C010.pdf
PDF 1024 KB Posted
- Attached to
- Ground Power Modernization Federal contract opportunity
- Solicitation number
- FA8532-22-R-0001
About this file
This synopsis announces an upcoming solicitation for Ground Power Modernization. The Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base intends to issue a request for proposal for multiple award IDIQ contracts to provide three ground power systems. One group will consolidate requirements for all three end items under one full and open competition contract. A second group will provide the 72kW GPU on a small business set-aside contract. The systems include a 72kW GPU, 144kW GPU, and 144kW ULB. The duration is a three-year basic period followed by seven one-year ordering periods. Total quantities are 2928 for the 72kW GPU, 250 for the 144kW GPU, and 300 for the 144kW ULB. Proposals are due in October 2021 and award is expected in September 2022. The solicitation will require technical data, testing, and deliverables including manuals, plans, and reports. Foreign firms are ineligible to compete. Interested vendors should contact the points of contact listed to register for amendment notifications and request questions be submitted in writing.
View the file
Other files for this federal contract opportunity
Show all 50
Ground Power Modernization has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page of Pages
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T
(1 Data I tem)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this bur den, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
D. SYSTEM/ITEM
Ground Power Unit 6615-01-694-4413 144 kW
E. CONTRACT/PR NO. F. CONTRACTORS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
LOGISTICS PRODUCT DATA
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81758A NOT 1/T
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
406 SCMS/GULAB
7. DD250 REQ
See Block 16
9. DIST
STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
As Required
12. DATE OF FIRST SUBMISSION
IAW AFMC Form 718
14. DISTRIBUTION
b. COPIES
8. APP CODE
See Block 16
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
As Required
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS.
A. The Prime Provisioning Activity (PPA) is identified in Block 14.
B. Specific summaries to be delivered on this contract are:
(1) _X_ Provisioning Parts List (PPL) Top Down Sequence
(2) ___ Short Form Provisioning Parts List (SFPPL)
(3) ___ Common and Bulk Items List (CBIL)
(4) _X_ Design Change Notices (DCN)
(5) _X_ Statement of Prior Submission (SPS) Hard Copy Only.
(6) _X_ Long Lead Items List (LLIL) Select one of the following:______LLIL-Interim Release (Items interim released by the contractor when interim release is authorized by the contract.
___X___LLIL-Recommended (Items recommended as LLIL).
C. Attachment: LMI Data Product Worksheet for Logistics Product Data.
D. Block 7: Acceptance/Rejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.
E. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.
F. Block 9: Distribution statement D applies.
G. Blocks 10, 11, 12, & 13:
(1) PPL, SFPPL, LLIL, CBIL: Date(s) to be reflected on the AFMC Form 718 (Atch 1 to the Initial Provisioning Performance Specification (IPPS)). See Paragraph 3.1 of the IPPS.
(2) DCN(s): See Paragraph 10 of the IPPS.
(3) SPS: When the IPPS is provided with the solicitation, an offeror’s SPS shall be as outlined by the solicitation. When the IPPS is furnished after award, the contractor shall furnish a SPS within thirty (30) days after receipt of the IPPS. See Paragraph 7 of the IPPS.
H. Logistics Product Data transmittal document will reflect, as a minimum, PCCN, SCC, PCC, Contract Number, Type Logistics Product Data, and Line Item Count.
I. Data element definitions will be in accordance with GEIA-HB-0007B and/or other data provided at the PGC by the PPA.
J. In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site (contractor or government), a transmittal notification will be concurrently forwarded to the PPA via email.
406SCMS/GULAB 1 0
235 Byron St.
Suite 19A
Robins AFB GA
31098-1670
15. TOTAL
1 0
G. PREPARED BY
Tieesha Essex
H. DATE
8/12/2021
I. APPROVED BY J. DATE
0004AQ C
C010
09/08/2021
LOGISTICS DATA PRODUCTS WORKSHEET
1. SUMMARY TITLE: Logistics Data Products
2. SPECIFIC INSTRUCTIONS: Types of Logistics Data Products which may be required are listed below and will be specified on the Contract Data Requirement List (CDRL) for DI-SESS-81758A/T.
2.1. PROVISIONING PARTS LIST (PPL): Defined as Hardware Breakdown.
2.1.1. PPL will also include all repairable commercial off the-shelf (COTS) items as a one line entry unless excluded by the PPA.
2.1.2. PPL will not include a breakdown of government furnished equipment unless specified otherwise by the PPA, but shall be listed as a one line entry on the PPL.
2.2. COMMON AND BULK ITEMS LIST: Hardware items such as common nuts, bolts, screws, keys, washers, and fittings, except those of special design. The CBIL can also contain bulk items such as electrical wire and cable, gasket material, tubing, hose, adhesives, paints, oil, grease, solvents, and metal stock (such as rods and sheets). WHEN THE PPL IS A REQUIREMENT, ALL HARDWARE ITEMS WILL
APPEAR ON THE PPL, NOT ON THE CBIL.
2.3. DESIGN CHANGE NOTICE (DCN): Identify changes to Logistics Data Products which add to, delete, supersede, or modify items previously listed which are approved for incorporation into the end item, which result from an engineering change requiring approval by a configuration authority. Administrative Change Notices (ACNs) are changes that do not result from an engineering change (ex. typo, additional source, etc.).
2.4. LONG LEAD TIME ITEMS LIST (LLTIL): List of those items which, due to their complexity of design, complicated manufacturing process or limited production, require early ordering to ensure adequate delivery schedules.
2.5. SHORT FORM PROVISIONING PARTS LIST (SFPPL): Identify only those support items recommended for maintenance of the end item, component or assembly.
2.6. STATEMENT OF PRIOR SUBMISSION (SPS): Certify that the
contractor/subcontractor has previously furnished the Government Logistics Data Products which may satisfy the Logistics Data Products requirements of this contract.
3. DATA IN LMI SPECIFICATION: Refer to Initial Provisioning Performance Specification (IPPS), LMI Data Product Selection Sheet (Atch 2).
4. DATA NOT IN LMI SPECIFICATION: Refer to IPPS, Atch 2 Notes.
5. SUMMARY LAYOUT: Government Provided. Refer to IPPS, Atch 3.
AIR FORCE
INITIAL PROVISIONING PERFORMANCE SPECIFICATION (IPPS)
3 SEP 2013
1. Initial Provisioning Performance Specification (IPPS). This document provides specifications for contractor’s use in submitting Logistics Product Data compatible with the AFMC D220 Provisioning
System and participating in the provisioning process with the Government.
1.1. Initiator and Prime Provisioning Activity (PPA):
406 SCMS/GULAB
235 Byron St., Suite 19A
ROBINS AFB GA 31098-1670
1.2. Date of Initiation: 09 Aug 2021
2. Correspondence:
2.1. Address all correspondence pertaining to spare/repair parts provisioning and related data items to the PPA.
2.2. The PPA shall be the sole Government activity with which the contractor interfaces on initial provisioning matters, unless specifically authorized by the PPA. Pursuant to paragraph 2.1 and this paragraph, correspondence from the PPA shall be accepted and all provisioning actions therein accomplished unless otherwise directed by the Principal Contracting Officer (PCO).
3. Conferences.
3.1. A Provisioning Guidance Conference (PGC) shall be scheduled by the PPA and should be held within 45 days after receipt of the contract by the PPA. The PGC is normally held at the PPA for approximately two days to ensure both the contractor and the government understand the provisioning requirements on contract. If a PGC is not desired, the Contractor shall submit a written request for waiver of the PGC to the PPA. In the event a waiver is approved, a mutual understanding of the
Provisioning requirements must be communicated in some forum in which the AFMC Form 718, Provisioning Performance Schedule (PPS), must be documented/completed, signed by both the government and contractor, and a contract modification issued, if required. PGCs by telecom are an option. When done by telecom, minutes and AFMC Form 718 are still required to be completed and signed.
3.2. A Spares Provisioning Conference (SPC) is required. The SPC location, date(s) and time along with specific requirements will be discussed at the PGC or during the completion of the AFMC Form 718
(PPS) if PGC is waived. SPCs may be formal face-to-face conferences or desk top reviews.
3.3. A sample article of the component/end item may or may not be available at the SPC. If available, sample article will be viewed and/or disassembled at the SPC.
4. Manufacturers or Commercial Manuals are required. When required furnish a manufacturer’s or commercial manual to supplement the Short Form Provisioning Parts Lists (SFPPL) or Provisioning Parts Lists (PPL) that have embedded Commercial Off-the-Shelf (COTS) equipment. All publications prepared and printed without regard to Government format and outline but which include a parts list will be acceptable as a manufacturer or commercial manual for the purpose of this requirement. This requirement applies only to available manuals for the end item or components thereof. No manuals will be developed to satisfy this requirement..
5. Interim Release (IR) is not authorized.
6. Statement of Prior Submission (SPS) is required where applicable. The SPS is submitted to certify that the contractor/subcontractor has previously furnished the Government Logistics Product Data for the end item or any component thereof which may satisfy the Logistics Product Data requirements of this contract. The SPS will include identifying information (current procurement or previous submission) such as contract number, contract/exhibit line item number, end item/component type or model number/reference number, item name, manufacturer’s name and Commercial and Government Entity
Code, PPA receiving the Logistics Product Data and date prepared, NSN (if available) and other information as required by the PPA. If the Government determines that the previously submitted data is adequate, the SPS may result in reduction or elimination of Logistics Product Data and Engineering Data for Provisioning (EDFP) requirements specified on DD Form 1423 and conference requirements.
7. Provisioning Performance Schedule (PPS), AFMC Form 718. PPS (Atch 1) will be developed by
PPA and Contractor at the PGC or in other forum agreed upon.
8. Engineering Data for Provisioning (EDFP): A drawing shall be provided for each first appearance
(less drawings for MIL-SPEC CAGE Codes and Part Numbers) non-stocklisted item appearing on the
PTD. However, if the end item being provisioned was stock listed on a Support Equipment
Recommendation Data (SERD) document, and the type Logistics Product Data is a PPL, an end item drawing with parts list is required to be able to have visibility of the PPL indenture breakdown. For provisioning purposes, EDFP order of precedence shall be:
- Data equivalent to approved product engineering drawings.
- Commercial drawings
- Commercial manuals, when required to provide information on a commercial assembly.
- Catalogs or catalog descriptions.
- Sketches or photographs with brief descriptions of dimensional, materiel, mechanical, electrical, or other descriptive characteristics. When sketches or photographs are provided for an assembly, a bill of material shall also be provided.
During the SPC, in the event an action requires linkage within D043A, it’s possible a drawing would be required for stock-numbered items for the purposes of linking a National Stock Number (NSN) with a Part
Number.
8.1 Proper labeling of EDFP: EDFP delivered to the PPA shall be in hard copy, PLISN (Provisioning
Line Item Sequence Number) sequence. Each drawing shall be labeled with the PCCN (Provisioning
Contract Control Number), SCC (Submission Control Code), PLISN, CAGE (Commercial and
Government Entity), P/N (Part Number), and PCC (Provisioning Control Code). EDFP delivered to DLIS, Battle Creek, MI, may be in hard copy, PLISN sequence or electronically submitted. If delivered in hard copy, labeling as stated above applies. If submitted electronically, each drawing should have a file name as follows: PLISN(space)P/N.pdf.
8.2 FSC and Item Name assignments will be in accordance with DLIS' H2 (Federal Supply
Classification) and H6 (The Federal Item Name Directory) Handbooks.
9. Design Change Notices (DCN). DCNs will include all changes required to an item previously presented to align spares support with actual production items. Unless specifically instructed otherwise by the PPA, the contractor shall notify the PPA of any and all changes whether of a production or modification type which are approved for incorporation into the system/equipment furnished under the contract. DCNs are to be accompanied by applicable EDFP.
9.1. Changes resulting from omission or correction of data previously submitted are considered administrative changes. This type of change may be submitted in non-standard Logistics Product Data formats to include business letter, computer lists, etc, as directed by the PPA at the PGC or in other forum agreed upon.
9.2. Reference Number Changes. Reference numbers are not to be rolled or changed unless specifically allowed by applicable specifications. New design numbers are not to be assigned strictly for administrative or manufacturing purposes, or to facilitate the production control process.
9.3. Reference Items. Submit DCNs against only the first appearance items, unless specifically instructed otherwise by the PPA.
9.4. DCNs to document changes made during the provisioning process by the Government to previously submitted Logistics Product Data shall not be resubmitted.
9.5. Procurable Type Items. DCNs for procurable type items are required to be submitted within twenty-one (21) days after release for fabrication or procurement for prime contractor design items and forty-two
(42) days after release for fabrication and procurement of subcontractor supplied items.
9.5.1. DCNs Requiring Revision to Provisioned Item Orders (PIO). When a design change affects any part ordered by the government, the contractor shall take immediate action to affect the following revisions and incorporate the results on DCNs for approval:
9.5.1.1. Deletions. When a design change reduces or eliminates spare/repair parts requirements for the end item/component, the contractor shall delete or reduce such requirements originally ordered by PIO in the ratio authorized by the program data applicable to the end items on order that are affected by the
DCN.
9.5.1.2. Adjustments. When a spare/repair part previously ordered by the Government is replaced by another item, and the replacing part is not stocklisted, the contractor shall fabricate or procure the new item in the same ratio as the number of end items/components affected by the change not to exceed the amount funded for affected items. When the adjustment requires an increase in the total quantity recommended or additional items of support, the increase will be recommended by the contractor in accordance with program data provided by the PPA.
9.6. Nonprocurable Type Items. When required by the PPA, design change data for nonprocurable type items (items not coded as spares) (Source, Maintenance, Recoverability (SMR) Code first position X, A, M, K) will be prepared in accordance with instructions from the PPA . Submittals will be within sixty (60) days after release for fabrication or purchase.
10. PTD Submittal Specifications. The following paragraphs provide specifications for submission of
Logistics Product Data by multiple card image to be compatible with the the AFMC Automated
Provisioning System (hereafter referred to as the D220 System). Strict adherence to these instructions must be applied to ensure Logistics Product Data is accepted by the D220 System. Data elements to be included in the Logistics Product Data are reflected in attachment 2 (LMI Data Product Selection
Sheet – Logistics Product Data).
10.1. Media/Software: Acceptable electronic media file can be compact disk (CD) or e-mail attachment.
10.1.1 Data may be input using Microsoft WORD with the paragraph marker on. This enables the spaces to be seen at all times.
10.1.2. Ensure margins are such that each line is exactly 80 characters as outlined in IPPS para 10.4.1.
through 10.6.4.5 of the IPPS. NOTE: Do Not use the tab key.
10.1.3 First line of data will be the actual Logistics Product Data header card as called out in IPPS Para
10.4.1.
10.1.4. Blank lines between entries are not acceptable. Do not put header, footer or page number in the page setup for the document. Data must be saved as a Text (.txt) file.
10.1.5. Do not submit encrypted data. The D220 Provisioning system is for unclassified data only and does not have encryption capabilities.
10.2. Labels. Cite the Contract number, PCCN, and SCC (as a minimum) on the outside of a CD ROM submittal or in the subject line on e-mail submittals.
10.3. Security Classification of Data. Classified data (programs or line item data) cannot be entered into the D220 System. Classified data is processed outside the D220 System using contingency operating procedures as program directed.
10.4. Logistics Product Data Format. Required format for Logistics Product Data is depicted in
Attachment 3.
10.4.1. Header Card. Required for all types and submissions of Logistics Product Data. NOTE: All alpha characters must be upper case.
10.4.1.1. CC 1-6, enter PCCN which will be provided at PGC.
10.4.1.2. CC 7-25, enter Procurement Instrument Identification Number (PIIN). Do not use dashes.
10.4.1.3. CC 26-46, enter Model or Type No.
10.4.1.4. CC 47-56, Control Data:
10.4.1.4.1. CC 47, enter appropriate type Logistics Product Data Code. Mandatory entry. This code, peculiar to the Air Force, identifies the type of Logistics Product Data being submitted. Logistics Product
Data code must be one of the codes defined below:
Logistics Product Data Code Definition
I Long Lead Time Items List (LLTIL)
Interim Release (IR)
R Long Lead Time Items List (LLTIL)
G Provisioning Parts List (PPL)
F Short Form Provisioning Parts List (SFPPL)
D Design Change Notice (DCN)
C Common/Bulk Items List (CBIL)
B Recoverable Item Breakdown (RIB)
P Post Conference List (PCL)
(Foreign Military Sales or Manual Provisioning)
10.4.1.4.2. CC 48, enter B. Mandatory.
10.4.1.4.3. CC 49-56 - For contractor use, if required, and agreed upon with the PPA.
10.4.1.5. CC 57-61, enter Prime CAGE.
10.4.1.6. CC 62-66, enter appropriate SCC (ex: 00001, 00002, etc).
10.4.1.7. CC 67-72, enter date of list, e.g. “YYMMDD”.
10.4.1.8. CC 73-80, blank.
10.4.2. Basic Line Item Records: Basic line item records shall be completed for each provisioning line item and submitted by Card Format Identifier A, B, C, D, E, F, G, H, J, and L as appropriate. The number of card images that the D220 System is capable of accepting are explained below. These instructions do not, however, impose card count restrictions upon the contractor in the submission of Logistics Product
Data to the Government.
10.4.2.1. A Card. A maximum of four "A" cards can be accepted per PLISN. The number will depend upon total number of reference numbers being presented. Reference number are identified on “A” Cards as follows:
01A Card - First Precedent Reference Number (FPRN)
02A Card - Second Precedent Reference Number (SPRN)
03A Card - First Additional Reference Number (FARN)
04A Card - Second Additional Reference Number (SARN)
10.4.2.2. B Card. Only one “B” Card can be accepted per PLISN.
10.4.2.3. C Card. Only one “C” card can be accepted per PLISN.
10.4.2.4. D Card. Two “D” cards can be accepted per PLISN. This will be based on number of cards required to present reference designations.
10.4.2.5. E Card. Only one “E” card can be accepted per PLISN.
10.4.2.6. F Card. Maximum of 30 “F” cards can be accepted depending on serial effectivity. Submitted only on type Logistics Product Data “D”.
10.4.2.7. G. Card. Only one “G” card can be accepted per PLISN. Submitted only on type Logistics
Product Data ‘D”.
10.4.2.8. H Card. A total of three “H” cards can be accepted per PLISN with a maximum of 105 characters in the remarks. Only the first fifteen positions of the third “H” card can be accepted by the
D220 System.
10.4.2.9. J Card. Only one “J” card can be accepted per PLISN,
10.4.2.10. L Card. Only one “L” card can be accepted per PLISN.
10.4.3. Card Sequence Numbers (CSN). Two position numeric code, cc 78-79. Mandatory entry, 01, 02, 03, etc, as needed.
10.4.4. Card Format Identifiers (CFI). One position alpha code, CC 80. Mandatory entry.
10.5. Data Elements. Specific codes and definitions for data elements can be found in DOD 4100.39M, Volume 10, Federal Logistics Information System (FLIS) Procedures Manual. Specifications for the length, type, positional justification, and decimal placement of a data element field, or subfield, can be found in GEIA-HB-0007A. Data elements not contained in the GEIA-HB-0007A LMI are defined in Atch 2.
10.6. Type Logistics Product Data “D”, DCN. DCN submittals require the following:
10.6.1. Header Card per para 10.4.1.
10.6.2. For Replaced PLISNs:
10.6.2.1. 01A Card with PCCN, PLISN, Type of Change Code (TOCC), CAGE, Reference Number and
CSN entered.
10.6.2.2. “F”, “G” and “H” Cards as required.
10.6.3. For Superseding PLISNs: Cards “A” through “L” are required as applicable.
10.6.4. The following information is provided for preparation of DCNs and use of the TOCC. There are five basic types of Logistics Product Data updates which are required when data is added, changed, or deleted affecting provisioning lists (PL) previously delivered. These transactions are required based on data changes in provisioning data baselined by a previous Logistics Product Data submittal.
10.6.4.1. Standard Data Update. For each Logistics Product Data card affected by data which has been added or changed since the previous Logistics Product Data delivery, mandatory data, i.e., PCCN, PLISN, CSN, and CFI, an “M” TOCC and the added/changed data only are required. If data has been deleted, a “G” is required in the TOCC and in the left most position of each field deleted on the appropriate Logistics Product Data card. Data deletions and changes/additions occurring on the same
Logistics Product Data card will require both a change and deletion card for the appropriate data.
10.6.4.1.1. If all data on a Logistics Product Data CFI is deleted, a delete transaction is required consisting of the PCCN, PLISN, CSN “01”, CFI (except A), the key data associated with that Logistics
Product Data Card, and a “G” TOCC.
10.6.4.1.2. When an entire PLISN record is deleted, a delete transaction is required consisting of the appropriate PCCN, PLISN, CAGE, Reference Number, and a “D” TOCC on the 01A card. Also, if the reference designation exists, it along with the PCCN and PLISN on the 01D card with a “G” TOCC is required. In addition, if any change authority related information is changed, CFIs “F”, “G” and “H” update transactions are also required.
10.6.4.2. Quantity Data Update. If a quantity field is updated, mandatory data, a “Q” TOCC, and the updated quantity data field(s) are required. This will only apply to the following data: Quantity Per
Assembly, Quantity Per End Item, Total Quantity Recommended, Quantity Shipped, Quantity Procured and Prorated Quantity. If additional data displayed on the same Logistics Product Data card also changes, only one change card is required with TOCC “Q”. If quantity data is deleted, a change card is required with a zero filled quantity and TOCC “Q”.
10.6.4.3. Key Data Update. Certain provisioning data are considered key and associated data elements and are listed below. Changes to key data requires the submission of both a delete and change card for the appropriate key data. The deletion card should contain a “G” TOCC and the original key data. The change card should contain an “M” TOCC with new key data and applicable associated data. When key data is deleted, deletion of the corresponding associated data is required.
KEY DATA ASSOCIATED DATA
CAGE and Additional RNCC and RNVC
Reference number
NHA PLISN ORR
UOC None
Reference Designation RDOC, RDC
PLCC None
Change Authority Number Serial Number Effectivity
Prorated Exhibit Line Item Number
Prorated Quantity
IC
Replaced or Superseding PLISN
Total Item Changes
Quantity Shipped
Quantity Procured
Serial Number Effectivity None
10.6.4.4. Associated Data Update. Changes to associated data require the submission of a change card consisting of an “M” TOCC with the changed data and entry of the applicable key data. Deletion of associated data requires the submission of a deletion card with a “G” TOCC, a “G” in the left most position of the associated data field and entry of the key data.
10.6.4.5. Design Changes with Limited Serial Effectivity. When Logistics Product Data updates are submitted for these design changes, Change Authority Number and Serial Number Effectivity along with a
“L” TOCC for the replaced item are required. If a quantity change occurs on a limited effectivity item, an
“L” TOCC is required in lieu of a “Q”. The superseding item is submitted with a “blank” TOCC.
11. Additional Information. Information regarding the following requirements or any other provisioning matter may be requested from the PPA through the PCO by the contractor prior to contract award.
Requests for this information must be submitted to the PCO in writing. Detailed guidance on these subjects will be provided at the PGC. This information may also be available in the Bidder’s Library.
11.l. Failure Factors, Consist of Maintenance Replacement Rate 1 (MRR1), Condemnation Below
Depot (CBD), Condemnation at Depot (CAD), Overhaul Replacement Rate (ORR), and Not Repairable this Station (NRTS).
11.2. Provisioning Factor Table. This table is used to determine which factors are required for items assigned a procurable SMR code.
11.3. Contractor Notification (CN) Products. These products are generated by the AF in the provisioning process. Media/software for CN products will be returned to the contractor in a format determined at the PGC. Peculiar AF data elements will be included in CN products which will be explained at the PGC. The Government does not require the contractor to develop an Automated Data
Processing (ADP) capability to accept Provisioned Item Orders (PIO) and/or the CN products.
3 Atch
1. AFMC Form 718
2. Logistics Product Data
Data Selection Sheet
3. Logistics Product Data Format
DATE
NO
ACTION
AGENCY
1 GOVT
GOVT AND
CONTR
3 CONTR
GOVT
CONTR
START
FINISH
GOVT
5 START
FINISH
CONTR
GOVT AND
CONTR
GOVT
6 CONTR
START
FINISH
8 GOVT
9 CONTR
10 GOVT
11 GOVT
12 GOVT
PROGRAM MANAGERCONTRACTOR
APPROVED BY
AF PROV CHAIRPERSON
OPERATIONAL NEED DATE
SPARES NEED DATE
IAW PROGRAMMING CHECKLIST BUT NLT 90 DAYS
PRIOR TO OND
TRAINING START DATE
PIOs w/DELIVERY SCHEDULE
DUE TO CONTRACTOR 60 DAYS AFTER SPARES
PROVISIONING CONFERENCE
ACCEPTANCE/REVISION OF DELIVERY
SCHEDULE
NLT 60 DAYS AFTER RECEIPT OF PIO's
7 SPARES PROVISIONING CONFERENCE
GOVT AND
CONTR
NLT 60 DAYS AFTER RECEIPT OF PTD/EDFP
LOGISTICS PRODUCT DATA/EDFP
REQUIREMENTS
NLT 60 DAYS PRIOR TO PROVISIONING CONFERENCE
b. RECOMMENDED ITEMS
c. SPARES PROVISIONING
CONFERENCE
d. PIOs RELEASED TO CONTRACTOR
45 DAYS PRIOR TO RELEASE OF PPL
NLT 90 DAYS PRIOR TO CONTRACTOR'S ORDER
NEED DATE
NLT 30 DAYS AFTER RECEIPT OF LLIL FROM
CONTRACTOR
N/A
NLT 30 DAYS AFTER RECEIPT OF CANDIDATE LIST N/A
GOVT AND
CONTR
NLT 60 DAYS PRIOR TO CONTRACTOR'S ORDER
NEED DATE
LONG LEAD ITEMS LIST (LLIL) WITH
EDFP AND DLIS SCREENING RESULTS
CONTR
NLT 30 DAYS AFTER RELEASE FOR FABRICATION OR
PROCUREMENT OF
NLT 90 DAYS PRIOR TO CONTRACTOR'S ORDER
NEED DATE
NLT 30 DAYS PRIOR TO CONTRACTOR'S ORDER
NEED DATE
CONTRACT MAILING DATE
NLT 45 DAYS AFTER MAILING DATE OF CONTRACT
SUBMIT TO DLSC NOT EARLIER THAN 30 DAYS PRIOR
TO SUBMITTING PTD
N/A
CONTR
a. CANDIDATE LIST
c. CONTRACTOR PROCUREMENT
SCHEDULE LOGISTICS PRODUCT DATA,
EDFP SCREENING
e. PIOs RELEASED TO CONTRACTOR
b. SELECTED ITEM NOTIFICATION
d. SPARES PROVISIONING
CONFERENCE
NLT 165 DAYS PRIOR TO CONTRACTOR'S ORDER
NEED DATE
DATE OF LAST
DELIVERY
REMARKS (Continue on reverse)
EVENT TIMING CALENDAR DATE
CONTRACT AWARD
PROVISIONING GUIDANCE
CONFERENCE
DLIS SCREENING
SAIP
NUMBER DATE
CONTRACTOR
DATE OF FIRST
DELIVERY REVISION
PROVISIONING PERFORMANCE SCHEDULE OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate of Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) , Washington, DC 20503. Please do not return your forms to either of these addresses. Completed form will be included in response to invitation for Bid or Request for Proposal.
END ARTICLE
END ARTICLE DELIVERY DATES SOLICITATION OR CONTRACT NUMBER TYPE OF CONTRACT
EMD PROD
EMD W/PROD OPT
AFMC FORM 718, APR 94 (EF - 1 FORMFLOW) REPLACES AFMC FORM 18, JUL 92 WHICH IS OBSOLETE
N/A N/A
N/A
N/A
ATTACHMENT 2
DATA PRODUCT SELECTION SHEET
LOGISTICS PRODUCT DATA
THIS SHEET DOES NOT SPECIFY PROVISIONING LISTS TO BE DELIVERED. ACTUAL PROVISIONING LISTS TO BE DELIVERED SHALL BE AS SPECIFIED ON CONTRACT. SHEET HAS BEEN COMPLETED TO REFLECT DATA
ELEMENT REQUIREMENT BY TYPE OF PTD.
CARD CC DATA PRODUCT TITLE L
L
T
I
L
PPL
RIB
S
F
P
P
L
C
B
I
L
D
C
N
ADDITIONAL
INFORMATION
A-L 1-6 PROVISIONING CONTRACT
CONTROL NR (PCCN)
X X X X X SEE NOTE 1
A-L 7-11 PROVISIONING LINE ITEM
SEQUENCE NR (PLISN)
X X X X X SEE NOTE 2
A-L 12 TYPE OF CHANGE CODE (TOCC) X SEE NOTE 3
A 13 INDENTURE X X Use Option 4
A 14-18 COMMERCIAL AND
GOVERNMENT ENTITY (CAGE)
X X X X X SEE NOTE 4
A 19-50 REFERENCE NR (FPRN) X X X X X
A 51 REFERENCE NR CATEGORY
CODE (RNCC)
X X X X X
A 52 REFERENCE NR VARIATION
CODE (RNVC)
X X X X X
A 55 ESSENTIALITY CODE (EC) X X X X X
A 56-74 ITEM NAME X X X X X
A 75 SHELF LIFE X X X X X
A-L 78-80 CARD SEQUENCE NR (CSN) &
CARD FORMAT INDICATOR (CFI)
X X X X X SEE NOTE 5
Not in LMI
B 13-32 NATIONAL STOCK NUMBER
(NSN) AND RELATED DATA
X X X X X SEE NOTE 6
B 45-46 UNIT OF ISSUE (UI) X X X X X SEE NOTE 7
B 47-56 UNIT OF ISSUE PRICE X X X X X SEE NOTE 7
B 62-64 QUANTITY UNIT PACK (QUP) X X X X X
B 65-70 SOURCE/MAINT/RECOVER-
ABILITY (SMR) CODE
X X X X X SEE NOTE 8
B 71 DEMILITARIZATION CODE (DMIL)
B 72-73 PRODUCTION LEAD TIME (PLT) X X X X X
B 74 HARDNESS CRITICAL ITEM (HCI)
B 75 CONTROLLED ITEM INVENTORY
CODE (CIIC)
X X X X X
B 76 PRECIOUS METALS INDICATOR
CODE (PMIC)
X X X X X
B 77 AUTOMATED DATA PROCESS-
ING EQUIPMENT CODE (ADPEC)
X X X X X
C 13-17 NEXT HIGHER ASSEMBLY PLISN
(NH PLISN)
X X
C 19-21 OVERHAUL REPLACEMENT
RATE (ORR)
X X X X X SEE NOTE 9
C 22-25 QTY PER ASSEMBLY (QPA) X X X X X SEE NOTE 10
C 26-30 QTY PER END ITEM (QPEI) X X X X X SEE NOTE 11
C 31-38 MAINTENANCE REPLACEMENT
RATE 1 (MRRI)
X X X X X SEE NOTE 9
C 54-59 TOTAL QTY RECOMMENDED X X X X X SEE NOTE 12
C 60-64 SAME AS PLISN (SPLISN) X X SEE NOTE 13
C 65-69 PRIOR ITEM PLISN (PPLISN) X X X SEE NOTE 14
C 70-73 MAXIMUM ALLOWABLE
OPERATING TIME (MAOT)
X X X X X
C 74 MAINT ACTION CODE (MAC) X X X X
C 75-77 NOT REPAIRABLE THIS
STATION (NRTS)
X X X X X SEE NOTE 9
D 13-20 USEABLE ON CODE (UOC) X X X X X SEE NOTE 15
D 21-52 REFERENCE DESIGNATION X X X X SEE NOTE 16
D 53 REFERENCE DESIGNATION
OVERFLOW CODE (RDOC)
X X X X
D 54 REFERENCE DESIGNATOR
CODE (RDC)
X X X X
D 55 SPECIAL MATERIAL CONTENT
CODE (SMCC)
X X X X X
D 56 PROVISIONING LIST CATEGORY
CODE (PLCC)
X X X X X SEE NOTE 17
D 57 SPECIAL MAINTENANCE ITEM
CODE (SMIC)
X X X X X
E 23-24 CONDEMNATION BELOW
DEPOT (CBD)
X X X X X SEE NOTE 9
E 25-26 CONDEMNATION AT DEPOT
(CAD)
X X X X X SEE NOTE 9
E 27-44 REPAIR CYCLE TIME OPTION 1 X X X X SEE NOTE 18
E 72-73 CONTRACTOR TECHNICAL
INFORMATION CODE (CTIC)
X X X X X SEE NOTE 19
F 13-27 CHANGE AUTHORITY NUMBER X SEE NOTE 20
F 28-29 INTERCHANGEABILITY CODE
(IC)
X
F 30-49 SERIAL NUMBER EFFECTIVITY X SEE NOTE 21
F 52-56 REPLACED/SUPERSEDING
PLISN (R/SPLISN)
X
F 58-63 QUANTITY SHIPPED X
F 64-69 QUANTITY PROCURED X
G 28-33 PRORATED EXHIBIT LINE ITEM
NR (ELIN)
X SEE NOTE 22
G 34-39 PRORATED QUANTITY X
H 33-77 PROVISIONING REMARKS X X X X X
J 30-40 WORK UNIT CODE (WUC) SEE NOTE 23
01L 26 INITIAL SPARES SUPPORT
LISTING (ISSL)
X X X X X SEE NOTE 24
Not in LMI
01L 27 SPECIAL ITEM CODE (SI) X X X X X SEE NOTE 25
Not in LMI
NOTES:
1. PCCN. To be provided by PPA during PGC and as needed.
2. PLISN. Contractor resequencing of previously submitted PTD to the Government cannot be accepted by the D220 System. A provisioning plan that will preclude resequencing PTD will be decided at the PGC.
3. TOCC. Used with type PTD “D” only. Additional guidance for TOCC will be provided during PGC.
4. CAGE Code. Guidance for obtaining CAGE Code may be provided at the PGC if required.
5. Card Sequence Number (CSN) and Card Format Indicator (CFI). CSN is a two position numeric code, e.g., 01, 02, etc., as required in CC 78-79. CFI is a one position alpha code in CC 80. Mandatory entries.
6. NSN and Related Data. If NSN is unknown, enter a Federal Supply Class (FSC) recommendation in CC 16-19 per Cataloging Handbook H-2/H-6. FSC recommendation is required on all items regardless of SMR code, type PTD, or indenture code.
7. Unit of Issue (UI) Price shall be the best estimated price per unit of issue for each item based on the total recommended quantity, taking into consideration the quantity per unit pack and Programming Checklist (PCL) data. The Contractor shall provide, if known, any existing price break for particular batches or economical order quantities, in the remarks block or as directed by the PPA.
8. Acceptable SMR codes are contained in Technical Order 00-25-195. Handouts for acceptable SMR codes will be provided at PGC.
9. MRRI, ORR, NRTS, CAD, and CBD factors for Federal Supply Groups (FSGs) 53 and 59 (except 5955) are not required when non-repairable SMR codes are recommended.
10. QPA. Option 1 will be used. “V” (variable) and “A” or “AR” (as required) are not acceptable entries for the D220 System. Entry must be numeric and >0.
11. QPEI. Option 1 will be used. “V” (variable) and “AR” (as required) are not acceptable entries. Entry must be numeric and > 0 for first appearance. NOTE: If “REF” is entered in QPEI, CC 26-30, the “Same as PLISN” should be entered in CC 60-64.
12. Total Quantity Recommended. Enter recommended quantity only on the non-stocklisted repairable items which are SMR coded as procurable. Unless advised otherwise by the PPA, when SMR is procurable, field must be blank or filled with a quantity greater than 0. NOTE: If the contractor is aware that a minimum buy quantity exists, the recommended quantity block should reflect the minimum buy. In the remarks block, annotate, “MIN BUY”.
13. SPLISN. If SPLISN is entered, QPEI must reflect “REF” in CC 26-30.
14. PPLISN. When PPLISN is entered, the remarks block should reflect the PCCN and SCC where the PPLISN appears. Entry limited to PLISNS for same reference number previously submitted on LLIL PTD on current contract.
15. UOC. To be determined at PGC. Contractor should be prepared to make recommendations at the
PGC.
16. Reference Designation. Compression (gang listing) of reference designators under one PLISN is allowed. Specific details for reference designators to be determined at the PGC.
17. PLCC. Contractor installed Government Furnished Equipment (GFE) will appear in the PTD as a single line item entry without a breakdown and will be identified by an “A” in CC 56 of the “D” card.
18. Repair Cycle Time. Details to be determined at the PGC. Only sixth subfield (CC42-44) used for provisioning. If required, Option 1 will be used unless otherwise directed by the PPA.
19. CTIC. Only first position shall be used to enter Breakout code.
20. Change Authority Number. For design changes which result from an Engineering Change requiring approval of the configuration control authority, change authority block will reflect the approved Engineering Order (EO) number or other applicable approval authority. For changes without such approval, the change authority block in the PTD will be left blank and the reason for the change identified in the remarks block.
21. Serial Number Effectivity. Serial number effectivity FROM (CC 30-39) and TO (CC 40-49) limited to thirty (30) breaks in serial number per basic line item. Additional “F” card required for each break in serial numbers.
22. Prorated ELIN. When authorized by the Government, the contractor may utilize an ELIN suffix on ELINs previously assigned by the PPCO or by the D220 System when submitting DCNs. If the proration is a result of a design change, enter the new “Prorated “TO” ELIN” in the PTD as instructed by the PPA.
23. Work Unit Code. AF uses only CC 30-34. CC 35-49 to be left blank.
24. ISSL. One alpha position (use one of the following codes):
CODE DEFINITION
X ISSL
A Air Training Command S Special Purpose Recoverable Authorized to Maintain (SPRAM)
25. Special Item Code. One alpha position:
CODE DEFINITION
W Warranty Item
SUBMISSION DATE OF LIST
PCCN PIIN / SPIIN MODEL OR TYPE NUMBER CONTROL DATA PRIME CAGE CONTROL CODE YR MO DA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
PCCN PLISN
T
O
C
C
I
N
D
C
D CAGE
REFERENCE NUMBER AND REFERENCE NUMBER OVERFLOW
ADDITIONAL REFERENCE NUMBER
R
N
C
C
R
N
V
C
E
C ITEM NAME
S
L CSN A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
NATIONAL STOCK NUMBER AND RELATED DATA A
T FSC NIIN MMAC D C P D
O M H I M P
C I C I I E
PCCN PLISN C UI UI PRICE QUP SMR L PLT I C C C CSN B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
T
O TOTAL PRIOR M
C NHA QTY PER QTY PER QUANTITY SAME AS ITEM A
PCCN PLISN C PLISN ORR ASSY EI MRRI RECOMMENDED PLISN PLISN MAOT C NRTS CSN C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
T S P S
O R M L M
C USABLE ON D C C I
PCCN PLISN C CODE REFERENCE DESIGNATION C C C C CSN D
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
T MAINTENANCE TASK DISTRIBUTION REPAIR CYCLE TIME C
O CBD CAD O F H SRA D CON T
C I
PCCN PLISN C C CSN E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
SERIAL NUMBER EFFECTIVITY
T FROM TO
O REPLACED OR
C SUPERCEDING QUANTITY QUANTITY
PCCN PLISN C CHANGE AUTHORITY NUMBER IC PLISN SHIPPED PROCURED CSN F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
T
O
C PRORATED PRORATED
PCCN PLISN C ELIN QUANTITY CSN G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
T
O
C
PCCN PLISN C REMARKS CSN H
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
T
O
C
PCCN PLISN C WUC / TM FGC CSN J
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
T I
O S
C S S
PCCN PLISN C L I O1 L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
PROVISIONING TECHNICAL DOCUMENTATION (PTD) FORMAT Atch 3
PROVISIONING TECHNICAL DOCUMENTATION (PTD) FORMAT Atch 3
PROVISIONING STATEMENT OF WORK (SOW)
Contractor shall identify and recommend logical spare/repair parts sufficient to meet system/equipment operation and supportability in accordance with the Air Force Initial
Provisioning Performance Specification (IPPS). GEIA-HB-0007B (Logistics Product Data
Handbook) should be used as a guide. Format must be consistent with existing government
Provisioning data system (D220). The following Data Item Descriptions (DIDs) apply:
DI-SESS-81758A/T Logistics Product Data Specific Logistics Product Data to be submitted:
- Provisioning Parts (PPL)
- Long Lead Items List (LLIL)
- Supplemental Data for Provisioning
- Design Change Notices (DCNs)
- Statement of Prior Submission (SPS)
DI-SESS-81874 Engineering Data For Provisioning (EDFP).
- Supplemental Data for Provisioning
PROVISIONING STATEMENT OF OBJECTIVE (SOO)
The objective is for the contractor to identify and recommend logical spare/repair parts sufficient to meet system/equipment operation and supportability objectives in accordance with the Air Force Initial Provisioning Performance Specification
(IPPS) and Contract Data Requirements List(s) (CDRLs).
| C010_Logistics Product Data - 144kW GPU.pdf |
| DD1423-CDRL-(Logistics Product Data) GPU2.Revised |
| SUMMARY LOGISTICS DATA PRODUCTS WRKSHT |
| IPPS DTD 3 SEP 2013 |
| IPPS - ATCH # 1 (AFMC 718) Prov Perf Sched |
| IPPS - ATCH # 2 (DATA PRODUCT SELECTION SHEET) |
| IPPS - ATCH # 3 (PTD FORMAT) |
| Provisioning SOW |
| STATEMENT OF OBJECTIVE |
| 2021-09-08T16:44:40-0400 | |
| HOGAN.JASON.H.1247029288 |
File details come from the government source that posted it. Updated .