Attachment_1,_Pricing_Exhibits.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- Noise Suppressor Sustainment Federal contract opportunity
- Solicitation number
- FA8534-17-R-0007
About this file
This document contains pricing exhibits for a federal contract solicitation for noise suppressor sustainment services. The solicitation seeks the repair and installation of fire suppression systems for various aircraft engines, as well as the delivery of technical orders and data packages to the government. Services include repairs and maintenance for A-18, T-4, T-9, T-10, T-11, and T-12 aircraft engines. The pricing exhibits provide estimated costs for standard and unique repair tasks for the contract basic ordering period and multiple option years. Deliverables include status reports, inspection reports, statements of work, test procedures, and other technical data as required by the Contract Data Requirements List. The Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base is the contracting agency.
Attachment
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD REPAIR CLINs
| Exhibit A (CLIN X001) A-18 STANDARD REPAIR NSN 4920-00-431-4246 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| A01 | 4.4.1.35 | Technical Orders Conversion | |||||||||
| A02 | 4.4.3 | Test Procedures and Report | |||||||||
| A03 | 4.4.4 | Foreign Object Debris Inspection | |||||||||
| A04 | 4.4.5 | Final Report |
| Exhibit B (CLIN X002) T-04 STANDARD REPAIR NSN 4920-00-005-8502 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| B01 | 4.4.1.35 | Technical Orders Conversion | |||||||||
| B02 | 4.4.3 | Test Procedures and Report | |||||||||
| B03 | 4.4.4 | Foreign Object Debris Inspection | |||||||||
| B04 | 4.4.5 | Final Report |
| Exhibit C (CLIN X003) T-9 STANDARD REPAIR (CONUS) NSN 4920-01-082-1095 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| C01 | 4.4.1.13 | Roll Up Doors Replacement | |||||||||
| C02 | 4.4.1.14 | Exhaust Roll-up Door Replacement | |||||||||
| C03 | 4.4.1.15 | Primary Air Intake Roll-up Door Replacement | |||||||||
| C04 | 4.4.1.16 | Engine Access Roll-up Door Replacement | |||||||||
| C05 | 4.4.1.17 | Splitter Door Assembly Refurbishment | |||||||||
| C06 | 4.4.1.18 | Single Personnel Door Refurbishment | |||||||||
| C07 | 4.4.1.19 | Heating,Ventilation, and A/C Unit Replacement | |||||||||
| C08 | 4.4.1.28 | Pnematic FSS Testing on Noise Suppression Systems | |||||||||
| C09 | 4.4.1.29.1 | Pnematic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| C10 | 4.4.1.29.2 | Pneumatic or Electrical FSS Additional Halon /NOVEC Bottle Removal | |||||||||
| C11 | 4.4.1.30 | FSS Hose Inspection | |||||||||
| C12 | 4.4.1.31 | Halon /Novec Bottle Site Installation | |||||||||
| C13 | 4.4.1.32 | Halon/Novec Bottle Valve Rebuild | |||||||||
| C14 | 4.4.1.33 | Bottle Refurbishment | |||||||||
| C15 | 4.4.1.34.1 | Bottle Discharge Investigation | |||||||||
| C16 | 4.4.1.34.2 | FSS Inspection | |||||||||
| C17 | 4.4.1.34.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| C18 | 4.4.1.34.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| C19 | 4.4.1.35 | Technical Orders Conversion | |||||||||
| C20 | 4.4.3 | Test Procedures and Report | |||||||||
| C21 | 4.4.4 | Foreign Object Debris Inspection | |||||||||
| C22 | 4.4.5 | Final Report |
| Exhibit D (CLIN X004) T-9 STANDARD REPAIR (OCONUS) NSN 4920-01-082-1095 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| D01 | 4.4.1.13 | Roll Up Doors Replacement | |||||||||
| D02 | 4.4.1.14 | Exhaust Roll-up Door Replacement | |||||||||
| D03 | 4.4.1.15 | Primary Air Intake Roll-up Door Replacement | |||||||||
| D04 | 4.4.1.16 | Engine Access Roll-up Door Replacement | |||||||||
| D05 | 4.4.1.17 | Splitter Door Assembly Refurbishment | |||||||||
| D06 | 4.4.1.18 | Single Personnel Door Refurbishment | |||||||||
| D07 | 4.4.1.19 | Heating,Ventilation, and A/C Unit Replacement | |||||||||
| D08 | 4.4.1.28 | Pnematic FSS Testing on Noise Suppression Systems | |||||||||
| D09 | 4.4.1.30 | FSS Hose Inspection | |||||||||
| D10 | 4.4.1.34.2 | FSS Inspection | |||||||||
| D11 | 4.4.3 | Test Procedures and Report | |||||||||
| D12 | 4.4.4 | Foreign Object Debris Inspection | |||||||||
| D13 | 4.4.5 | Final Report |
| Exhibit E (CLIN X005) T-10 STANDARD REPAIR (CONUS) NSN 4920-01-127-4640 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| E01 | 4.4.1.1 | Main Door Refurbishment | |||||||||
| E02 | 4.4.1.2 | Main Door Track Replacement | |||||||||
| E03 | 4.4.1.3 | Main Door Track Heating System | |||||||||
| E04 | 4.4.1.4 | Main Door Gearbox Heater | |||||||||
| E05 | 4.4.1.5 | Bay Lighting Refurbishment | |||||||||
| E06 | 4.4.1.6 | Turning vanes Refurbishment | |||||||||
| E07 | 4.4.1.7 | Close Circuit Television (CCTV) | |||||||||
| E08 | 4.4.1.8 | Control Room Window Reburbishment | |||||||||
| E09 | 4.4.1.9 | Deflector Attachment Modification | |||||||||
| E10 | 4.4.1.10 | Roll Up Doors Replacement | |||||||||
| E11 | 4.4.1.11 | Intake Roll-up Door Replacement | |||||||||
| E12 | 4.4.1.12 | Exhaust Roll-up Door Replacement | |||||||||
| E13 | 4.4.1.18 | Single Personnel Door Refurbishment | |||||||||
| E14 | 4.4.1.19 | Heating,Ventilation, and A/C Unit Replacement | |||||||||
| E15 | 4.4.1.20 | Roof Repair | |||||||||
| E16 | 4.4.1.21 | Roof Replacement | |||||||||
| E17 | 4.4.1.22 | Northern Tier Roof Extensions | |||||||||
| E18 | 4.4.1.23 | Bird Screen, Gutter, Downspouts Replacement | |||||||||
| E19 | 4.4.1.24 | Grout Replacement | |||||||||
| E20 | 4.4.1.25 | Deadman & Mounting Block Pull Test | |||||||||
| E21 | 4.4.1.26 | Novec FSS Conversion | |||||||||
| E22 | 4.4.1.27 | FSS-Pull Handle Installation | |||||||||
| E23 | 4.4.1.28 | Pneumatic FSS Testing on Noise Suppression Systems | |||||||||
| E24 | 4.4.1.29.1 | Pneumatic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| E25 | 4.4.1.29.2 | Pneumatic or Electrical FSS Additional Halon /NOVEC Bottle Removal | |||||||||
| E26 | 4.4.1.30 | FSS Hose Inspection | |||||||||
| E27 | 4.4.1.31 | Halon /Novec Bottle Site Installation | |||||||||
| E28 | 4.4.1.32 | Halon/Novec Bottle Valve Rebuild | |||||||||
| E29 | 4.4.1.33 | Bottle Refurbishment | |||||||||
| E30 | 4.4.1.34.1 | Bottle Discharge Investigation | |||||||||
| E31 | 4.4.1.34.2 | FSS Inspection | |||||||||
| E32 | 4.4.1.34.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| E33 | 4.4.1.34.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| E34 | 4.4.1.35 | Technical Orders Conversion | |||||||||
| E35 | 4.4.3 | Test Procedures and Report | |||||||||
| E36 | 4.4.4 | Foreign Object Debris Inspection | |||||||||
| E37 | 4.4.5 | Final Report |
| Exhibit F (CLIN X006) T-10 STANDARD REPAIR (OCONUS) NSN 4920-01-127-4640 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| F01 | 4.4.1.1 | Main Door Refurbishment | |||||||||
| F02 | 4.4.1.2 | Main Door Track Replacement | |||||||||
| F03 | 4.4.1.3 | Main Door Track Heating System | |||||||||
| F04 | 4.4.1.4 | Main Door Gearbox Heater | |||||||||
| F05 | 4.4.1.5 | Bay Lighting Refurbishment | |||||||||
| F06 | 4.4.1.6 | Turning vanes Refurbishment | |||||||||
| F07 | 4.4.1.7 | Close Circuit Television (CCTV) | |||||||||
| F08 | 4.4.1.8 | Control Room Window Reburbishment | |||||||||
| F09 | 4.4.1.9 | Deflector Attachment Modification | |||||||||
| F10 | 4.4.1.10 | Roll Up Doors Replacement | |||||||||
| F11 | 4.4.1.11 | Intake Roll-up Door Replacement | |||||||||
| F12 | 4.4.1.12 | Exhaust Roll-up Door Replacement | |||||||||
| F13 | 4.4.1.18 | Single Personnel Door Refurbishment | |||||||||
| F14 | 4.4.1.19 | Heating,Ventilation, and A/C Unit Replacement | |||||||||
| F15 | 4.4.1.20 | Roof Repair | |||||||||
| F16 | 4.4.1.21 | Roof Replacement | |||||||||
| F17 | 4.4.1.22 | Northern Tier Roof Extensions | |||||||||
| F18 | 4.4.1.23 | Bird Screen, Gutter, Downspouts Replacement | |||||||||
| F19 | 4.4.1.24 | Grout Replacement | |||||||||
| F20 | 4.4.1.25 | Deadman & Mounting Block Pull Test | |||||||||
| F21 | 4.4.1.26 | Novec FSS Conversion | |||||||||
| F22 | 4.4.1.27 | FSS-Pull Handle Installation | |||||||||
| F23 | 4.4.1.28 | Pneumatic FSS Testing on Noise Suppression Systems | |||||||||
| F24 | 4.4.1.29.1 | Pneumatic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| F25 | 4.4.1.29.2 | Pneumatic or Electrical FSS Additional Halon /NOVEC Bottle Removal | |||||||||
| F26 | 4.4.1.30 | FSS Hose Inspection | |||||||||
| F27 | 4.4.1.31 | Halon /Novec Bottle Site Installation | |||||||||
| F28 | 4.4.1.32 | Halon/Novec Bottle Valve Rebuild | |||||||||
| F29 | 4.4.1.33 | Bottle Refurbishment | |||||||||
| F30 | 4.4.1.34.1 | Bottle Discharge Investigation | |||||||||
| F31 | 4.4.1.34.2 | FSS Inspection | |||||||||
| F32 | 4.4.1.34.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| F33 | 4.4.1.34.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| F34 | 4.4.1.35 | Technical Orders Conversion | |||||||||
| F35 | 4.4.3 | Test Procedures and Report | |||||||||
| F36 | 4.4.4 | Foreign Object Debris Inspection | |||||||||
| F37 | 4.4.5 | Final Report |
| Exhibit G (CLIN X007) T-11 STANDARD REPAIR NSN 4920-01-070-2721 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| G01 | 4.4.1.1 | Main Door Refurbishment | |||||||||
| G02 | 4.4.1.2 | Main Door Track Replacement | |||||||||
| G03 | 4.4.1.3 | Main Door Track Heating System | |||||||||
| G04 | 4.4.1.4 | Main Door Gearbox Heater | |||||||||
| G05 | 4.4.1.5 | Bay Lighting Refurbishment | |||||||||
| G06 | 4.4.1.6 | Turning vanes Refurbishment | |||||||||
| G07 | 4.4.1.7 | Close Circuit Television (CCTV) | |||||||||
| G08 | 4.4.1.8 | Control Room Window Reburbishment | |||||||||
| G09 | 4.4.1.9 | Deflector Attachment Modification | |||||||||
| G10 | 4.4.1.10 | Roll Up Doors Replacement | |||||||||
| G11 | 4.4.1.11 | Intake Roll-up Door Replacement | |||||||||
| G12 | 4.4.1.12 | Exhaust Roll-up Door Replacement | |||||||||
| G13 | 4.4.1.18 | Single Personnel Door Refurbishment | |||||||||
| G14 | 4.4.1.19 | Heating,Ventilation, and A/C Unit Replacement | |||||||||
| G15 | 4.4.1.20 | Roof Repair | |||||||||
| G16 | 4.4.1.21 | Roof Replacement | |||||||||
| G17 | 4.4.1.22 | Northern Tier Roof Extensions | |||||||||
| G18 | 4.4.1.23 | Bird Screen, Gutter, Downspouts Replacement | |||||||||
| G19 | 4.4.1.24 | Grout Replacement | |||||||||
| G20 | 4.4.1.25 | Deadman & Mounting Block Pull Test | |||||||||
| G21 | 4.4.1.26 | Novec FSS Conversion | |||||||||
| G22 | 4.4.1.27 | FSS-Pull Handle Installation | |||||||||
| G23 | 4.4.1.28 | Pneumatic FSS Testing on Noise Suppression Systems | |||||||||
| G24 | 4.4.1.29.1 | Pneumatic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| G25 | 4.4.1.29.2 | Pneumatic or Electrical FSS Additional Halon /NOVEC Bottle Removal | |||||||||
| G26 | 4.4.1.30 | FSS Hose Inspection | |||||||||
| G27 | 4.4.1.31 | Halon /Novec Bottle Site Installation | |||||||||
| G28 | 4.4.1.32 | Halon/Novec Bottle Valve Rebuild | |||||||||
| G29 | 4.4.1.33 | Bottle Refurbishment | |||||||||
| G30 | 4.4.1.34.1 | Bottle Discharge Investigation | |||||||||
| G31 | 4.4.1.34.2 | FSS Inspection | |||||||||
| G32 | 4.4.1.34.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| G33 | 4.4.1.34.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| G34 | 4.4.1.35 | Technical Orders Conversion | |||||||||
| G35 | 4.4.3 | Test Procedures and Report | |||||||||
| G36 | 4.4.4 | Foreign Object Debris Inspection | |||||||||
| G37 | 4.4.5 | Final Report |
| Exhibit H (CLIN X008) T-12 STANDARD REPAIR NSN 4920-01-286-8681 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| H01 | 4.4.1.1 | Main Door Refurbishment | |||||||||
| H02 | 4.4.1.19 | Heating,Ventilation, and A/C Unit Replacement | |||||||||
| H03 | 4.4.1.28 | Pneumatic FSS Testing on Noise Suppression Systems | |||||||||
| H04 | 4.4.1.29.1 | Pneumatic or Electrical FSS Halon /Novec Bottle Removal | |||||||||
| H05 | 4.4.1.29.2 | Pneumatic or Electrical FSS Additional Halon/Novec Bottle Removal | |||||||||
| H06 | 4.4.1.30 | FSS Hose Inspection | |||||||||
| H07 | 4.4.1.31 | Halon/Novec Bottle Site Installation | |||||||||
| H08 | 4.4.1.32 | Halon/Novec Bottle Valve Rebuild | |||||||||
| H09 | 4.4.1.33 | Bottle Refurbishment | |||||||||
| H10 | 4.4.1.34.1 | Bottle Discharge Investigation | |||||||||
| H11 | 4.4.1.34.2 | FSS Inspection | |||||||||
| H12 | 4.4.1.34.3.1 | Bottle & Valve Inspection (Empty Bottle) | |||||||||
| H13 | 4.4.1.34.3.2 | Bottle & Valve Inspection (W/Residual Fire Extinguishing Agent) | |||||||||
| H14 | 4.4.1.35 | Technical Orders Conversion | |||||||||
| H15 | 4.4.3 | Test Procedures and Report | |||||||||
| H16 | 4.4.4 | Foreign Object Debris Inspection | |||||||||
| H17 | 4.4.5 | Final Report |
UNIQUE REPAIR CLINs
| Exhibit J (CLIN X009) A-18 UNIQUE REPAIR NSN 4920-00-431-4246 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| J01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| J02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit K (CLIN X010) T-04 UNIQUE REPAIR NSN 4920-00-005-8502 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| K01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| K02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit L (CLIN X011) T-09 UNIQUE REPAIR (CONUS) NSN 4920-01-082-1095 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| L01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| L02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit M (CLIN X012) T-09 UNIQUE REPAIR (OCONUS) NSN 4920-01-082-1095 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| M01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| M02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit N (CLIN X013) T-10 UNIQUE REPAIR (CONUS) NSN 4920-01-127-4640 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| N01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| N02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit P (CLIN X014) T-10 UNIQUE REPAIR (OCONUS) NSN 4920-01-127-4640 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| P01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| P02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit Q (CLIN X015) T-11 UNIQUE REPAIR NSN 4920-01-070-2721 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| Q01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| Q02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit R (CLIN X016) T-12 UNIQUE REPAIR NSN 4920-01-286-8681 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| R01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| R02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit S (CLIN X017) T-56 UNIQUE REPAIR NSN 4920-01-590-2905 | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| S01 | 4.4.2.3, 4.4.2.4, 4.4.2.5 | Unique Task Evaluation, PWS, and Cost Proposal | |||||||||
| S02 | 4.4.2.6 | Unique Repairs | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN | TBN |
| Exhibit T (CLIN X019) DATA Contract Data Requirements List (CDRL) | Basic | Option 1 | Option 2 | Option 3 | 6MO Extention | ||||||
| PWS Reference | Task | FY 2018 | FY 2019 | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | ||
| T01 | 4.6 | CDRL A001, DI-MGMT-81634C, Commercial Asset Visibility Air Force (CAVAF)/Government Furnished Material Report | |||||||||
| T02 | 4.4.1.30, 4.4.16 | CDRL A002, DI-MGMT-80368A, Status Report | |||||||||
| T03 | 4.4.2.3 | CDRL A003, DI-ILSS-80386, Repairable Item Inspection Report | |||||||||
| T04 | 4.4.2.4 | CDRL A004, DI-MGMT-81606, Statement of Work | |||||||||
| T05 | 4.4.3 | CDRL A005, DI-NDTI-80603A, Test Procedure | |||||||||
| T06 | 4.4.1.34.4, 4.4.3 | CDRL A006, DI-NDTI-80809B, Test/Inspection Report | |||||||||
| T07 | 4.4.5 | CDRL A007, DI-ADMN-80447A, Contract Summary Report | |||||||||
| T08 | 4.4.6 | CDRL A008, DI-MGMT-80368A, Status Report | |||||||||
| T09 | 4.4.10 | CDRL A009, DI-SESS-80639D, Engineering Change Proposal (ECP) | |||||||||
| T10 | 4.4.11 | CDRL A010, DI-SESS-80642, Notice of Revision (NOR) | |||||||||
| T11 | 4.4.12 | CDRL A011, DI-SESS-81000E/T, Product Drawings/Models and Associated Lists | |||||||||
| T12 | 4.4.12.1, 4.4.12.2, 4.4.19 | CDRL A012, DI-ADMN-81249A, Conference Agenda | |||||||||
| T13 | 4.4.12.1, 4.4.12.2, 4.4.20 | CDRL A013, DI-ADMN-81250A, Conference Minutes | |||||||||
| T14 | 4.4.13 | CDRL A014, TM-86-01P, Technical Manual Contract Requirement | |||||||||
| T15 | 4.4.21 | CDRL A015, DI-MGMT-81650, Integrated Master Schedule | |||||||||
| T16 | 4.8 | CDRL A016, DI-QCIC-80125B, Alert/Safe Alert | |||||||||
| T17 | 4.8 | CDRL A017, DI-QCIC-80126B, Response to an Alert/Safe Alert | |||||||||
| T18 | 5.5.2.1 | CDRL A018, DI-SAFT-81563, Accident/Incident Report | |||||||||
| T19 | 5.5.2.3 | CDRL A019, DI-ENVR-81375, Environmental Health and Safety Plan |
File details come from the government source that posted it. Updated .