RFP Attachment 10 - Price Spreadsheet.xlsx
XLSX spreadsheet 158 KB Posted
- Attached to
- Ground Power Modernization Federal contract opportunity
- Solicitation number
- FA8532-22-R-0001
About this file
This synopsis and attachment describe a solicitation for ground power equipment. The Department of the Air Force Materiel Command Lifecycle Management Center is seeking proposals for multiple award IDIQ contracts for 72kW ground power units, 144kW ground power units, and 144kW universal load banks. Two separate contract groups are anticipated, with Group A comprising all three end items under one full and open competition contract, and Group B as a small business set-aside for only the 72kW ground power units. The contracts would have a basic three-year period and seven one-year ordering periods, for a total performance period of ten years. Estimated quantities are 2928 for the 72kW units, 250 for the 144kW units, and 300 for the load banks. The solicitation attachment provides a price spreadsheet template for offerors to complete. The RFP is expected to be released in October 2021 with award anticipated in September 2022.
View the file
Other files for this federal contract opportunity
Show all 50
Ground Power Modernization has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Group A
| Price Spreadsheet | ||||||
| Solicitation FA8532-22-R-0001 | ||||||
| Group A | ||||||
| Offeror shall enter data in yellow highlighted fields only | ||||||
| Offeror: | ||||||
| ORDERING PERIOD I | ||||||
| BASIC Contract Period (36 Months) | ||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Unit Price | Total Price |
| 0001 | FFP | 144kW GPU First Article | ||||
| 0001AA | FFP | First Article Units | 6 | EA | $0 | $0 |
| 0001AB | FFP | NRE against CLIN 0001AA, to include testing costs | 1 | LO | $0 | $0 |
| 0002 | FFP | 72kW GPU First Article | ||||
| 0002AA | FFP | First Article Units | 6 | EA | $0 | $0 |
| 0002AB | FFP | NRE against CLIN 0002AA, to include testing costs | 1 | LO | $0 | $0 |
| 0003 | FFP | Universal Load Bank First Article | ||||
| 0003AA | FFP | First Article Units | 8 | EA | $0 | $0 |
| 0003AB | FFP | NRE against CLIN 0003AA, to include testing costs | 1 | LO | $0 | $0 |
| 0004 | Data | |||||
| 0004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | |
| 0004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | |
| 0004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | |
| 0004AD | FFP | TECHNICAL REPORT-STUDY SERVICES (B001) | 1 | LO | $0 | $0 |
| 0004AE | FFP | TECHNICAL REPORT-STUDY SERVICES (Test readiness review documentation package) (B002) | 1 | LO | $0 | $0 |
| 0004AF | NSP | SYSTEM SAFETY PROGRAM PLAN (C001) | 1 | LO | NSP | |
| 0004AG | NSP | SYSTEM SAFETY HAZARD ANALYSIS REPORT (C002) | 1 | LO | NSP | |
| 0004AH | NSP | CORROSION PREVENTION AND CONTROL PLAN (C003) | 1 | LO | NSP | |
| 0004AJ | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | |
| 0004AK | NSP | TECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005) | 1 | LO | NSP | |
| 0004AL | NSP | RISK MANAGEMENT FRAMEWORK (RMF) (C006) | 1 | LO | NSP | |
| 0004AM | NSP | SOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007) | 1 | LO | NSP | |
| 0004AN | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | |
| 0004AP | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | |
| 0004AQ | FFP | LOGISTICS PRODUCT DATA (C010) | 1 | LO | $0 | $0 |
| 0004AR | FFP | ENGINEERING DATA FOR PROVISIONING (C011) | 1 | LO | $0 | $0 |
| 0004AS | FFP | LOGISTICS PRODUCT DATA - 72 kW GPU (C012) | 1 | LO | $0 | $0 |
| 0004AT | FFP | ENGINEERING DATA FOR PROVISIONING - 72 kW GPU (C013) | 1 | LO | $0 | $0 |
| 0004AU | FFP | LOGISTICS PRODUCT DATA - 144 kW ULB (C014) | 1 | LO | $0 | $0 |
| 0004AV | FFP | ENGINEERING DATA FOR PROVISIONING - 144 kW ULB (C015) | 1 | LO | $0 | $0 |
| 0004AW | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 144 kW GPU (D001) | 1 | LO | $0 | $0 |
| 0004AX | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 72 kW GPU (D002) | 1 | LO | $0 | $0 |
| 0004AY | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 144 kW ULB (D003) | 1 | LO | $0 | $0 |
| 0004AZ | FFP | TRAINING MATERIAL (D005) | 1 | LO | $0 | $0 |
| 0004BA | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 |
| 0004BB | FFP | TECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001) | 1 | LO | $0 | $0 |
| 0004BC | FFP | FIRST ARTICLE TEST PLAN (E002) | 1 | LO | $0 | $0 |
| 0004BD | FFP | FIRST ARTICLE TEST PROCEDURE (E003) | 1 | LO | $0 | $0 |
| 0004BE | FFP | TEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004) | 1 | LO | $0 | $0 |
| 0004BF | FFP | TEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005) | 1 | LO | $0 | $0 |
| 0004BG | FFP | TEST-INSPECTION REPORT (144kW FIRST CONNECT TEST REPORT) (E006) | 1 | LO | $0 | $0 |
| 0004BH | FFP | TEST-INSPECTION REPORT (ULB FIRST CONNECT TEST REPORT) (E007) | 1 | LO | $0 | $0 |
| 0004BJ | NSP | PRODUCTION ACCEPTANCE TEST PROCEDURE (E008) | 1 | LO | NSP | |
| 0004BK | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | |
| 0004BL | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | |
| 0004BM | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | |
| 0004BN | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | |
| 0005 | CRNF | Travel | 1 | LO | $0 | |
| 0006 | FFP | Post Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference | 1 | LO | $3,000 | $3,000 |
| 0007 | FFP | 144kW GPU LRIP Production Units | ||||
| 1-10 | 10 | EA | $0 | $0 | ||
| 11-16 | 6 | EA | $0 | $0 | ||
| 16 | $0 | |||||
| 0008 | FFP | 72kW GPU LRIP Production Units | ||||
| 1-10 | 10 | EA | $0 | $0 | ||
| 11-17 | 7 | EA | $0 | $0 | ||
| 17 | $0 | |||||
| 0009 | FFP | Universal Load Bank LRIP Production Units | ||||
| 1-10 | 10 | EA | $0 | $0 | ||
| 11-16 | 6 | EA | $0 | $0 | ||
| 16 | $0 | |||||
| 0010 | TBN | LRU Spares | 1 | LO | TBN | |
| BASIC CONTRACT TOTAL | $3,000 | |||||
| ORDERING YEAR I (12 MONTHS) Full-rate | ||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Unit Price | Total |
| 1001 | FFP | 144kW GPU Production Units | ||||
| 1-10 | 10 | EA | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | ||
| 51-64 | 14 | EA | $0 | $0 | ||
| 64 | $0 | |||||
| 1002 | 72kW GPU Production Units (266) | |||||
| 1002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 266 = 66) |
| 1-10 | 10 | EA | $0 | $0 | |||||
| 11-50 | 40 | EA | $0 | $0 | |||||
| 51-66 | 16 | EA | $0 | $0 | |||||
| 66 | $0 | ||||||||
| 1002AB | FFP | 72kW GPU Competitive Quantity (.50 x 266 = 133) | |||||||
| 1-10 | 10 | EA | $0 | $0 | |||||
| 11-50 | 40 | EA | $0 | $0 | |||||
| 51-100 | 50 | EA | $0 | $0 | |||||
| 101-133 | 33 | EA | $0 | $0 | |||||
| 133 | $0 | ||||||||
| 1003 | FFFP | Universal Load Bank Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | |||||
| 11-50 | 40 | EA | $0 | $0 | |||||
| 51-60 | 10 | EA | $0 | $0 | |||||
| 60 | $0 | ||||||||
| 1004 | Data | ||||||||
| 1004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 1004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 1004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 1004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 1004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 1004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 1004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | |||
| 1004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 1004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 1004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 1004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 1005 | CRNF | Travel | 1 | LO | $0 | ||||
| 1006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR I TOTAL | $0 | ||||||||
| ORDERING YEAR II (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year I Unit Price | Risk | Escalation | Ordering Year II Computed Unit Price | Ordering Year II Computed Total Price |
| 2001 | FFP | 144kW GPU Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-66 | 16 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 66 | $0 | ||||||||
| 2002 | 72kW GPU Production Units (480) | ||||||||
| 2002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 480 = 120) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-120 | 20 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 120 | $0 | ||||||||
| 2002AB | FFP | 72kW GPU Competitive Quantity (.50 x 480 = 240) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-240 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 240 | $0 | ||||||||
| 2003 | FFP | Universal Load Bank Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-60 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 60 | $0 | ||||||||
| 2004 | Data | ||||||||
| 2004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 2004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 2004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 2004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 2004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 2004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 2004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 2004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 2004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 2004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 2004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 2005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 2006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR II TOTAL: | $0 | ||||||||
| OPTION I | |||||||||
| ORDERING PERIOD II | |||||||||
| ORDERING YEAR III (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year II Computed Unit Price | Risk | Escalation | Odering Year III Computed Unit Price | Ordering Year III Computed Total Price |
| 3001 | FFP | 144kW GPU Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-54 | 4 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 54 | $0 | ||||||||
| 3002 | FFP | 72kW GPU Production Units (440) | |||||||
| 3002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 440 = 110) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-110 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 110 | $0 | ||||||||
| 3002AB | FFP | 72kW GPU Competitive Quantity (.50 x 440 = 220) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-220 | 20 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 220 | $0 | ||||||||
| 3003 | FFP | Universal Load Bank Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-60 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 60 | $0 | ||||||||
| 3004 | Data | ||||||||
| 3004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 3004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 3004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 3004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 3004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 3004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 3004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 3004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 3004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 3004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 3004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 3005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 3006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR III TOTAL: | $0 | ||||||||
| ORDERING YEAR IV (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year III Computed Unit Price | Risk | Escalation | Ordering Year IV Computed Unit Price | Ordering Year IV Computed Total Price |
| 4001 | FFP | 144kW GPU Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-36 | 26 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 36 | $0 | ||||||||
| 4002 | FFP | 72kW GPU Production Units (432) | |||||||
| 4002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-108 | 8 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 108 | $0 | ||||||||
| 4002AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-216 | 16 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 216 | $0 | ||||||||
| 4003 | FFP | Universal Load Bank Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-60 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 60 | $0 | ||||||||
| 4004 | Data | ||||||||
| 4004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 4004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 4004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 4004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 4004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 4004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 4004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 4004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 4004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 4004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 4004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 4005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 4006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR IV TOTAL: | $0 | ||||||||
| ORDERING YEAR V (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year IV Computed Unit Price | Risk | Escalation | Ordering Year V Computed Unit Price | Ordering Year V Computed Total Price |
| 5001 | FFP | 144kW GPU Production Units | 8 | EA | $0 | $ - 0 | $0 | $0 | $0 |
| 5002 | FFP | 72kW GPU Production Units (432) | |||||||
| 5002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-108 | 8 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 108 | $0 | ||||||||
| 5002AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-216 | 16 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 216 | $0 | ||||||||
| 5003 | FFP | Universal Load Bank Production Units | |||||||
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-36 | 26 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 36 | $0 | ||||||||
| 5004 | Data | ||||||||
| 5004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 5004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 5004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 5004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 5004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 5004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 5004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 5004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 5004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 5004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 5004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 5005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 5006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR V TOTAL: | $0 | ||||||||
| ORDERING YEAR VI (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year V Computed Unit Price | Risk | Escalation | Ordering Year VI Computed Unit Price | Ordering Year VI Computed Total Price |
| 6002 | FFP | 72kW GPU Production Units (432) | |||||||
| 6002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0.00 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-108 | 8 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 108 | $0 | ||||||||
| 6002AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-216 | 16 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 216 | $0 | ||||||||
| 6004 | Data | ||||||||
| 6004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 6004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 6004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 6004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 6004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 6004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 6004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 6004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 6004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 6004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 6004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 6005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 6006 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR VI TOTAL: | $0 | ||||||||
| ORDERING YEAR VII (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year VI Computed Unit Price | Risk | Escalation | Ordering Year VII Computed Unit Price | Ordering Year VII Computed Total Price |
| 7002 | FFP | 72kW GPU Production Units (400) | |||||||
| 7002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 400 = 100) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 100 | $0 | ||||||||
| 7002AB | FFP | 72kW GPU Competitive Quantity (.50 x 400 = 200) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 200 | $0 | $0 | |||||||
| 7004 | Data | ||||||||
| 7004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | NSP | |||
| 7004AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | NSP | |||
| 7004AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | NSP | |||
| 7004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | NSP | |||
| 7004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | NSP | |||
| 7004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | NSP | |||
| 7004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 7004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | NSP | |||
| 7004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | TBN | |||
| 7004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | NSP | |||
| 7004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | NSP | |||
| 7005 | CRNF | Travel | 1 | LO | CRNF | ||||
| 7006 | TBN | LRU Spares | 1 | LO | TBN | TBN | |||
| ORDERING YEAR VII TOTAL: | $0 | ||||||||
| TOTAL EVALUATED PRICE: | $3,000 |
Group A Risk Factor
| Solicitation FA8532-22-R-0001 |
| Group A Risk Factor |
ORDERING YEAR II
| 144kW GPU Production Units | 72kW GPU Production Units | 72kW GPU Production Units | Universal Load Bank | ||||||||||||||||||||||||
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 2001 | 1- 10 | Ordering Year I Unit Price: | $ - 0 | 2002AA | 1- 10 | Ordering Year I Unit Price: | $ - 0 | 2002AB | 1- 10 | Ordering Year I Unit Price: | $ - 0 | 2003 | 1- 10 | Ordering Year I Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 2001 | 11-50 | Ordering Year I Unit Price: | $ - 0 | 2002AA | 11-50 | Ordering Year I Unit Price: | $ - 0 | 2002AB | 11-50 | Ordering Year I Unit Price: | $ - 0 | 2003 | 11-50 | Ordering Year I Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 2001 | 51-66 | Ordering Year I Unit Price: | $ - 0 | 2002AA | 51-100 | Ordering Year I Unit Price: | $ - 0 | 2002AB | 51-100 | Ordering Year I Unit Price: | $ - 0 | 2003 | 51-60 | Ordering Year I Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | $0 | Labor | 19% | $ - 0 | |||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | $0 | Other | 10% | $ - 0 | |||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 2002AA | 101-120 | Ordering Year I Unit Price: | $ - 0 | 2002AB | 101-150 | Ordering Year I Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 2002AB | 151-200 | Ordering Year I Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 2002AB | 201-240 | Ordering Year I Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
ORDERING YEAR III
| 144kW GPU Production Units | 72kW GPU Production Units | 72kW GPU Production Units | Universal Load Bank | ||||||||||||||||||||||||
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 3001 | 1- 10 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AA | 1- 10 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AB | 1- 10 | Ordering Year II Computed Unit Price: | $ - 0 | 3003 | 1- 10 | Ordering Year II Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 3001 | 11-50 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AA | 11-50 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AB | 11-50 | Ordering Year II Computed Unit Price: | $ - 0 | 3003 | 11-50 | Ordering Year II Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | $0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | |||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 3001 | 51-54 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AA | 51-100 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AB | 51-100 | Ordering Year II Computed Unit Price: | $ - 0 | 3003 | 51-60 | Ordering Year II Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 3002AA | 101-110 | Ordering Year II Computed Unit Price: | $ - 0 | 3002AB | 101-150 | Ordering Year II Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 3002AB | 151-200 | Ordering Year II Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | ||||||
| 3002AB | 201-220 | Ordering Year II Computed Unit Price: | $ - 0 | ||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | |||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | |||
| Copper | 14% | $ - 0 | 2.18% | $0 | |||
| Steel | 15% | $ - 0 | 1.53% | $0 | |||
| Generators | 10% | $ - 0 | 1.59% | $0 | |||
| Engine | 19% | $ - 0 | 1.59% | $0 | |||
| Labor | 19% | $ - 0 | |||||
| Other | 10% | $ - 0 | |||||
| TOTAL: | 100% | $ - 0 | $0 | ||||
| ORDERING YEAR IV |
| 144kW GPU Production Units | 72kW GPU Production Units | 72kW GPU Production Units | Universal Load Bank | ||||||||||||||||||||||||
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 4001 | 1- 10 | Ordering Year III Computed Unit Price: | $ - 0 | 4002AA | 1- 10 | Ordering Year III Computed Unit Price: | $ - 0 | 4002AB | 1- 10 | Ordering Year III Computed Unit Price: | $ - 0 | 4003 | 1- 10 | Ordering Year III Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 4001 | 11-36 | Ordering Year III Computed Unit Price: | $ - 0 | 4002AA | 11-50 | Ordering Year III Computed Unit Price: | $ - 0 | 4002AB | 11-50 | Ordering Year III Computed Unit Price: | $ - 0 | 4003 | 11-50 | Ordering Year III Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | |||||||||||||||
| 4002AA | 51-100 | Ordering Year III Computed Unit Price: | $ - 0 | 4002AB | 51-100 | Ordering Year III Computed Unit Price: | $ - 0 | 4003 | 51-60 | Ordering Year III Computed Unit Price: | $ - 0 | |||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 4002AA | 101-108 | Ordering Year III Computed Price: | $ - 0 | 4002AB | 101-150 | Ordering Year III Computed Unit Price: | $ - 0 | ||||||
| Ordering Year III Computed Unit Price: | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | ||||||
| 4002AB | 151-200 | Ordering Year III Computed Unit Price: | $ - 0 | ||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | |||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | |||
| Copper | 14% | $ - 0 | 2.18% | $0 | |||
| Steel | 15% | $ - 0 | 1.53% | $0 | |||
| Generators | 10% | $ - 0 | 1.59% | $0 | |||
| ` | Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | |||||
| Other | 10% | $ - 0 | |||||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | ||||||
| 4002AB | 201-216 | Ordering Year III Computed Unit Price: | $ - 0 | ||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | |||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | |||
| Copper | 14% | $ - 0 | 2.18% | $0 | |||
| Steel | 15% | $ - 0 | 1.53% | $0 | |||
| Generators | 10% | $ - 0 | 1.59% | $0 | |||
| Engine | 19% | $ - 0 | 1.59% | $0 | |||
| Labor | 19% | $ - 0 | |||||
| Other | 10% | $ - 0 | |||||
| TOTAL: | 100% | $ - 0 | $0 | ||||
| ORDERING YEAR V |
| 144kW GPU Production Units | 72kW GPU Production Units | 72kW GPU Production Units | Universal Load Bank | ||||||||||||||||||||||||
| CLIN | Range | CLIN | Range | CLIN | Range | CLIN | Range | ||||||||||||||||||||
| 5001 | 1-8 | Ordering Year IV Computed Unit Price: | $ - 0 | 5002AA | 1-10 | Ordering Year IV Computed Unit Price: | $ - 0 | 5002AB | 1- 10 | Ordering Year IV Computed Unit Price: | $ - 0 | 5003 | 1- 10 | Ordering Year IV Computed Unit Price: | $ - 0 | ||||||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | CLIN | Range | |||||||||||||||
| 5002AA | 11-50 | Ordering Year IV Computed Unit Price: | $ - 0 | 5002AB | 11-50 | Ordering Year IV Computed Unit Price: | $ - 0 | 5003 | 11-36 | Ordering Year IV Computed Unit Price: | $ - 0 | |||||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 5002AA | 51-100 | Ordering Year IV Computed Unit Price: | $ - 0 | 5002AB | 51-100 | Ordering Year IV Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 5002AA | 101-108 | Ordering Year IV Computed Unit Price: | $ - 0 | 5002AB | 101-150 | Ordering Year IV Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 5002AB | 151-200 | Ordering Year IV Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 5002AB | 201-216 | Ordering Year IV Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
ORDERING YEAR VI
| 72kW GPU Production Units | 72kW GPU Production Units | ||||||||||||
| CLIN | Range | CLIN | Range | ||||||||||
| 6002AA | 1- 10 | Ordering Year V Computed Unit Price: | $ - 0 | 6002AB | 1- 10 | Ordering Year V Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 6002AA | 11-50 | Ordering Year V Computed Unit Price: | $ - 0 | 6002AB | 11-50 | Ordering Year V Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 6002AA | 51-100 | Ordering Year V Computed Unit Price: | $ - 0 | 6002AB | 51-100 | Ordering Year V Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 6002AA | 101-108 | Ordering Year V Computed Unit Price: | $ - 0 | 6002AB | 101-150 | Ordering Year V Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 6002AB | 151-200 | Ordering Year V Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | ||||
| Other | 10% | $ - 0 | ||||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | ||||||
| 6002AB | 201-216 | Ordering Year V Computed Unit Price: | $ - 0 | ||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | |||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | |||
| Copper | 14% | $ - 0 | 2.18% | $0 | |||
| Steel | 15% | $ - 0 | 1.53% | $0 | |||
| Generators | 10% | $ - 0 | 1.59% | $0 | |||
| Engine | 19% | $ - 0 | 1.59% | $0 | |||
| Labor | 19% | $ - 0 | |||||
| Other | 10% | $ - 0 | |||||
| TOTAL: | 100% | $ - 0 | $0 | ||||
| ORDERING YEAR VII |
| 72kW GPU Production Units | 72kW GPU Production Units | ||||||||||||
| CLIN | Range | CLIN | Range | ||||||||||
| 7002AA | 1- 10 | Ordering Year VI Computed Unit Price: | $ - 0 | 7002AB | 1- 10 | Ordering Year VI Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | ||||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | ||||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 7002AA | 11-50 | Ordering Year VI Computed Unit Price: | $ - 0 | 7002AB | 11-50 | Ordering Year VI Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | $0 | |||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | $0 | |||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | CLIN | Range | ||||||||||
| 7002AA | 51-100 | Ordering Year VI Computed Unit Price: | $ - 0 | 7002AB | 51-100 | Ordering Year VI Computed Unit Price: | $ - 0 | ||||||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | Aluminum | 13% | $ - 0 | 2.70% | $0 | ||||
| Copper | 14% | $ - 0 | 2.18% | $0 | Copper | 14% | $ - 0 | 2.18% | $0 | ||||
| Steel | 15% | $ - 0 | 1.53% | $0 | Steel | 15% | $ - 0 | 1.53% | $0 | ||||
| Generators | 10% | $ - 0 | 1.59% | $0 | Generators | 10% | $ - 0 | 1.59% | $0 | ||||
| Engine | 19% | $ - 0 | 1.59% | $0 | Engine | 19% | $ - 0 | 1.59% | $0 | ||||
| Labor | 19% | $ - 0 | Labor | 19% | $ - 0 | $0 | |||||||
| Other | 10% | $ - 0 | Other | 10% | $ - 0 | $0 | |||||||
| TOTAL: | 100% | $ - 0 | $0 | TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 7002AB | 101-150 | Ordering Year VI Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | $0 | |||
| Other | 10% | $ - 0 | $0 | |||
| TOTAL: | 100% | $ - 0 | $0 |
| CLIN | Range | |||||
| 7002AB | 151-200 | Ordering Year VI Computed Unit Price: | $ - 0 | |||
| Cost Element | Element % | Element $ | Risk Factor % | Risk Factor $ | ||
| Aluminum | 13% | $ - 0 | 2.70% | $0 | ||
| Copper | 14% | $ - 0 | 2.18% | $0 | ||
| Steel | 15% | $ - 0 | 1.53% | $0 | ||
| Generators | 10% | $ - 0 | 1.59% | $0 | ||
| Engine | 19% | $ - 0 | 1.59% | $0 | ||
| Labor | 19% | $ - 0 | $0 | |||
| Other | 10% | $ - 0 | $0 | |||
| TOTAL: | 100% | $ - 0 | $0 |
Group B
| Price Spreadsheet | ||||||
| Solicitation FA8532-22-R-0001 | ||||||
| Group B | ||||||
| Offeror shall enter data in yellow highlighted fields only | ||||||
| Offeror: | ||||||
| ORDERING PERIOD I | ||||||
| BASIC Contract Period (36 Months) | ||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Unit Price | Total Price |
| 0011 | FFP | 72kW GPU First Article | ||||
| 0011AA | FFP | First Article Units | 6 | EA | $0 | $0 |
| 0011AB | FFP | NRE against CLIN 0002AA, to include testing costs | 1 | LO | $0 | $0 |
| 0012 | Data | |||||
| 0012AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | |
| 0012AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | |
| 0012AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | |
| 0012AD | FFP | TECHNICAL REPORT-STUDY SERVICES (B001) | 1 | LO | $0 | $0 |
| 0012AE | FFP | TECHNICAL REPORT-STUDY SERVICES (Test readiness review documentation package) (B002) | 1 | LO | $0 | $0 |
| 0012AF | NSP | SYSTEM SAFETY PROGRAM PLAN (C001) | 1 | LO | NSP | |
| 0012AG | NSP | SYSTEM SAFETY HAZARD ANALYSIS REPORT (C002) | 1 | LO | NSP | |
| 0012AH | NSP | CORROSION PREVENTION AND CONTROL PLAN (C003) | 1 | LO | NSP | |
| 0012AJ | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | |
| 0012AK | NSP | TECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005) | 1 | LO | NSP | |
| 0012AL | NSP | RISK MANAGEMENT FRAMEWORK (RMF) (C006) | 1 | LO | NSP | |
| 0012AM | NSP | SOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007) | 1 | LO | NSP | |
| 0012AN | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | |
| 0012AP | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | |
| 0012AQ | FFP | LOGISTICS PRODUCT DATA - 72 kW GPU (C016) | 1 | LO | $0 | $0 |
| 0012AR | FFP | ENGINEERING DATA FOR PROVISIONING - 72 kW GPU (C017) | 1 | LO | $0 | $0 |
| 0012AS | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - Group B (D004) | 1 | LO | $0 | $0 |
| 0012AT | FFP | TRAINING MATERIAL (D005) | 1 | LO | $0 | $0 |
| 0012AU | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 |
| 0012AV | FFP | TECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001) | 1 | LO | $0 | $0 |
| 0012AW | FFP | FIRST ARTICLE TEST PLAN (E002) | 1 | LO | $0 | $0 |
| 0012AX | FFP | FIRST ARTICLE TEST PROCEDURE (E003) | 1 | LO | $0 | $0 |
| 0012AY | FFP | TEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004) | 1 | LO | $0 | $0 |
| 0012AZ | FFP | TEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005) | 1 | LO | $0 | $0 |
| 0012BA | NSP | PRODUCTION ACCEPTANCE TEST PROCEDURE (E008) | 1 | LO | NSP | |
| 0012BB | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | |
| 0012BC | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | |
| 0012BD | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | |
| 0012BE | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | |
| 0013 | CRNF | Travel | 1 | LO | $0 | |
| 0014 | FFP | Post Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference | 1 | LO | $3,000 | $3,000 |
| 0015 | FFP | 72kW GPU LRIP Production Units | ||||
| 1-10 | 10 | EA | $0 | $0 | ||
| 11-17 | 7 | EA | $0 | $0 | ||
| 17 | $0 | |||||
| 0016 | TBN | LRU Spares | 1 | LO | TBN | |
| BASIC CONTRACT TOTAL | $3,000 | |||||
| ORDERING YEAR I (12 MONTHS) Full-rate | ||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Unit Price | Total |
| 1007 | 72kW GPU Production Units (266) | |||||
| 1007AA | FFP | 72kW GPU Guarantee Quantity (.25 x 266 = 67) |
| 1-10 | 10 | EA | $0 | $0 | |||||
| 11-50 | 40 | EA | $0 | $0 | |||||
| 51-67 | 17 | EA | $0 | $0 | |||||
| 67 | $0 | ||||||||
| 1007AB | FFP | 72kW GPU Competitive Quantity (.50 x 266 = 133) | |||||||
| 1-10 | 10 | EA | $0 | $0 | |||||
| 11-50 | 40 | EA | $0 | $0 | |||||
| 51-100 | 50 | EA | $0 | $0 | |||||
| 101-133 | 33 | EA | $0 | $0 | |||||
| 133 | $0 | ||||||||
| 1008 | Data | ||||||||
| 1008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 1008AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 1008AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 1008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 1008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 1008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 1008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | |||
| 1008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 1008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 1008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 1008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 1009 | CRNF | Travel | 1 | LO | $0 | ||||
| 1010 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR I TOTAL | $0 | ||||||||
| ORDERING YEAR II (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year I Unit Price | Risk | Escalation | Ordering Year II Computed Unit Price | Ordering Year II Computed Total Price |
| 2007 | 72kW GPU Production Units (480) | ||||||||
| 2007AA | FFP | 72kW GPU Guarantee Quantity (.25 x 480 = 120) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-120 | 20 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 120 | $0 | ||||||||
| 2007AB | FFP | 72kW GPU Competitive Quantity (.50 x 480 = 240) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51 - 100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-240 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 240 | $0 | ||||||||
| 2008 | Data | ||||||||
| 2008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 2008AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 2008AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 2008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 2008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 2008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 2008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 2008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 2008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 2008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP | ||||
| 2008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 | LO | NSP | ||||
| 2009 | CRNF | Travel | 1 | LO | CRNF | ||||
| 2010 | TBN | LRU Spares | 1 | LO | TBN | ||||
| ORDERING YEAR II TOTAL: | $0 | ||||||||
| OPTION I | |||||||||
| ORDERING PERIOD II | |||||||||
| ORDERING YEAR III (12 MONTHS) | 2.5% | ||||||||
| CLIN | Type | Description | Qty/BEQ | U/I | Ordering Year II Computed Unit Price | Risk | Escalation | Odering Year III Computed Unit Price | Ordering Year III Computed Total Price |
| 3007 | FFP | 72kW GPU Production Units (440) | |||||||
| 3002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 440 = 110) |
| 1-10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11-50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-110 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 110 | $0 | ||||||||
| 3007AB | FFP | 72kW GPU Competitive Quantity (.50 x 440 = 220) | |||||||
| 1- 10 | 10 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 11 - 50 | 40 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 51-100 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 101-150 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 151-200 | 50 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 201-220 | 20 | EA | $0 | $0 | $0 | $0 | $0 | ||
| 220 | $0 | ||||||||
| 3008 | Data | ||||||||
| 3008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 | LO | NSP | ||||
| 3008AB | NSP | CONFERENCE AGENDA (A002) | 1 | LO | NSP | ||||
| 3008AC | NSP | CONFERENCE MINUTES (A003) | 1 | LO | NSP | ||||
| 3008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 | LO | NSP | ||||
| 3008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 | LO | NSP | ||||
| 3008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 | LO | NSP | ||||
| 3008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 | LO | $0 | $0 | $0 | $0 | |
| 3008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 | LO | NSP | ||||
| 3008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 | LO | TBN | ||||
| 3008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 | LO | NSP |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .