRACT REQUIREMENTS (TMCR)
4. AUTHORITY(Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
TM-86-01N/T 1.6.1.1.1, 1.4.1.2.2
14. DISTRIBUTION
DD D BLK16 BLK16
8. APP CODE
A
11. AS OF DATE 13. Date of Subsequent
Submission: BLK16
Final
Draft Reg Repro
16. REMARKS WISL 1 1
.a. Develop, format and deliver Technical Manuals per TMCR
.86-01N. See Section J, Attachment 31.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012
Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER PACK
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
B006 SPECIAL PACKAGING INSTRUCTIONS (SPIs)
406 SCMS/GUMACB
DI-PACK-80121C/T 1.9.5.6
14. DISTRIBUTION
LT A ONE/R BLK16
A
11. AS OF DATE 13.Date of Subsequent
Submission R/ASR
Final
Draft Reg Repro
16. REMARKS SEE BLK 16 1 1
.BLK 4: DID is tailored as follows:
.a. SPI shall be developed for (1) Long lead or Spares WISL 1 1
.Acquisition Integrated with Production (SAIP) items; (2)
.non-stocklisted items which are SMR coded "P"; (3) ERRC "C", ."S", "T" or complex ERRC "N", "U", or "P" for which the
.packaging cannot be adequately prescribed with one line of
.supplemental data on DD Form 2326; and (4) has one of the
.following activity code designators: SJ, SU, SX, or TG.
.b. Order of consideration shall be IAW MIL-STD-2073-1D, Para 1, .Fig 1, and the procedural requirements of App E apply. If
.narrative or detailed drawing developed, DD Form 2169 shall be
.submitted along with completed DD Form 2326.
.c. SPI number for DD Form 2169 shall consist of the last nine
.numerical digits of the item's National Stock Number (NSN) and
.shall be specified on the DD Form 2326, Part D, blocks 28-36.
.Special markings are outlined in MIL-STD-2073-1D, App J.
.Electrostatic Discharge Sensitive (ESD) items and assemblies as
.defined by MIL-STD-1686C and hazardous materials per CFR 49
.shall be identified as such on all data supplied under this
.exhibit.
.BLK 7: The letter of transmittal shall list each National
.Stock Number (NSN) and shall specify if shipment is partial, .corrected, or final.
.BLKS 10, 12 & 13: Original submissions shall be a minimum of
.60 days prior to scheduled shipment date of each items for
.which this data is required. Approval of data shall be IAW
.MIL-STD-2073-1D, App E, and will be returned within 20 days of
.receipt. Data which is returned for correction or revision
.shall be resubmitted by the contractor for approval 30 days
.prior to shipment of material.
15. TOTAL 3 3 0
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 2 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER PACK
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
B006 SPECIAL PACKAGING INSTRUCTIONS (SPIs)
406 SCMS/GUMACB
DI-PACK-80121C/T 1.9.5.6
14. DISTRIBUTION
LT A ONE/R BLK16
A
11. AS OF DATE 13.Date of Subsequent
Submission R/ASR
Final
Draft Reg Repro
16. REMARKS
.BLK 14: Data shall be submitted in DD Form 2169 and DD Form
.2326 format electronically to sheila.moore@robins.af.mil or
.lorenda.martinez@robins.af.mil or in "hard copy" to the
.following address:
.406 SCMS/GUMACB
.ATTN: Sheila Moore
.460 RICHARD RAY BLVD, STE 200
.ROBINS AFB, GA 31098
.Note: The Prime Contractor shall flow down CDRL requirements
.to it's suppliers as the Prime Contractor deems appropriate.
15. TOTAL 3 3 0
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 2 of 2 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER QCIC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
SYSTEM ACCEPTANCE B007 ACCEPTANCE TEST PLAN
AFLCMC/WISV-TEST
DI-QCIC-80553A 1.3.5.6.1, 1.4.6.1, 1.4.6.2, 1.4.6.4
14. DISTRIBUTION
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
16. REMARKS WISV-TEST 1 1
.Blks 10, 12 & 13: Draft ATP due NLT 30 days prior to Training
.System PDR and 30 days prior to Training System CDR. Final due
.60 days prior to start of Force Development Evaluation (FDE) at
.contractor’s facility.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER IPSC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
AIR VEHICLE SPECIFICATION (AVS) B008 SYSTEM SUBSYSTEM SPECIFICATION (SSS)
AFLCMC/WISE
DI-IPSC-81431A/T 1.2.1.4
14. DISTRIBUTION
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
16. REMARKS WISE 1 1
.Contractor format is acceptable.
.Blks 10, 12 & 13:
.a. Preliminary draft of AVS shall be 30 days prior to SRR. Draft
.due 30 days prior to PDR. Final due 30 days after Government
.approval. Updates as required.
.b. Following approval of the AVS, any proposed changes shall be
.coordinated with the Government.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MISC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
AERODYNAMIC LOADS ANALYSIS B009 SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A/T 1.2.3.3
14. DISTRIBUTION
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.Blk 8: The Government will review, approve and/or disapprove
.with consolidated comments within 30 days after receipt. If
.disapproved, the contractor shall correct and resubmit within
.30 days after notification of comments.
.Blks 10, 12 & 13: The contractor shall submit draft report NLT
.30 days prior to the PDR. The final report shall be delivered
.IAW the Government approved IMS.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MISC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
MISSION PERFORMANCE ANALYSIS B010 SCIENTIFIC AND TECHNICAL REPORTS
14. DISTRIBUTION
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.30 days prior to PDR. Updates due at CDR. Final delivery due
.after flight test completion.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MISC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
FLIGHT DYNAMICS AND HANDLING
QUALITIES
B011 SCIENTIFIC AND TECHNICAL REPORTS
14. DISTRIBUTION
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.30 days prior to PDR. Updates due 30 days prior to CDR. Final
.delivery due after flight test completion.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MISC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
ENGINE CYCLE PERFORMANCE DECK B012 SCIENTIFIC AND TECHNICAL REPORTS
DI-MISC-80711A 1.2.3.4
14. DISTRIBUTION
A
11. AS OF DATE
BLK16
13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.Blk 9: See CDRL General Notes.
.30 days prior to PDR. Updates due at CDR. Final delivery due
.after flight test completion.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER HFAC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
OPERATOR B013 HUMAN ENGINEERING DESIGN APPROACH
DOCUMENT
DI-HFAC-80746B/T 1.2.6.2
14. DISTRIBUTION
N
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
16. REMARKS WISE 1
WISE(CM) 1
.a. Contractor Format is acceptable.
.b. Electronic media.
.c. Delete paragraphs: 3, 4a, and 4b.
.Blks 10, 12 & 13: Draft due 30 days prior to PDR and 30 days prior to CDR. Final due 45 days prior to Milestone C.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER HFAC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
MAINTAINER B014 HUMAN ENGINEERING DESIGN APPROACH
DOCUMENT
DI-HFAC-80747B/T 1.2.6.3
14. DISTRIBUTION
N
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.a. Contractor Format is acceptable.
.b. Electronic media.
.c. Delete paragraphs: 4a, 4b, 4c(1), 4g(a), 4g(b), and 4h.
.Blks 10, 12 & 13: Draft due 30 days prior to PDR and 30 days prior to CDR. Final due 45 days prior to Milestone C.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MGMT
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
WEIGHT AND BALANCE REPORTS AND
CHARTS
B015 WEIGHT AND BALANCE REPORT FOR AIRCRAFT
DI-MGMT-81501A/T 1.2.7
14. DISTRIBUTION
N
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.b. Prepare and deliver, per SAWE RP #7 Charts A and E or FAA
.equivalent if applicable.
.-Actual Weight report
.c. Prepare and deliver, per SAWE RP #7
.-Completed Weight and Balance Handbook per SAWE RP #7.
.Blks 10, 12 & 13: Actual weight report due 45 days after
.aircraft weighing. Completed Weight & Balance Handbook to be
.delivered with each aircraft.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MISC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
Blk 16 B016 TECHNICAL REPORT-STUDY/SERVICES
DI-MISC-80508B/T 1.2.8.3
14. DISTRIBUTION
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
16. REMARKS WISE 1
.Blk 3: Propulsion System Integrity Program (PSIP, Replacing WISE(CM) 1
.Engine Structural Integrity Program (ENSIP))
.b. Contractor shall develop and implement the program IAW
.MIL-STD-3024 and MIL-HDBK-1783.
.Blks 10, 12 & 13: Draft due 30 days prior to PDR. Update for
.approval due 30 days prior to CDR. Annual updates after approval.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MISC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
Blk 16 B017 TECHNICAL REPORT-STUDY/SERVICES
DI-MISC-80508B/T 1.2.8.4
14. DISTRIBUTION
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.Blk 3: Avionics Integrity Program (AVIP) Master Plan
.MIL-STD-1796A.
.c. Contractor shall use MIL-HDBK-87244 as a guide.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MISC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
Blk 16 B018 TECHNICAL REPORT-STUDY/SERVICES
DI-MISC-80508B/T 1.2.8.2
14. DISTRIBUTION
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.Blk 3: Mechanical Equipment and Subsystem Integrity Program
.(MECSIP) Master Plan
.MIL-STD-1798B.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MISC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
ASIP TECHNICAL REPORTS BLK 16 B019 TECHNICAL REPORT-STUDY/SERVICES
DI-MISC-80508B/T 1.2.8.1
14. DISTRIBUTION
BLK16
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.Blk 3: This CDRL includes six (6) Technical Reports for the
.Aircraft Structural Integrity Program (ASIP) as follows:
.1) ASIP Master Plan:
.b. Contractor shall use MIL-STD-1530C and DI-S-3570A as a guide
.to prepare the report.
.Blk 8: A
.Blks 10, 12 & 13: Draft due 30 days prio to PDR. Update for
.approval.
.2) Durability and Damage Tolerance Analysis Report:
.b. Contractor shall use DI-T-30722 and DI-T-30724 as a guide
.to prepare the report.
.Blks 10, 12 & 13: Draft due 30 days prior to CDR. Final
.due 30 days after Government approval. Annually thereafter, or
.whenever interface data changes, e.g., mission usage, .structural modifications or structural upgrades.
.3) Strength Summary and Operating Report:
.Blks 10, 12 & 13: Draft due 30 days prior to CDR. Final due 30
.days after Government approval. Annually thereafter, or
.whenever interface data changes, e.g., mission usage, .structural modifications or structural upgrades.
.4) Loads/Environmental Spectral Survey Report:
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 2 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MISC
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
ASIP TECHNICAL REPORTS Blk 16 B019 TECHNICAL REPORT-STUDY/SERVICES
DI-MISC-80508B/T 1.2.8.1
14. DISTRIBUTION
BLK16
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
16. REMARKS
.b. Contractor shall use DI-S-30583 as a guide to prepare the
.report.
.days after Government approval. Annually thereafter, or
.whenever interface data changes, e.g., mission usage, structural
.modifications or structural upgrades.
.5) Force Structural Maintenance Report:
.b. Contractor shall use DI-S-30583 as a guide to prepare the
.Blks 10, 12 & 13: Draft due 30 days prior to CDR.
.6) Individual Aircraft Tracking Report:
.b. Contractor shall use DI-T-30731 as a guide to prepare the
.days after Government approval. Annually thereafter.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 2 of 2 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER MFFP
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
B020 CORROSION PREVENTION AND CONTROL PLAN
DI-MFFP-81403/T 1.2.4.6
14. DISTRIBUTION
A
11. AS OF DATE 13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.Para. 7.1 and 10.3 change to read MIL-HDBK-1568
.Blks 10, 12 & 13: Draft plan shall be submitted 120 days after
.contract award. Final due 30 days after Government approval.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
XXX4 B TDP TM OTHER SESS
D. SYSTEM/ITEM
ROTARY WING BRANCH
E. CONTRACT/PR NO.
FA8629-12-R-2400
B021 AIRWORTHINESS SPECIFICATION
DI-SESS-81766/T 1.2.1.2
14. DISTRIBUTION
LT B BLK16 BLK16
A
11. AS OF DATE
BLK16
13.Date of Subsequent
Submission BLK16
Final
Draft Reg Repro
.Add to Para 3.3.a: "Other criteria from expanded MIL-HDBK-516B
.shall be added where, because of mission differences between
.the CRH and the baseline civil aircraft, airworthiness will not
.be adequately addressed by FAA type certification alone."
.Blk 11: First submitted shall be part of the contractor’s
Initial proposal.
.Blks 10, 12 & 13: Submit preliminary draft 30 days prior to
.SRR. Submit an update 45 days prior to PDR. The draft is due 30
.days after PDR. Final due 30 days after Government approval at
CDR. Once approved at CDR, subsequent submittals shall be iincluded as part of engineering change proposals (ECPs) through the SCN process.
Sandy Brankamp 7/12/2012 James D. Jeter, Lt Col, USAF 7/12/2012 Configuration/Data Manager CRH Program Manager
DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 pages
GROUP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .