CRH_Final_RFP_Industry_Q A_Matrix_17_Dec_12_Unsecure.pdf

PDF 65 KB Posted

Attached to
Combat Rescue Helicopter (CRH)
Solicitation number
FA8629-12-R-2400
Issued by

View the file

Other files

File Type Posted
RFP_Amd_0004_Signed.pdf PDF
Sec_M_-Eval_Factors_for_Award_MASTER_17_Dec.pdf PDF
Sec_L_Attachment_1_-_TEP_Workbook_14_Dec.xlsx XLSX spreadsheet
Amd_0002_SIGNED.pdf PDF
Sec_J _Attachment_3_-_SOW__14_Nov_12_(Master).pdf PDF
Sec_L_Attachment_1_-_TEP_Workbook_(14_Nov)_w_Adjustment.xlsx XLSX spreadsheet
Sec_L_-_Instructions_to_Offerors_MASTER_14_Nov.pdf PDF
Sec_M_-Eval_Factors_for_Award_MASTER_14_Nov.pdf PDF
CRH_Final_RFP_Industry_Q A_Matrix_-_16_Nov_12_Unsecure.pdf PDF
FA8629-12-R-2400-0001_Signed_Cover_Letter.pdf PDF
FA8629-12-R-2400-Amd0001.pdf PDF
CRH_Final_RFP_Industry_Q A_Matrix_30_Oct_12.pdf PDF
Sec_L _Attachment_2_-_CRH_Cross_Reference_Matrix_(CRM)_12OCT2012.pdf PDF
Sec_J _Attachment_31_-_TMCR_10_01_2012.pdf PDF
Sec_L _Attachment_13_-_Past_Performance_Client_Authorization_Ltr_20_Jul.pdf PDF
Sec_J _Attachment_17_-_RSP_Kit_Listing_-_19_Jun.pdf PDF
Sec_J _Attachment_20_-_CRH_IMP_02_Oct_12.pdf PDF
Sec_J _Attachment_7_-_VIQ_Matrix_19_Jun.pdf PDF
Sec_J _Attachment_5_-_AFMC_Form_158.pdf PDF
Sec_J _Attachment_13_-_Base_Support_Agreement_20_Jul.pdf PDF
Sec_J _Attachment_25_-_2794-Contract_Prime_LRIP_19_Jul.pdf PDF
Sec_J _Attachment_30_-_2794-Contract_RDT_FRP_19_Jul.pdf PDF
Sec_L _Attachment_10_-_PAST_PERFORMANCE_SAMPLE_CONSENT_LETTER.pdf PDF
Sec_J _Attachment_32_-_Listing_of_Licenses_for_CLIN_0006.pdf PDF
CRH_Offeror_RFP_Question_Format.xlsx XLSX spreadsheet
Sec_L _Attachment_14_-_DCMA_14_Point_SHA_Macro.pdf PDF
Sec_J _Attachment_10_-_SE_Mobility_Package_Kit_Listing_-_19_Jun.pdf PDF
Sec_L _Attachment_11_-_PAST_PERFORMANCE_SAMPLE_QUESTIONNAIRE_CORP_COVER_LTR_19JUL.pdf PDF
Sec_M_-Eval_Factors_for_Award_MASTER_21_Sep_Credit.pdf PDF
Sec_J _Attachment_21_-_Training_System_SE_Listing-_24_Aug.pdf PDF
Sec_J _Attachment_8_-_Restrictions_on_Technical_Data_and_Computer_Software_21_Jun.pdf PDF
Sec_J _Attachment_28_-_2794-Contract_Prime_FRP_19_Jul.pdf PDF
Sec_A_through_K_-_19_Oct.pdf PDF
Sec_L _Attachment_9_-_PAST_PERFORMANCE_QUESTIONNAIRE_TRACKING_RECORD.pdf PDF
Sec_J _Attachment_26_-_2794-Contract_Sub_LRIP_19_Jul.pdf PDF
Sec_L _Attachment_1_-_TEP_Workbook_(24_Sep)_w_Adjustment.xlsx XLSX spreadsheet
Sec_J _Attachment_12_-_CLIN_and_SOW_Matrix_9_Oct.pdf PDF
Sec_J _Attachment_6_-__LFTE_Assets_List_19_Jun_12.pdf PDF
Sec_L _Attachment_3_-_Past_Performance_Information_Tools_24_May_12.pdf PDF
Sec_J _Attachment_15_-_Aircraft_SE_Listing-_19_Jun.pdf PDF
CRH_RFP_Cover_Letter.pdf PDF
Sec_J _Attachment_27_-_2794-Contract_RDT_LRIP_19_Jul.pdf PDF
Sec_L _Attachment_12_-_PAST_PRESENT_PERFORMANCE_QUESTIONNAIRE-_1_Jun.pdf PDF
Sec_J _Attachment_16_-_Training_System_Spares_Listing-_24_Aug.pdf PDF
Sec_J _Exhibit_A_CDRL_Non-OMIT_07-12-2012rev928.pdf PDF
Sec_J _Attachment_24_-_2794-Contract_RDT_EMD_19_Jul.pdf PDF
Sec_J _Attachment_3_-_SOW__3_Oct_12_(Master).pdf PDF
Sec_J _Exhibit_B_CDRL_OMIT_07-12-2012rev1010.pdf PDF
Sec_L_-_Instructions_to_Offerors_MASTER_1_Oct_TEP_Credit.pdf PDF
Sec_J _Attachment_14_-_Aircraft_Spares_Listing_-_19_Jun.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Section If Section J, list

Attach or Exhibit Paragraph Page Question or Comment Answer or Resolution

J & L TEP VIQ Matrix 1-4

Within the TEP, the VIQ Matrix spread sheet has a column labeled TCOM. When contract cost and price is entered, the cell addresses for TCOM is printing with the pound/hash tag symbol. This is occurring because the column width is inadequate. The spread sheet is locked and does not permit changes. Request that the spread sheet be be modified to allow for a column expansion and consequently clear viewing of the data.

The TEP Workbook has been updated to widen the columns within the workbook. A updated TEP Workbook will be provided on FBO.

L

TEP-TPP

Worksheets

Following the Instruction of Section L and the TEP-TPP worksheets,

1. Estimate and Price ISS CLIN(s) as a total dollar amount

2. Using CLIN 0522 as an example, the CLIN is priced for a period of 12 months based on the support required for 8 A/C as stated in Annex E.

3. Using $240,000 as an example price, this amount is factored by 12 months and 8 A/C resulting in a per A/C per month Price of $2,500.

4. This amount is entered into the ISS Matrix within the TEP-TPP. It is then populated into the Production Acquisition work sheet.

The ISS Matrix and the Production Acquisition worksheet result in two different prices.

5. Section L instructs the offeror that the price in Volume III will be the same as in Volume VI.

6. Section B request a total ISS CLIN price and states that prices shall be proposed on a per A/C per month basis.

Please clarify how to follow the guidance in Section L and comply with the requirement that the Price in Volume VI, Section B matches the price in Volume III.

Section L is complied with by ensuring that the ISS CLIN prices included in Section B match the ISS CLIN prices listed in the ISS Matrix worksheet of the TEP workbook.

CRH Final RFP Industry Q&A Matrix 17 Dec 12 (Unsecure)

Final RFP Q&As

File details come from the government source that posted it. Updated .