E008.pdf

PDF 242 KB Posted

Attached to
Ground Power Modernization
Solicitation number
FA8532-22-R-0001
Issued by

About this file

This synopsis provides details for an upcoming Request for Proposal for Ground Power Modernization contracts. The Air Force Materiel Command Lifecycle Management Center is seeking proposals for Indefinite-Delivery/Indefinite-Quantity multiple award contracts for 72kW Ground Power Units, 144kW Ground Power Units, and 144kW Universal Load Banks. The contracts will have a potential value of $29.28 million for 72kW GPUs, $2.5 million for 144kW GPUs, and $3 million for 144kW ULBs over a ten-year period. Proposals are due by September 2022 and awards are expected in September 2022. The synopsis outlines technical requirements for the equipment, testing requirements, required deliverables, and evaluation criteria. Offerors must be registered in SAM.gov and approved for access to export-controlled technical data.

View the file

Other files

File Type Posted
GPM_JA_(400_Hz_Power_Cable_Assembly)_Redacted.pdf PDF
M-900 - Evaluation Basis for Award - Updated.pdf PDF
FA8532-22-R-0001_0004.pdf PDF
Question and Answer 8.docx DOCX document
Question and Answer 7.docx DOCX document
Question and Answer 6.docx DOCX document
FA8532-22-R-0001_0003.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed - Revised 2.pdf PDF
Extraction from RFP Attachment 10_Columns A thru D only.xlsx XLSX spreadsheet
Pre-Proposal Conference Brief Re-upoload.pptx PPTX presentation
Pre-Proposal Conference Follow-Up.docx DOCX document
QA from Pre-Proposal Conference.docx DOCX document
Pre-Proposal Conference Brief.pptx PPTX presentation
Question and Answer 5.docx DOCX document
RFP Attachment 5 - Relevancy Table - Revised.pdf PDF
Pre-Proposal Conference Brief.pptx PPTX presentation
Question and Answer 4.docx DOCX document
FA8532-22-R-0001_0002.pdf PDF
RFP Attachment 5 - Relevancy Table - Revised.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed - Revised.pdf PDF
Question and Answer 3.docx DOCX document
FA8532-22-R-0001_0001.pdf PDF
RFP Attachment 10 - Price Spreadsheet - Revised.xlsx XLSX spreadsheet
Question and Answer 2.docx DOCX document
Question and Answer 1.docx DOCX document
C017.pdf PDF
D004.pdf PDF
C004.pdf PDF
D004_TM86-01R.pdf PDF
C010.pdf PDF
C012.pdf PDF
F001.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet.pdf PDF
E001.pdf PDF
C007.pdf PDF
D002_TM86-01R.pdf PDF
D006.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed.pdf PDF
C002.pdf PDF
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
C003.pdf PDF
C008.pdf PDF
E002.pdf PDF
M-900 Evaluation Basis for Award.pdf PDF
FA8532-22-R-0001.pdf PDF
RFP Attachment 4 Instructions.docx DOCX document
E003.pdf PDF
A002.pdf PDF
Statement of Work (SOW)_1 Sep 21.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget.

Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0004BJ, 0012BA E TDP TM OTHER NDTI

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Ground Power Modernization FD2060-21-31511

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

E008 Test Procedure Production Acceptance Test Procedures

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-NDTI-80603A SOW para 3.6.3 AFLCMC/WNZ-SEV NSP

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT One Time See BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repro

16. REMARKS AFLCMC/ WNZ-SEV 0 1 0

BLK 4: Step by step procedures as required by DI-NDTI-80603A are not required.

The acceptance test procedure shall define top level steps taken to ensure each item is tested before shipment.

BLK 7: The PCO will issue approval outside of iRAPT.

BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only; Critical Technology; Export Controlled; 08 July 2021. Other requests shall be referred to AFLCMC/WNZ.

BLK 12: The contractor shall deliver the acceptance test procedures 60 days prior to the scheduled start of acceptance testing for each end item (72kW / 144kW GPU / 144 kW ULB). The Government will have 45 days after receipt of the test procedures for approval or disapproval. The contractor shall have 15 days to incorporate Government comments and redeliver the test procedures.

BLK 14: Documents shall be provided via electronic media utilizing standard Microsoft Office applications and submitted via email to the points of contact (POC) actual name, phone, and email provided by the Procuring activity at the time of contract award:

Support Equipment & Vehicles Division

ATTN: AFLCMC/WNZ-SEV

235 Byron Street, Suite 19A Robins AFB GA 31098-1813

Notification of submission shall be provided to the PCO via e-mail.

Support Equipment & Vehicles Division ATTN: AFLCMC/WNK (Brandi Owens) 235 Byron Street, Suite 19A Robins AFB GA 31098-1813

AFLCMC/WNK 0 1 0

15. Total 0 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Relious Grant 07/26/2021

DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages

9/02/2021

See BLK 16

2021-09-02T08:40:23-0400
HOGAN.JASON.H.1247029288

File details come from the government source that posted it. Updated .