View the file

Other files for this federal contract opportunity

Other files attached to CE Facility and Equipment Support to Intelligence and Research and Development Activities, newest first.
File Type Posted
Exhibit A - Price List Breakdown of Services by Customer —
Amendment 0006 - Signed Copy.pdf PDF
Vendor Q A 8 - 17 Jun 10.pdf PDF
Vendor Q A 7 - 17 Jun 10.pdf PDF
Exhibit D - Master WARPS Price List Qty Variation Worksheets by Lab - Revised 15 Jun 10.xls XLS spreadsheet
Atch 3 DBA WD OH100029 Mod 8 4 Jun 10.txt TXT text file
Amendment 0005 - Signed Copy.pdf PDF
Atch 4 - WARPS Equip Classification - Revised 15 Jun 10.pdf PDF
Vendor Q A 6 - 15 Jun 10.pdf PDF
Vendor Q A 5 - 13 Jun 10.pdf PDF
Exhibit D - Master WARPS Price List Qty Variation Worksheets by Lab - Revised 26 May 10.xls XLS spreadsheet
Amendment 0004 - Signed Copy.pdf PDF
Vendor Q A 3 - 1 June 2010.pdf PDF
Lab 6 - Gov't Provided Tools.pdf PDF
Lab 9 - Gov't Provided Tooling.pdf PDF
Vendor Q A 2.pdf PDF
Lab 7 - Gov't Provided Tools.xls XLS spreadsheet
Lab 3 - Gov't Provided Tools.xls XLS spreadsheet
Lab 8 - Gov't Provided Tools.pdf PDF
Exhibit B - Repair Replacement Labor Rates by Labor Category - Corrected 19 May 10.xls XLS spreadsheet
Atch 1 - Revised PWS - 21 May 10.pdf PDF
Exhibit D - Master WARPS Price List Qty Variation Worksheets by Lab - Revised 24 May 10.xls XLS spreadsheet
Amendment 0003 - Signed Copy.pdf PDF
Atch 5 WARPS Equip Class MAS Instructions - Revised 21 May 10.pdf PDF
Vendor Q A 1 - 21 May 10.pdf PDF
12 May 10 Site Visit Minutes with Atchs.pdf PDF
Amendment 0002 - Signed Copy.pdf PDF
Amendment 0001 - Signed Copy.pdf PDF
Exhibit A - Price List Breakdown of Services by Customer —
Atch 8 - Past Performance Questionnaire.doc DOC document
SF 33 - Request for Proposal 7 May 10.pdf PDF
Exhibit C - Parts Material List - 19 Mar 10.xls XLS spreadsheet
Atch 4 - WARPS Equip Classification.pdf PDF
Atch 7 - WPAFB_BFS_Compiled_2009-11-25.pdf PDF
Exhibit D - Master WARPS Price List Qty Variation Worksheets by Lab.xls XLS spreadsheet
Atch 2 - SCA Wage Determination 2005-2419 Rev 9 14 Aug 09.txt TXT text file
Atch 1 - PWS - 26 Feb 10.pdf PDF
Atch 6 - Master Equip List by Lab - 9 Feb 10 - Protected.xls XLS spreadsheet
Atch 5 - WARPS Equip Classification Maintenance Action Sheets.pdf PDF
Exhibit B - Repair Replacement Labor Rates by Labor Category.xls XLS spreadsheet
Atch 3 - DBA General Decision OH100029 30 Apr 10.txt TXT text file
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8601-10-R-0038

CE FACILITY AND EQUIPMENT SUPPORT TO INTELLIGENCE AND

RESEARCH AND DEVELOPMENT ACTIVITIES

Vendor Questions and Responses #4 10 June 2010

1. Can the contractor assume that none of the hours to be priced in Exhibit B “Repair replacement Labor Rates by Labor Category” have been anticipated to cover any portions of PWS Sections 1.8.2.6 and 1.8.2.7, as noted below, where the contractor is required to have a supervisory person in each lab and an administrative person in each lab to perform administrative duties and free the supervisor up to manage his/her work force. Where should the contractor price these personnel?

1.8.2.6. The contractor shall provide personnel at each of these five field locations to distribute workload, act as the point of contact for the QAPs regarding questions and information on the status of work, convey information to the QAPs regarding observed equipment condition that may impact long range user planning. The contractor personnel shall also oversee all work within the field office pertaining but not limited to, the maintenance of commercial or industrial electrical, heating, ventilation, and air conditioning equipment and user’s equipment as shown on the Equipment List.

1.8.2.7. The contractor shall provide personnel at each of these five field locations to perform all administrative-type duties within the field office such as, but not limited to, answering the telephone, maintaining inventories, maintain IAP paperwork, initiating material requests, allowing the supervisor to manage his/her work force and oversee on-going work activities

INITIAL RESPONSE: This appears to be a duplication of a question previously submitted. Reference question #39 on the Vendor Q&As #1 posted to FedBizOps on 21 May 2010. If you’re asking something different, please advise.

Vendor Clarification of Question #1: It is similar but we want to verify if any part of that effort {e.g.

hours for the supervisor and admin support personnel in each lab} should or could be covered by any of the hours referenced on Exhibit B.

CLARIFICATION RESPONSE: The estimated hours in Exhibit B for the T&M work do not include hours for the supervisor and admin support for each lab. As stated in the response to question #39 on the Vendor Q&A #1, it is a business decision on the part of the contractor where to include the costs associated with these positions.

File details come from the government source that posted it. Updated .