DRAFT_Noise_Suppressor_Pricing_Exhibits.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- Noise Suppressor Sustainment Federal contract opportunity
- Solicitation number
- FA8534-17-R-0007
About this file
This Excel file contains pricing exhibits for standard and unique repair contract line item numbers (CLINs) to support the sustainment of various noise suppressor systems. The CLINs cover repairs for A-18, T-4, T-9, T-10, T-11, and T-12 noise suppressors across multiple fiscal years, both within and outside the continental United States. Standard repairs include tasks such as collector assembly modification, exhaust stack repack, roll up door replacement, heating and air conditioning unit replacement, and fire suppression system inspections. Unique repair CLINs allow for the evaluation, statement of work development, and performance of non-standard repairs. Additional CLINs involve the delivery of technical data such as engineering change proposals, product drawings, safety plans, and status reports to fulfill contractual data requirements.
DRAFT Pricing Exhibits
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD REPAIR CLINs
| Exhibit A (CLIN X001) A-18 STANDARD REPAIR NSN 4920-00-431-4246 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| A01 | 4.4.1.44 | Technical Orders Conversion | |||||||||
| A02 | 4.4.3 | Test Procedures and Report | |||||||||
| A03 | 4.4.4 | Foreign Object Debris | |||||||||
| A04 | 4.4.5 | Final Report |
| Exhibit B (CLIN X002) T-04 STANDARD REPAIR NSN 4920-00-005-8502 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| B01 | 4.4.1.44 | Technical Orders Conversion | |||||||||
| B02 | 4.4.3 | Test Procedures and Report | |||||||||
| B03 | 4.4.4 | Foreign Object Debris | |||||||||
| B04 | 4.4.5 | Final Report |
| Exhibit C (CLIN X003) T-9 STANDARD REPAIR (CONUS) NSN 4920-01-082-1095 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| C01 | 4.4.1.13 | Collector Assembly Modification w/Repack | |||||||||
| C02 | 4.4.1.14 | Exhaust Stack Repack | |||||||||
| C03 | 4.4.1.15 | Roll Up Doors Replacement | |||||||||
| C04 | 4.4.1.16 | Exhaust Roll-up Door Replacement | |||||||||
| C05 | 4.4.1.17 | Primary Air Intake Roll-up Door Replacement | |||||||||
| C06 | 4.4.1.18 | Engine Access Roll-up Door Replacement | |||||||||
| C07 | 4.4.1.19 | Splitter Door Assembly Refurbishment | |||||||||
| C08 | 4.4.1.20 | Single Personnel Door Refurbishment | |||||||||
| C09 | 4.4.1.21 | Heating,Ventilation, and A/C Uint Replacement | |||||||||
| C10 | 4.4.1.26 | Bird Screen Replacement | |||||||||
| C11 | 4.4.1.27 | Fuel System Replacement | |||||||||
| C12 | 4.4.1.28 | Compresser Air System Replacement | |||||||||
| C13 | 4.4.1.29 | Hoist Replacement | |||||||||
| C14 | 4.4.1.31 | Lighting Protection System Installation | |||||||||
| C15 | 4.4.1.34 | FSS-Fire Suppression System Actuation System | |||||||||
| C16 | 4.4.1.37 | Pnematic FSS Testing on Noise Suppression Systems | |||||||||
| C17 | 4.4.1.38.1 | Pnematic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| C18 | 4.4.1.38.2 | Pneumatic or Electrical FSS Additional Halon /NOVEC Bottle Removal | |||||||||
| C19 | 4.4.1.39 | FSS Hose Inspection | |||||||||
| C20 | 4.4.1.40 | Halon /Novec Bottle Site Installation | |||||||||
| C21 | 4.4.1.41.1 | Halon Bottle Valve Rebuild | |||||||||
| C22 | 4.4.1.43.1 | Bottle Discharge Investigation | |||||||||
| C23 | 4.4.1.43.2 | FSS Inspection | |||||||||
| C24 | 4.4.1.43.3 | Bottle Content Determination | |||||||||
| C25 | 4.4.1.43.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| C26 | 4.4.1.43.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| C27 | 4.4.1.44 | Technical Orders Conversion | |||||||||
| C28 | 4.4.3 | Test Procedures and Report | |||||||||
| C29 | 4.4.4 | Foreign Object Debris | |||||||||
| C30 | 4.4.5 | Final Report |
| Exhibit D (CLIN X004) T-9 STANDARD REPAIR (OCONUS) NSN 4920-01-082-1095 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| D01 | 4.4.1.13 | Collector Assembly Modification w/Repack | |||||||||
| D02 | 4.4.1.14 | Exhaust Stack Repack | |||||||||
| D03 | 4.4.1.15 | Roll Up Doors Replacement | |||||||||
| D04 | 4.4.1.16 | Exhaust Roll-up Door Replacement | |||||||||
| D05 | 4.4.1.17 | Primary Air Intake Roll-up Door Replacement | |||||||||
| D06 | 4.4.1.18 | Engine Access Roll-up Door Replacement | |||||||||
| D07 | 4.4.1.19 | Splitter Door Assembly Refurbishment | |||||||||
| D08 | 4.4.1.20 | Single Personnel Door Refurbishment | |||||||||
| D09 | 4.4.1.21 | Heating,Ventilation, and A/C Uint Replacement | |||||||||
| D10 | 4.4.1.26 | Bird Screen Replacement | |||||||||
| D11 | 4.4.1.27 | Fuel System Replacement | |||||||||
| D12 | 4.4.1.28 | Compresser Air System Replacement | |||||||||
| D13 | 4.4.1.29 | Hoist Replacement | |||||||||
| D14 | 4.4.1.31 | Lighting Protection System Installation | |||||||||
| D15 | 4.4.1.34 | FSS-Fire Suppression System Actuation System | |||||||||
| D16 | 4.4.1.37 | Pnematic FSS Testing on Noise Suppression Systems | |||||||||
| D17 | 4.4.1.38.1 | Pnematic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| D18 | 4.4.1.38.2 | Pneumatic or Electrical FSS Additional Halon /NOVEC Bottle Removal | |||||||||
| D19 | 4.4.1.39 | FSS Hose Inspection | |||||||||
| D20 | 4.4.1.40 | Halon /Novec Bottle Site Installation | |||||||||
| D21 | 4.4.1.41.1 | Halon Bottle Valve Rebuild | |||||||||
| D22 | 4.4.1.43.1 | Bottle Discharge Investigation | |||||||||
| D23 | 4.4.1.43.2 | FSS Inspection | |||||||||
| D24 | 4.4.1.43.3 | Bottle Content Determination | |||||||||
| D25 | 4.4.1.43.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| D26 | 4.4.1.43.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| D27 | 4.4.1.44 | Technical Orders Conversion | |||||||||
| D28 | 4.4.3 | Test Procedures and Report | |||||||||
| D29 | 4.4.4 | Foreign Object Debris | |||||||||
| D30 | 4.4.5 | Final Report |
| Exhibit E (CLIN X005) T-10 STANDARD REPAIR (CONUS) NSN 4920-01-127-4640 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| E01 | 4.4.1.1 | Main Door Refurbishment | |||||||||
| E02 | 4.4.1.2 | Main Door Track Replacement | |||||||||
| E03 | 4.4.1.3 | Main Door Track Heating System | |||||||||
| E04 | 4.4.1.4 | Main Door Gearbox Heater | |||||||||
| E05 | 4.4.1.5 | Bay Lighting Refurbishment | |||||||||
| E06 | 4.4.1.6 | Turning vanes Refurbishment | |||||||||
| E07 | 4.4.1.7 | Close Circuit Television (CCTV) | |||||||||
| E08 | 4.4.1.8 | Control Room Window Reburbishment | |||||||||
| E09 | 4.4.1.9 | Deflector Attachment Modification | |||||||||
| E10 | 4.4.1.10 | Roll Up Doors Replacement | |||||||||
| E11 | 4.4.1.11 | Intake Roll-up Door Replacement | |||||||||
| E12 | 4.4.1.12 | Exhaust Roll-up Door Replacement | |||||||||
| E13 | 4.4.1.20 | Single Personnel Door Refurbishment | |||||||||
| E14 | 4.4.1.21 | Heating,Ventilation, and A/C Uint Replacement | |||||||||
| E15 | 4.4.1.22 | Roof Repair / CONUS - OCONUS | |||||||||
| E16 | 4.4.1.23 | Roof Replacement / CONUS / OCONUS | |||||||||
| E17 | 4.4.1.24 | Northern Tier Roof Extensions /CONUS /OCONUS | |||||||||
| E18 | 4.4.1.25 | Bird Screen, Gutter, Downspouts Replacement | |||||||||
| E19 | 4.4.1.30 | Grout Replacement | |||||||||
| E20 | 4.4.1.31 | Lighting Protection System Installation | |||||||||
| E21 | 4.4.1.32 | Deadman & Mounting Block Pull Test | |||||||||
| E22 | 4.4.1.33 | Novec FSS Upgrade | |||||||||
| E23 | 4.4.1.34 | FSS-Fire Suppression System Actuation System | |||||||||
| E24 | 4.4.1.35.1 | FSS-Actuation Station Removal -T-20 Test Cab | |||||||||
| E25 | 4.4.1.35.2 | FSS-Actuation Station Relocation & Installation T-20 Test Cab | |||||||||
| E26 | 4.4.1.36 | FSS-Pull Handle Installation | |||||||||
| E27 | 4.4.1.37 | Pnematic FSS Testing on Noise Suppression Systems | |||||||||
| E28 | 4.4.1.38.1 | Pnematic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| E29 | 4.4.1.38.2 | Pneumatic or Electrical FSS Additional Halon /NOVEC Bottle Removal | |||||||||
| E30 | 4.4.1.39 | FSS Hose Inspection | |||||||||
| E31 | 4.4.1.40 | Halon /Novec Bottle Site Installation | |||||||||
| E32 | 4.4.1.41.2 | Halon Bottle Valve Rebuild | |||||||||
| E33 | 4.4.1.41.3 | Novec Bottle Valve Rebuild | |||||||||
| E34 | 4.4.1.42.1 | Bottle Refurbishment | |||||||||
| E35 | 4.4.1.43.1 | Bottle Discharge Investigation | |||||||||
| E36 | 4.4.1.43.2 | FSS Inspection | |||||||||
| E37 | 4.4.1.43.3 | Bottle Content Determination | |||||||||
| E38 | 4.4.1.43.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| E39 | 4.4.1.43.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| E40 | 4.4.1.44 | Technical Orders Conversion | |||||||||
| E41 | 4.4.3 | Test Procedures and Report | |||||||||
| E42 | 4.4.4 | Foreign Object Debris | |||||||||
| E43 | 4.4.5 | Final Report |
| Exhibit F (CLIN X006) T-10 STANDARD REPAIR (OCONUS) NSN 4920-01-127-4640 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| F01 | 4.4.1.1 | Main Door Refurbishment | |||||||||
| F02 | 4.4.1.2 | Main Door Track Replacement | |||||||||
| F03 | 4.4.1.3 | Main Door Track Heating System | |||||||||
| F04 | 4.4.1.4 | Main Door Gearbox Heater | |||||||||
| F05 | 4.4.1.5 | Bay Lighting Refurbishment | |||||||||
| F06 | 4.4.1.6 | Turning vanes Refurbishment | |||||||||
| F07 | 4.4.1.7 | Close Circuit Television (CCTV) | |||||||||
| F08 | 4.4.1.8 | Control Room Window Reburbishment | |||||||||
| F09 | 4.4.1.9 | Deflector Attachment Modification | |||||||||
| F10 | 4.4.1.10 | Roll Up Doors Replacement | |||||||||
| F11 | 4.4.1.11 | Intake Roll-up Door Replacement | |||||||||
| F12 | 4.4.1.12 | Exhaust Roll-up Door Replacement | |||||||||
| F13 | 4.4.1.20 | Single Personnel Door Refurbishment | |||||||||
| F14 | 4.4.1.21 | Heating,Ventilation, and A/C Uint Replacement | |||||||||
| F15 | 4.4.1.22 | Roof Repair / CONUS - OCONUS | |||||||||
| F16 | 4.4.1.23 | Roof Replacement / CONUS / OCONUS | |||||||||
| F17 | 4.4.1.24 | Northern Tier Roof Extensions /CONUS /OCONUS | |||||||||
| F18 | 4.4.1.25 | Bird Screen, Gutter, Downspouts Replacement | |||||||||
| F19 | 4.4.1.30 | Grout Replacement | |||||||||
| F20 | 4.4.1.31 | Lighting Protection System Installation | |||||||||
| F21 | 4.4.1.32 | Deadman & Mounting Block Pull Test | |||||||||
| F22 | 4.4.1.33 | Novec FSS Upgrade | |||||||||
| F23 | 4.4.1.34 | FSS-Fire Suppression System Actuation System | |||||||||
| F24 | 4.4.1.35.1 | FSS-Actuation Station Removal -T-20 Test Cab | |||||||||
| F25 | 4.4.1.35.2 | FSS-Actuation Station Relocation & Installation T-20 Test Cab | |||||||||
| F26 | 4.4.1.36 | FSS-Pull Handle Installation | |||||||||
| F27 | 4.4.1.37 | Pnematic FSS Testing on Noise Suppression Systems | |||||||||
| F28 | 4.4.1.38.1 | Pnematic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| F29 | 4.4.1.38.2 | Pneumatic or Electrical FSS Additional Halon /NOVEC Bottle Removal | |||||||||
| F30 | 4.4.1.39 | FSS Hose Inspection | |||||||||
| F31 | 4.4.1.40 | Halon /Novec Bottle Site Installation | |||||||||
| F32 | 4.4.1.41.2 | Halon Bottle Valve Rebuild | |||||||||
| F33 | 4.4.1.41.3 | Novec Bottle Valve Rebuild | |||||||||
| F34 | 4.4.1.42.1 | Bottle Refurbishment | |||||||||
| F35 | 4.4.1.43.1 | Bottle Discharge Investigation | |||||||||
| F36 | 4.4.1.43.2 | FSS Inspection | |||||||||
| F37 | 4.4.1.43.3 | Bottle Content Determination | |||||||||
| F38 | 4.4.1.43.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| F39 | 4.4.1.43.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| F40 | 4.4.1.44 | Technical Orders Conversion | |||||||||
| F41 | 4.4.3 | Test Procedures and Report | |||||||||
| F42 | 4.4.4 | Foreign Object Debris | |||||||||
| F43 | 4.4.5 | Final Report |
| Exhibit G (CLIN X007) T-11 STANDARD REPAIR NSN 4920-01-070-2721 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| G01 | 4.4.1.13 | Collector Assembly Modification w/Repack | |||||||||
| G02 | 4.4.1.14 | Exhaust Stack Repack | |||||||||
| G03 | 4.4.1.15 | Roll Up Doors Replacement | |||||||||
| G04 | 4.4.1.16 | Exhaust Roll-up Door Replacement | |||||||||
| G05 | 4.4.1.17 | Primary Air Intake Roll-up Door Replacement | |||||||||
| G06 | 4.4.1.18 | Engine Access Roll-up Door Replacement | |||||||||
| G07 | 4.4.1.19 | Splitter Door Assembly Refurbishment | |||||||||
| G08 | 4.4.1.20 | Single Personnel Door Refurbishment | |||||||||
| G09 | 4.4.1.21 | Heating,Ventilation, and A/C Uint Replacement | |||||||||
| G10 | 4.4.1.26 | Bird Screen Replacement | |||||||||
| G11 | 4.4.1.27 | Fuel System Replacement | |||||||||
| G12 | 4.4.1.28 | Compresser Air System Replacement | |||||||||
| G13 | 4.4.1.29 | Hoist Replacement | |||||||||
| G14 | 4.4.1.31 | Lighting Protection System Installation | |||||||||
| G15 | 4.4.1.34 | FSS-Fire Suppression System Actuation System | |||||||||
| G16 | 4.4.1.37 | Pnematic FSS Testing on Noise Suppression Systems | |||||||||
| G17 | 4.4.1.38.1 | Pnematic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| G18 | 4.4.1.38.2 | Pneumatic or Electrical FSS Additional Halon /NOVEC Bottle Removal | |||||||||
| G19 | 4.4.1.39 | FSS Hose Inspection | |||||||||
| G20 | 4.4.1.40 | Halon /Novec Bottle Site Installation | |||||||||
| G21 | 4.4.1.41.1 | Halon Bottle Valve Rebuild | |||||||||
| G22 | 4.4.1.43.1 | Bottle Discharge Investigation | |||||||||
| G23 | 4.4.1.43.2 | FSS Inspection | |||||||||
| G24 | 4.4.1.43.3 | Bottle Content Determination | |||||||||
| G25 | 4.4.1.43.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| G26 | 4.4.1.43.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| G27 | 4.4.1.44 | Technical Orders Conversion | |||||||||
| G28 | 4.4.3 | Test Procedures and Report | |||||||||
| G29 | 4.4.4 | Foreign Object Debris | |||||||||
| G30 | 4.4.5 | Final Report |
| Exhibit H (CLIN X008) T-12 STANDARD REPAIR NSN 4920-01-286-8681 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| H01 | 4.4.1.1 | Main Door Refurbishment | |||||||||
| H02 | 4.4.1.21 | Heating,Ventilation, and A/C Uint Replacement | |||||||||
| H03 | 4.4.1.37 | Pnematic FSS Testing on Noise Suppression Systems | |||||||||
| H04 | 4.4.1.38.1 | Pnematic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| H05 | 4.4.1.38.2 | Pneumatic or Electrical FSS Additional Halon /NOVEC Bottle Removal | |||||||||
| H06 | 4.4.1.39 | FSS Hose Inspection | |||||||||
| H07 | 4.4.1.40 | Halon /Novec Bottle Site Installation | |||||||||
| H08 | 4.4.1.41.4 | Halon Bottle Valve Rebuild | |||||||||
| H09 | 4.4.1.43.1 | Bottle Discharge Investigation | |||||||||
| H10 | 4.4.1.43.2 | FSS Inspection | |||||||||
| H11 | 4.4.1.43.3 | Bottle Content Determination | |||||||||
| H12 | 4.4.1.43.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| H13 | 4.4.1.43.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| H14 | 4.4.1.44 | Technical Orders Conversion | |||||||||
| H15 | 4.4.3 | Test Procedures and Report | |||||||||
| H16 | 4.4.4 | Foreign Object Debris | |||||||||
| H17 | 4.4.5 | Final Report |
| Exhibit J (CLIN X009) A-18 UNIQUE REPAIR NSN 4920-00-431-4246 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| J01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| J02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit K (CLIN X010) T-04 UNIQUE REPAIR NSN 4920-00-005-8502 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| K01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| K02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit L (CLIN X011) T-09 UNIQUE REPAIR (CONUS) NSN 4920-01-082-1095 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| L01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| L02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit M (CLIN X012) T-09 UNIQUE REPAIR (OCONUS) NSN 4920-01-082-1095 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| M01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| M02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit N (CLIN X013) T-10 UNIQUE REPAIR (CONUS) NSN 4920-01-127-4640 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| N01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| N02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit P (CLIN X014) T-10 UNIQUE REPAIR (OCONUS) NSN 4920-01-127-4640 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| P01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| P02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit Q (CLIN X015) T-11 UNIQUE REPAIR NSN 4920-01-070-2721 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| Q01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| Q02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit R (CLIN X016) T-12 UNIQUE REPAIR NSN 4920-01-286-8681 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| R01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| R02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit S (CLIN X017) T-56 UNIQUE REPAIR NSN 4920-01-590-2905 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| S01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| S02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit T (CLIN X019) DATA | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| T01 | 4.6 | CDRL A001, DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAVAF)/Government Furnished Material Report | |||||||||
| T02 | 4.4.1.30, 4.4.16 | CDRL A002, DI-MGMT-80368A, Status Report | |||||||||
| T03 | 4.4.2.3 | CDRL A003, DI-ILSS-80386, Repairable Item Inspection Report | |||||||||
| T04 | 4.4.2.4 | CDRL A004, DI-MGMT-81606, Statement of Work | |||||||||
| T05 | 4.4.3 | CDRL A005, DI-NDTI-80603A, Test Procedure; | |||||||||
| T06 | 4.4.1.34.4, 4.4.3 | CDRL A006, DI-NDTI-80809B, Test/Inspection Report | |||||||||
| T07 | 4.4.5 | CDRL A007, DI-ADMN-80447A, Contract Summary Report | |||||||||
| T08 | 4.4.6 | CDRL A008, DI-MGMT-80368A, Status Report | |||||||||
| T09 | 4.4.10 | CDRL A009, DI-SESS-80639D, Engineering Change Proposal (ECP | |||||||||
| T10 | 4.4.11 | CDRL A010, DI-SESS-80642, Notice of Revision (NOR) | |||||||||
| T11 | 4.4.12 | CDRL A011, DI-SESS-81000E/T, Product Drawings/Models and Associated Lists | |||||||||
| T12 | 4.4.12.1, 4.4.12.2, 4.4.19, | CDRL A012, DI-ADMN-81249A, Conference Agenda | |||||||||
| T13 | 4.4.12.1, 4.4.12.2, 4.4.20 | CDRL A013, DI-ADMN-81250A, Conference Minutes | |||||||||
| T14 | 4.4.13 | CDRL A014, TM-86-01P, Technical Manual Contract Requirement | |||||||||
| T15 | 4.4.21 | CDRL A015, DI-MGMT-81650, Integrated Master Schedule | |||||||||
| T16 | 4.8 | CDRL A016, DI-QCIC-80125B, Alert/Safe Alert | |||||||||
| T17 | 4.8 | CDRL A017, DI-QCIC-80126B, Response to an Alert/Safe Alert | |||||||||
| T18 | 5.5.2.1 | CDRL A018, DI-SAFT-81563, Accident/Incident Report | |||||||||
| T19 | 5.5.2.3 | CDRL A019, DI-ENVR-81375, Environmental Health and Safety Plan |
UNIQUE REPAIR CLINs
| Exhibit J (CLIN X009) A-18 UNIQUE REPAIR NSN 4920-00-431-4246 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| J01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| J02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit K (CLIN X010) T-04 UNIQUE REPAIR NSN 4920-00-005-8502 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| K01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| K02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit L (CLIN X011) T-09 UNIQUE REPAIR (CONUS) NSN 4920-01-082-1095 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| L01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| L02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit M (CLIN X012) T-09 UNIQUE REPAIR (OCONUS) NSN 4920-01-082-1095 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| M01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| M02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit N (CLIN X013) T-10 UNIQUE REPAIR (CONUS) NSN 4920-01-127-4640 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| N01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| N02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit P (CLIN X014) T-10 UNIQUE REPAIR (OCONUS) NSN 4920-01-127-4640 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| P01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| P02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit Q (CLIN X015) T-11 UNIQUE REPAIR NSN 4920-01-070-2721 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| Q01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| Q02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit R (CLIN X016) T-12 UNIQUE REPAIR NSN 4920-01-286-8681 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| R01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| R02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit S (CLIN X017) T-56 UNIQUE REPAIR NSN 4920-01-590-2905 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| S01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| S02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit T (CLIN X019) DATA | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| T01 | 4.6 | CDRL A001, DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAVAF)/Government Furnished Material Report | |||||||||
| T02 | 4.4.1.30, 4.4.16 | CDRL A002, DI-MGMT-80368A, Status Report | |||||||||
| T03 | 4.4.2.3 | CDRL A003, DI-ILSS-80386, Repairable Item Inspection Report | |||||||||
| T04 | 4.4.2.4 | CDRL A004, DI-MGMT-81606, Statement of Work | |||||||||
| T05 | 4.4.3 | CDRL A005, DI-NDTI-80603A, Test Procedure; | |||||||||
| T06 | 4.4.1.34.4, 4.4.3 | CDRL A006, DI-NDTI-80809B, Test/Inspection Report | |||||||||
| T07 | 4.4.5 | CDRL A007, DI-ADMN-80447A, Contract Summary Report | |||||||||
| T08 | 4.4.6 | CDRL A008, DI-MGMT-80368A, Status Report | |||||||||
| T09 | 4.4.10 | CDRL A009, DI-SESS-80639D, Engineering Change Proposal (ECP | |||||||||
| T10 | 4.4.11 | CDRL A010, DI-SESS-80642, Notice of Revision (NOR) | |||||||||
| T11 | 4.4.12 | CDRL A011, DI-SESS-81000E/T, Product Drawings/Models and Associated Lists | |||||||||
| T12 | 4.4.12.1, 4.4.12.2, 4.4.19, | CDRL A012, DI-ADMN-81249A, Conference Agenda | |||||||||
| T13 | 4.4.12.1, 4.4.12.2, 4.4.20 | CDRL A013, DI-ADMN-81250A, Conference Minutes | |||||||||
| T14 | 4.4.13 | CDRL A014, TM-86-01P, Technical Manual Contract Requirement | |||||||||
| T15 | 4.4.21 | CDRL A015, DI-MGMT-81650, Integrated Master Schedule | |||||||||
| T16 | 4.8 | CDRL A016, DI-QCIC-80125B, Alert/Safe Alert | |||||||||
| T17 | 4.8 | CDRL A017, DI-QCIC-80126B, Response to an Alert/Safe Alert | |||||||||
| T18 | 5.5.2.1 | CDRL A018, DI-SAFT-81563, Accident/Incident Report | |||||||||
| T19 | 5.5.2.3 | CDRL A019, DI-ENVR-81375, Environmental Health and Safety Plan |
File details come from the government source that posted it. Updated .