RFP Attachment 5 - Relevancy Table - Revised.pdf

PDF 161 KB Posted

Attached to
Ground Power Modernization Federal contract opportunity
Solicitation number
FA8532-22-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains a pre-solicitation notice and attachment for a forthcoming request for proposal from the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base. The solicitation will seek firm-fixed-price and cost reimbursement contracts for 72kW ground power units, 144kW ground power units, and 144kW universal load banks to be used at Air Force bases. The notice outlines technical requirements for the equipment including power output capabilities and operating environments. The attachment is a relevancy table for offerors to detail past performance on similar projects. The pre-solicitation targets release of the RFP on October 15, 2021 and award by September 26, 2022. Interested parties are instructed to notify listed points of contact to receive updates and submit any questions in writing.

View the file

Other files for this federal contract opportunity

Other files attached to Ground Power Modernization, newest first.
File Type Posted
GPM_JA_(400_Hz_Power_Cable_Assembly)_Redacted.pdf PDF
Question and Answer 6.docx DOCX document
FA8532-22-R-0001_0003.pdf PDF
Pre-Proposal Conference Follow-Up.docx DOCX document
Extraction from RFP Attachment 10_Columns A thru D only.xlsx XLSX spreadsheet
Pre-Proposal Conference Brief Re-upoload.pptx PPTX presentation
Pre-Proposal Conference Brief.pptx PPTX presentation
Question and Answer 4.docx DOCX document
FA8532-22-R-0001_0002.pdf PDF
RFP Attachment 5 - Relevancy Table - Revised.pdf PDF
RFP Attachment 10 - Price Spreadsheet - Revised.xlsx XLSX spreadsheet
Question and Answer 2.docx DOCX document
Statement of Work (SOW)_1 Sep 21.pdf PDF
L-900 Instructions to Offerors.pdf PDF
Ground Power Modernization Ordering Guide.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet.pdf PDF
D003_TM86-01R.pdf PDF
D004_TM86-01R.pdf PDF
E009.pdf PDF
D001.pdf PDF
C009.pdf PDF
C007.pdf PDF
F001.pdf PDF
E001.pdf PDF
C001.pdf PDF
B002.pdf PDF
A002.pdf PDF
C015.pdf PDF
200415485_98752_EDL.pdf PDF
FA8532-22-R-0001.pdf PDF
Pre-Proposal Conference.docx DOCX document
Packaging and Marking Requirements_AFMC 158.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
M-900 Evaluation Basis for Award.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
RFP Attachment 4 Instructions.docx DOCX document
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
D001_TM86-01R.pdf PDF
E006.pdf PDF
E003.pdf PDF
D006.pdf PDF
E002.pdf PDF
B001.pdf PDF
D003.pdf PDF
C008.pdf PDF
C003.pdf PDF
2020111299_98752_InputCable.pdf PDF
RFP Attachment 5 - Relevancy Table.pdf PDF
Warranty Tracking Information.pdf PDF
Show all 50

Ground Power Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP FA8532-22-R-0001

ATTACHMENT 5

PRESENT/PAST PERFORMANCE RELEVANCY TABLE

(To be Completed by Offeror/Joint Venture Member/Critical Subcontractor) (Complete for each effort identified for evaluation in the PPI Tool)

Request the offeror/joint venture member/critical subcontractor complete a separate Relevancy Table for each effort identified for evaluation in the PPI Tool. There are two tables within this RFP attachment; one table for Group A proposala submissions, and one table for Group B proposal submissions. The offeror/joint venture member/critical subcontractor shall only fill in the applicable table for the group the effort is being submitted for. This table, in addition to the information provided by the offeror in the PPI Tool, will assist the Government in evaluating the relevancy of the proposed effort to the instant requirements. Offerors/joint venture members/critical subcontractors shall only complete column two. Offerors’/joint venture members’/critical subcontractors’ answers are applicable only to the efforts identified in the PPI Tool, not the offeror’s proposed solutions to the instant effort. Please be as specific as possible with the fill-in information provided. In addition to the information provided in the PPI Tool and within the Relevancy Table, the offeror is requested to provide data/specification sheets and copies of certifications and/or approvals (if applicable) as attachments to this Relevancy Table for each effort.

Contractor:

Cage Code:

Contract Number:

Program Title:

Contr Agency/Customer:

GROUP A

Technical Complexities

Category (Government has completed this column)

DO NOT CHANGE

Fill-in for the Effort Identified Above (Offeror/joint venture member/critical subcontractor completes)

Design, Manufacture, Test, and Sale of:

Generator Sets AND/OR Loadbanks

OR

Power plants/generator sets/frequency converters/inverters AND/OR loadbanks

Production and sales of:

Portable A.C. loadbank, D.C. loadbank

OR

Any type of military/commercial complex ground support equipment

Operation (source or sink) between power levels of:

72 kW/90 kVA and 250 kW/312 kVA

OR

60 kW/75 kVA and 250 kW/312 kVA

Generator set: F-22 and/or F-35 mobile equipment certification (i.e., multi-phase testing involving both a Systems Integration Laboratory and live aircraft) and approval

OR

Power plants/generator sets/frequency converters/inverters: military aircraft approval

Multiple types of aircraft power inputs or outputs (i.e., 400Hz, 28.5 VDC, and/or 270 VDC)

Multiple quantities of aircraft power inputs or outputs

Simultaneous aircraft power inputs or outputs

Air transportable by military cargo aircraft

Ambient operating temperature range of at least:

-25°F to +125°F

0°F to +120°F

Enhanced corrosion protection (i.e.

powder coating, metal wire arc spray, galvanizing, etc. –corrosion protection systems other than liquid primers and paints)

SAE AS 8090 mobility (i.e., four wheel, Ackerman steering, leaf spring, towable, chassis with automotive style parking brake)

OR

Military style mobility (i.e., four wheels, Ackerman steering, any type of springs, chassis, automotive style parking brake)

OR

Any type of rolling mobile chassis

Hard mounted forklift mobile enclosures suitable for outdoor use

Multiple modes of operation (i.e., initial source of power derived from diesel engine or utility grid)

Diesel engine directly coupled to a rotating 60 Hz A.C. machine

OR

Diesel engine coupled to any style rotating three phase A.C. machine

OR

Multi-fuel capable diesel engine powering any type of on-board (attached) solid state or rotating machinery (i.e. power generation/conversion/inversion, pre-conditioned air, hydraulics, pneudraulics, pneumatics, liquid cooling, etc.)

Solid state power conversion/inversion

Commercial or military aviation solid state power conversion/inversion equipment

Logistical/Programmatic Scope and Magnitude

FFP, CRNF contract types

Quantities: 250 each 144 kW GPUs;

300 each Universal Loadbanks;

approximately 1,464 each 72 kW GPUs o 144 kW – 5 per month o 144 kW ULB – 5 per month o 72 kW – 16 per month

Ten (10) year contract

Estimated dollar value not releaseable

Data deliverables: Operations & Maintenance Manual with Illustrated Parts Breakdown, Provisioning Data, Test Plans, Test Reports, Test Procedures, Design Analysis, Software Assurance Evaluation Report

Type and Complexity of Testing:

Developmental Test and Evaluation (contractor’s in-plant testing, external laboratory testing for EMI, environmental, mobility, etc.; aircraft simulator testing;

aircraft and/or equipment compatibility testing) and Operational Testing and Evaluation (user testing)

GROUP B

Technical Complexities

Category (Government has completed this column)

DO NOT CHANGE

Fill-in for the Effort Identified Above (Offeror/joint venture member/critical subcontractor completes)

Design, Manufacture, Test, and Sale of:

Generator Sets

OR

Power plants/generator sets/frequency converters/inverters

Production and sales of:

Any type of military/commercial complex ground support equipment

Operation between power levels of:

72 kW/90 kVA and 250 kW/312 kVA

60 kW/75 kVA and 250 kW/312 kVA

Generator set: F-22 and/or F-35 mobile equipment certification (i.e., multi-phase testing involving both a Systems Integration Laboratory and live aircraft) and approval

OR

Power plants/generator sets/frequency converters/inverters: military aircraft approval

Multiple types of aircraft power outputs (i.e., 400Hz, 28.5 VDC, and/or 270

VDC)

Multiple quantities of aircraft power outputs

Simultaneous aircraft power outputs

Air transportable by military cargo aircraft

Ambient operating temperature range of at least:

-25°F to +125°F

0°F to +120°F

Enhanced corrosion protection (i.e.

powder coating, metal wire arc spray, galvanizing, etc. –corrosion protection systems other than liquid primers and paints)

SAE AS 8090 mobility (i.e., four wheel, Ackerman steering, leaf spring, towable, chassis with automotive style parking brake)

OR

Military style mobility (i.e., four wheels, Ackerman steering, any type of springs, chassis, automotive style parking brake)

OR

Any type of rolling mobile chassis

OR

Hard mounted forklift mobile enclosures suitable for outdoor use

Multiple modes of operation (i.e., initial source of power derived from diesel engine or utility grid)

Diesel engine directly coupled to a rotating 60 Hz A.C. machine

OR

Diesel engine coupled to any style rotating three phase A.C. machine

OR

Multi-fuel capable diesel engine powering any type of on-board (attached) solid state or rotating machinery (i.e. power generation/conversion/inversion, pre-conditioned air, hydraulics, pneudraulics, pneumatics, liquid cooling, etc.)

Solid state power conversion/inversion

Commercial or military aviation solid state power conversion/inversion equipment

Logistical/Programmatic Scope and Magnitude

FFP, CRNF contract types

Quantities: Approximately 1,464 each 72 kW GPUs o 72 kW – 15 per month Ten (10) year contract

Estimated dollar value not releaseable

Data deliverables: Operations & Maintenance Manual with Illustrated Parts Breakdown, Provisioning Data, Test Plans, Test Reports, Test Procedures, Design Analysis, Software Assurance Evaluation Report

Type and Complexity of Testing:

Developmental Test and Evaluation (contractor’s in-plant testing, external laboratory testing for EMI, environmental, mobility, etc.; aircraft simulator testing; aircraft and/or equipment compatibility testing) and Operational Testing and Evaluation (user testing)

Was this contract effort (as identified above) submitted as a past performance source of data for a previous Robins AFB procurement. Yes No . If yes, identify the buyer and/or contracting officer, their phone number and office symbol and solicitation number of the procurement for which this effort was submitted.

Please identify all attachments (data/specification sheets, certifications/approvals, etc.):

File details come from the government source that posted it. Updated .