Attachment_10,_Statement_of_Objectives_for_Sample_Task_2.pdf

PDF 105 KB Posted

Attached to
Noise Suppressor Sustainment Federal contract opportunity
Solicitation number
FA8534-17-R-0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This Statement of Objectives describes the required conversion of a T-10 noise suppressor from a halon fire suppression system to a NOVEC 1230 system. The contractor shall remove the existing halon system, install a new NOVEC 1230 total flooding system that is functionally equivalent to other NOVEC systems already in use on USAF T-10s, and properly dispose of the halon. The new NOVEC system must interface with the existing PLC control system and be pneumatically actuated. The contractor must test the new system and verify NOVEC concentration levels meet NFPA standards. Appendices provide applicable technical orders and drawings defining the standard T-10 configuration.

The related federal contract opportunity is a draft request for proposal to repair and install fire suppression systems on various noise suppressors, including delivery of technical data. The requirements include converting systems to NOVEC 1230 and maintaining all configuration types. The Department of the Air Force is the issuing agency located at Robins Air Force Base.

Attachment

View the file

Other files for this federal contract opportunity

Other files attached to Noise Suppressor Sustainment, newest first.
File Type Posted
Attachment_19,_Wage_Determination.pdf PDF
Attachment_2,_Request_for_Proposal_Checklist.pdf PDF
Attachment_6,_Past_Performance_Information.pdf PDF
Attachment_7,_Relevancy_Assessment.pdf PDF
Attachment_8,_Cross_Reference_Matrix.pdf PDF
Attachment_1,_Pricing_Exhibits.xlsx XLSX spreadsheet
Attachment_5,_Electronic_Proposal_Volumes.pdf PDF
Attachment_9,_Statement_of_Objectives_for_Sample_Task_1.pdf PDF
Attachment_3,_Consolidated_Gov't_Furnished_Property.pdf PDF
Attachment_4,_Cost_Model.xlsx XLSX spreadsheet
Attachment_14,_Transmittal_Letter.pdf PDF
Attachment_18,_Ordering_Instructions.pdf PDF
Attachment_20,_DD1423.pdf PDF
Quality_Assurance_Surveillance_Plan.pdf PDF
Attachment_12,_Teaming_Member_Consent_Form.pdf PDF
Attachment_13,_Past_Performance_Questionnaire.pdf PDF
FBO_Verbiage.docx DOCX document
Attachment_15,_Client_Authorization_Letter.pdf PDF
Attachment_17,_Section_L_&_M.pdf PDF
FA8534-17-R-0007.pdf PDF
Attachment_11,_Performance_Based_Work_Statement.pdf PDF
Questions_and_Answers_-_5_Oct_2017.pdf PDF
Attachment_17_SectionLandM.pdf PDF
Attachment_18_OrderingInstructions.pdf PDF
Attachment_4_CostModel.xlsx XLSX spreadsheet
Draft_RFP_FA853417R0007.pdf PDF
Questions_and_Answers_23_Aug_17.pdf PDF
DD1423_FA8534-17-R-0007.docx DOCX document
Attachment_17_SectionsLandM.doc DOC document
Attachment_4,_Cost_Model.xlsx XLSX spreadsheet
Attachment_8,_Cross_Reference_Matrix.docx DOCX document
Questions_and_Answers.pdf PDF
Attachment13,PastPerformanceQuestionnaire.docx DOCX document
Attachment7,RelevancyAssessment.docx DOCX document
Attachment12,TeamingConsentForm.docx DOCX document
Attachment15ClientAuthorizationLetter.docx DOCX document
Attachment14TransmittalLetter.docx DOCX document
Attachment6PastPerformanceInformation.docx DOCX document
Attachment5ElectronicProposalVolumes.docx DOCX document
Attachment17ConsentForm.docx DOCX document
Attachment2RequestforProposalChecklist.docx DOCX document
Attachment9StatementofObjectivesforSampleTask1.doc DOC document
Attachment10StatementofObjectivesforSampleTask2.doc DOC document
Attachment11PerformanceBasedWorkStatement.docx DOCX document
Attachment1NoiseSuppressorPricingExhibits.xlsx XLSX spreadsheet
NSS_Q&A.pdf PDF
FA853417R0007.pdf PDF
DRAFT_RFP_FA853417R0007.pdf PDF
DRAFT_Noise_Suppressor_Pricing_Exhibits.xlsx XLSX spreadsheet
DRAFT_Noise_Suppressor_PWS.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

FOR

T-10 FIRE SUPPRESSION SYSTEM CONVERSION

VERSION A

10 May 2017

LOCATION:

ROBINS AFB, GA

NOMENCLATURE: A/F37T-10 NOISE SUPPRESSOR/HUSH HOUSE

MODEL: A/F32T-10

NSN: 4920-01-127-4640

Prepared by:

MICK RANDEL

AFLCMC/WN-SEV

Warner Robins Air Logistics Complex (WR-ALC)

The marking requirements of DoDD 5230.24 do not apply to this document.

No data/documents incorporated by reference are export controlled.

STATEMENT OF OBJECTIVES

T-10 FIRE SUPPRESSION SYSTEM CONVERSION

1.0 DESCRIPTION OF SERVICES

The purpose of this Statement of Objectives (SOO) is to provide conversion of a Noise

Suppressor from Halon to Novec including, but not limited to, (a) Site assessment to determine full scope of work, (b) Removal of existing Halon Fire Suppression System (FSS,) (c)

Installation of new Novec FSS, (d) Modifications to noise suppressor as required in support of

Novec FSS installation, and (e) Verification testing/inspections.

2.0 SERVICES SUMMARY

Objective SOO paragraph Performance Threshold

Inspect and repair all components listed within the

SOO in order to provide fully functional Hush Houses with all repaired components operating as originally designed and repaired in accordance with the standard

Hush House configuration.

SOO section 3

The Government will reject the workmanship or installation quality of the repaired components if one or more major flaws or two or more minor flaws are discovered by Government personnel during final inspections. A major flaw is defined as any inoperable components or systems repaired, or systems/components not repaired in accordance with the standard configuration. A minor flaw is defined as functional and operable systems not fully meeting the standard configuration, as defined by the Hush House drawing package. All major and minor flaws identified during the Government’s final inspection shall be corrected within 7 days of Government disapproval.

3.0 GENERAL INFORMATION

The standard configurations for the Hush Houses in this document are defined by the Hush

House Technical Orders, drawings, and approved engineering change proposals (ECPs) and notices of revision (NORs,) within the Appendix (section 4.0) of this document.

The standard Hush House configuration and original design for all of the T-10 Hush Houses covered in this SOO are defined by the T-10/11 drawing package – top level 8045881 (T-10) and all applicable sub drawings.

3.1 FSS Conversion: The contractor shall install a total flooding agent FSS using 3M Novec

1230 as the extinguishing agent. The FSS shall be functionally equivalent to other Novec FSSs already installed in USAF T-10s. The contractor may propose a new configuration as long as functional equivalency is maintained. Functional equivalency is defined as follows:

The FSS must interface with the existing Gold Plate Programmable Logic Control (PLC)

Facility Control System (FSC)

The system must be pneumatically actuated

The system must be designed such that periodic maintenance, such as bottle weighing, agent measurement, and agent agitation, may be performed by the local unit

Must meet the same performance requirements as currently installed FSSs

The new Novec 1230 system components must be installed in accordance with approved drawings. The contractor must operationally test the fire suppression system to ensure integration with existing Hush House system doors, alarms, control console, and T20 cab.

Two sensing probes will be mounted in the hazard area (engine/aircraft location;) one at 2 ft elevation and one at 6 ft elevation. A full discharge of the fire suppression system shall be conducted. Using Tripoint analyzer used to measuring mixed gas concentration levels, verify concentration levels meet or exceed requirements as identified in 2012 NFPA

2001. Data shall also be compared against data collected during previous tests that established efficacy of 3M Novec 1230, to ensure that concentration levels in the field test are consistent with the results predicted by the scaled tests conducted at 3M laboratories. Concentration data will be collected over a 10 minute period of time to ensure adequate levels are maintained throughout this period.

3.2 Halon Disposal: The contractor shall properly package all Halon and return to DLA.

4.0 APPENDICES

4.1 Air Force Technical Orders (TOs): The following documents are applicable to this PWS to the extent specified herein.

Tech Order Description Applicable

33D4-6-645-1 Operation and Maintenance Instructions, Enclosed Noise Suppressor System

Aircraft/Engine (Hush House), A/F37T-

10/11

Entire Technical Order is applicable.

33D4-6-645-4 Illustrated Parts Breakdown, Enclosed

Noise Suppressor System Aircraft/Engine

(Hush House), A/F37T-10/11

Entire Technical Order is applicable.

4.2 Air Force Drawings: The T-10 drawings package is defined by the T-10/11 Top Level drawing 8045881 and all subsequent drawings.