Extraction from RFP Attachment 10_Columns A thru D only.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- Ground Power Modernization Federal contract opportunity
- Solicitation number
- FA8532-22-R-0001
About this file
This document outlines a solicitation for ground power equipment modernization. The Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base is seeking proposals for multiple award IDIQ contracts to provide 72kW ground power units, 144kW ground power units, and 144kW universal load banks. The solicitation will be released on October 15, 2021 with anticipated award by September 26, 2022. The contracts will have a three-year basic ordering period and seven additional one-year ordering periods, for a total performance period of ten years. Estimated quantities are 2928 units for the 72kW GPU, 250 units for the 144kW GPU, and 300 units for the 144kW load bank. Proposals are due in accordance with instructions that will be provided in the forthcoming RFP. The solicitation involves both full and open competition as well as a small business set-aside.
View the file
Other files for this federal contract opportunity
Show all 50
Ground Power Modernization has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Group A
| Extraction from RFP Attachment 10, Price Spreadsheet |
| Solicitation FA8532-22-R-0001 |
| Group A |
| Offeror: | |||
| ORDERING PERIOD I | |||
| BASIC Contract Period (36 Months) | |||
| CLIN | Type | Description | Qty/BEQ |
| 0001 | FFP | 144kW GPU First Article | |
| 0001AA | FFP | First Article Units | 6 |
| 0001AB | FFP | NRE against CLIN 0001AA, to include testing costs | 1 |
| 0002 | FFP | 72kW GPU First Article | |
| 0002AA | FFP | First Article Units | 6 |
| 0002AB | FFP | NRE against CLIN 0002AA, to include testing costs | 1 |
| 0003 | FFP | Universal Load Bank First Article | |
| 0003AA | FFP | First Article Units | 8 |
| 0003AB | FFP | NRE against CLIN 0003AA, to include testing costs | 1 |
| 0004 | Data | ||
| 0004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 0004AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 0004AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 0004AD | FFP | TECHNICAL REPORT-STUDY SERVICES (B001) | 1 |
| 0004AE | FFP | TECHNICAL REPORT-STUDY SERVICES (Test readiness review documentation package) (B002) | 1 |
| 0004AF | NSP | SYSTEM SAFETY PROGRAM PLAN (C001) | 1 |
| 0004AG | NSP | SYSTEM SAFETY HAZARD ANALYSIS REPORT (C002) | 1 |
| 0004AH | NSP | CORROSION PREVENTION AND CONTROL PLAN (C003) | 1 |
| 0004AJ | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 0004AK | NSP | TECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005) | 1 |
| 0004AL | NSP | RISK MANAGEMENT FRAMEWORK (RMF) (C006) | 1 |
| 0004AM | NSP | SOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007) | 1 |
| 0004AN | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 0004AP | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 0004AQ | FFP | LOGISTICS PRODUCT DATA (C010) | 1 |
| 0004AR | FFP | ENGINEERING DATA FOR PROVISIONING (C011) | 1 |
| 0004AS | FFP | LOGISTICS PRODUCT DATA - 72 kW GPU (C012) | 1 |
| 0004AT | FFP | ENGINEERING DATA FOR PROVISIONING - 72 kW GPU (C013) | 1 |
| 0004AU | FFP | LOGISTICS PRODUCT DATA - 144 kW ULB (C014) | 1 |
| 0004AV | FFP | ENGINEERING DATA FOR PROVISIONING - 144 kW ULB (C015) | 1 |
| 0004AW | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 144 kW GPU (D001) | 1 |
| 0004AX | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 72 kW GPU (D002) | 1 |
| 0004AY | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 144 kW ULB (D003) | 1 |
| 0004AZ | FFP | TRAINING MATERIAL (D005) | 1 |
| 0004BA | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 0004BB | FFP | TECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001) | 1 |
| 0004BC | FFP | FIRST ARTICLE TEST PLAN (E002) | 1 |
| 0004BD | FFP | FIRST ARTICLE TEST PROCEDURE (E003) | 1 |
| 0004BE | FFP | TEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004) | 1 |
| 0004BF | FFP | TEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005) | 1 |
| 0004BG | FFP | TEST-INSPECTION REPORT (144kW FIRST CONNECT TEST REPORT) (E006) | 1 |
| 0004BH | FFP | TEST-INSPECTION REPORT (ULB FIRST CONNECT TEST REPORT) (E007) | 1 |
| 0004BJ | NSP | PRODUCTION ACCEPTANCE TEST PROCEDURE (E008) | 1 |
| 0004BK | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 0004BL | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 0004BM | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 0004BN | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 0005 | CRNF | Travel | 1 |
| 0006 | FFP | Post Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference | 1 |
| 0007 | FFP | 144kW GPU LRIP Production Units | |
| 1-10 | 10 | ||
| 11-16 | 6 | ||
| 16 | |||
| 0008 | FFP | 72kW GPU LRIP Production Units | |
| 1-10 | 10 | ||
| 11-17 | 7 | ||
| 17 | |||
| 0009 | FFP | Universal Load Bank LRIP Production Units | |
| 1-10 | 10 | ||
| 11-16 | 6 | ||
| 16 | |||
| 0010 | TBN | LRU Spares | 1 |
| ORDERING YEAR I (12 MONTHS) Full-rate | |||
| CLIN | Type | Description | Qty/BEQ |
| 1001 | FFP | 144kW GPU Production Units | |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-64 | 14 | ||
| 64 | |||
| 1002 | 72kW GPU Production Units (266) | ||
| 1002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 266 = 66) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-66 | 16 | ||
| 66 | |||
| 1002AB | FFP | 72kW GPU Competitive Quantity (.50 x 266 = 133) | |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-133 | 33 | ||
| 133 | |||
| 1003 | FFFP | Universal Load Bank Production Units | |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-60 | 10 | ||
| 60 | |||
| 1004 | Data | ||
| 1004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 1004AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 1004AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 1004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 1004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 1004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 1004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 1004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 1004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 1004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 1004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 1005 | CRNF | Travel | 1 |
| 1006 | TBN | LRU Spares | 1 |
| ORDERING YEAR II (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 2001 | FFP | 144kW GPU Production Units | |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-66 | 16 | ||
| 66 | |||
| 2002 | 72kW GPU Production Units (480) | ||
| 2002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 480 = 120) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-120 | 20 | ||
| 120 | |||
| 2002AB | FFP | 72kW GPU Competitive Quantity (.50 x 480 = 240) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51 - 100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 201-240 | 40 | ||
| 240 | |||
| 2003 | FFP | Universal Load Bank Production Units | |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-60 | 10 | ||
| 60 | |||
| 2004 | Data | ||
| 2004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 2004AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 2004AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 2004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 2004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 2004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 2004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 2004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 2004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 2004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 2004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 2005 | CRNF | Travel | 1 |
| 2006 | TBN | LRU Spares | 1 |
| OPTION I | |||
| ORDERING PERIOD II | |||
| ORDERING YEAR III (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 3001 | FFP | 144kW GPU Production Units | |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-54 | 4 | ||
| 54 | |||
| 3002 | FFP | 72kW GPU Production Units (440) | |
| 3002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 440 = 110) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-110 | 10 | ||
| 110 | |||
| 3002AB | FFP | 72kW GPU Competitive Quantity (.50 x 440 = 220) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51-100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 201-220 | 20 | ||
| 220 | |||
| 3003 | FFP | Universal Load Bank Production Units | |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-60 | 10 | ||
| 60 | |||
| 3004 | Data | ||
| 3004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 3004AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 3004AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 3004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 3004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 3004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 3004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 3004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 3004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 3004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 3004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 3005 | CRNF | Travel | 1 |
| 3006 | TBN | LRU Spares | 1 |
| ORDERING YEAR IV (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 4001 | FFP | 144kW GPU Production Units | |
| 1-10 | 10 | ||
| 11-36 | 26 | ||
| 36 | |||
| 4002 | FFP | 72kW GPU Production Units (432) | |
| 4002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-108 | 8 | ||
| 108 | |||
| 4002AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51 - 100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 201-216 | 16 | ||
| 216 | |||
| 4003 | FFP | Universal Load Bank Production Units | |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-60 | 10 | ||
| 60 | |||
| 4004 | Data | ||
| 4004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 4004AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 4004AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 4004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 4004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 4004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 4004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 4004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 4004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 4004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 4004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 4005 | CRNF | Travel | 1 |
| 4006 | TBN | LRU Spares | 1 |
| ORDERING YEAR V (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 5001 | FFP | 144kW GPU Production Units | 8 |
| 5002 | FFP | 72kW GPU Production Units (432) | |
| 5002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-108 | 8 | ||
| 108 | |||
| 5002AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51 - 100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 201-216 | 16 | ||
| 216 | |||
| 5003 | FFP | Universal Load Bank Production Units | |
| 1-10 | 10 | ||
| 11-36 | 26 | ||
| 36 | |||
| 5004 | Data | ||
| 5004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 5004AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 5004AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 5004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 5004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 5004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 5004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 5004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 5004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 5004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 5004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 5005 | CRNF | Travel | 1 |
| 5006 | TBN | LRU Spares | 1 |
| ORDERING YEAR VI (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 6002 | FFP | 72kW GPU Production Units (432) | |
| 6002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-108 | 8 | ||
| 108 | |||
| 6002AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51 - 100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 201-216 | 16 | ||
| 216 | |||
| 6004 | Data | ||
| 6004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 6004AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 6004AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 6004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 6004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 6004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 6004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 6004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 6004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 6004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 6004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 6005 | CRNF | Travel | 1 |
| 6006 | TBN | LRU Spares | 1 |
| ORDERING YEAR VII (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 7002 | FFP | 72kW GPU Production Units (400) | |
| 7002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 400 = 100) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 100 | |||
| 7002AB | FFP | 72kW GPU Competitive Quantity (.50 x 400 = 200) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51 - 100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 200 | |||
| 7004 | Data | ||
| 7004AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 7004AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 7004AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 7004AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 7004AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 7004AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 7004AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 7004AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 7004AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 7004AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 7004AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 7005 | CRNF | Travel | 1 |
| 7006 | TBN | LRU Spares | 1 |
Group B
| Extraction from RFP Attachment 10, Price Spreadsheet |
| Solicitation FA8532-22-R-0001 |
| Group B |
| Offeror: | |||
| ORDERING PERIOD I | |||
| BASIC Contract Period (36 Months) | |||
| CLIN | Type | Description | Qty/BEQ |
| 0011 | FFP | 72kW GPU First Article | |
| 0011AA | FFP | First Article Units | 6 |
| 0011AB | FFP | NRE against CLIN 0002AA, to include testing costs | 1 |
| 0012 | Data | ||
| 0012AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 0012AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 0012AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 0012AD | FFP | TECHNICAL REPORT-STUDY SERVICES (B001) | 1 |
| 0012AE | FFP | TECHNICAL REPORT-STUDY SERVICES (Test readiness review documentation package) (B002) | 1 |
| 0012AF | NSP | SYSTEM SAFETY PROGRAM PLAN (C001) | 1 |
| 0012AG | NSP | SYSTEM SAFETY HAZARD ANALYSIS REPORT (C002) | 1 |
| 0012AH | NSP | CORROSION PREVENTION AND CONTROL PLAN (C003) | 1 |
| 0012AJ | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 0012AK | NSP | TECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005) | 1 |
| 0012AL | NSP | RISK MANAGEMENT FRAMEWORK (RMF) (C006) | 1 |
| 0012AM | NSP | SOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007) | 1 |
| 0012AN | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 0012AP | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 0012AQ | FFP | LOGISTICS PRODUCT DATA - 72 kW GPU (C016) | 1 |
| 0012AR | FFP | ENGINEERING DATA FOR PROVISIONING - 72 kW GPU (C017) | 1 |
| 0012AS | FFP | AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - Group B (D004) | 1 |
| 0012AT | FFP | TRAINING MATERIAL (D005) | 1 |
| 0012AU | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 0012AV | FFP | TECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001) | 1 |
| 0012AW | FFP | FIRST ARTICLE TEST PLAN (E002) | 1 |
| 0012AX | FFP | FIRST ARTICLE TEST PROCEDURE (E003) | 1 |
| 0012AY | FFP | TEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004) | 1 |
| 0012AZ | FFP | TEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005) | 1 |
| 0012BA | NSP | PRODUCTION ACCEPTANCE TEST PROCEDURE (E008) | 1 |
| 0012BB | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 0012BC | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 0012BD | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 0012BE | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 0013 | CRNF | Travel | 1 |
| 0014 | FFP | Post Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference | 1 |
| 0015 | FFP | 72kW GPU LRIP Production Units | |
| 1-10 | 10 | ||
| 11-17 | 7 | ||
| 17 | |||
| 0016 | TBN | LRU Spares | 1 |
| ORDERING YEAR I (12 MONTHS) Full-rate | |||
| CLIN | Type | Description | Qty/BEQ |
| 1007 | 72kW GPU Production Units (266) | ||
| 1007AA | FFP | 72kW GPU Guarantee Quantity (.25 x 266 = 67) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-67 | 17 | ||
| 67 | |||
| 1007AB | FFP | 72kW GPU Competitive Quantity (.50 x 266 = 133) | |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-133 | 33 | ||
| 133 | |||
| 1008 | Data | ||
| 1008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 1008AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 1008AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 1008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 1008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 1008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 1008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 1008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 1008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 1008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 1008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 1009 | CRNF | Travel | 1 |
| 1010 | TBN | LRU Spares | 1 |
| ORDERING YEAR II (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 2007 | 72kW GPU Production Units (480) | ||
| 2007AA | FFP | 72kW GPU Guarantee Quantity (.25 x 480 = 120) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-120 | 20 | ||
| 120 | |||
| 2007AB | FFP | 72kW GPU Competitive Quantity (.50 x 480 = 240) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51 - 100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 201-240 | 40 | ||
| 240 | |||
| 2008 | Data | ||
| 2008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 2008AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 2008AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 2008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 2008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 2008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 2008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 2008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 2008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 2008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 2008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 2009 | CRNF | Travel | 1 |
| 2010 | TBN | LRU Spares | 1 |
| OPTION I | |||
| ORDERING PERIOD II | |||
| ORDERING YEAR III (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 3007 | FFP | 72kW GPU Production Units (440) | |
| 3002AA | FFP | 72kW GPU Guarantee Quantity (.25 x 440 = 110) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-110 | 10 | ||
| 110 | |||
| 3007AB | FFP | 72kW GPU Competitive Quantity (.50 x 440 = 220) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51-100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 201-220 | 20 | ||
| 220 | |||
| 3008 | Data | ||
| 3008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 3008AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 3008AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 3008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 3008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 3008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 3008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 3008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 3008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 3008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 3008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 3009 | CRNF | Travel | 1 |
| 3010 | TBN | LRU Spares | 1 |
| ORDERING YEAR IV (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 4007 | FFP | 72kW GPU Production Units (432) | |
| 4007AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-108 | 8 | ||
| 108 | |||
| 4007AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51 - 100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 201-216 | 16 | ||
| 216 | |||
| 4008 | Data | ||
| 4008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 4008AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 4008AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 4008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 4008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 4008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 4008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 4008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 4008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 4008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 4008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 4009 | CRNF | Travel | 1 |
| 4010 | TBN | LRU Spares | 1 |
| ORDERING YEAR V (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 5007 | FFP | 72kW GPU Production Units (432) | |
| 5007AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-108 | 8 | ||
| 108 | |||
| 5007AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51 - 100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 201-216 | 16 | ||
| 216 | |||
| 5008 | Data | ||
| 5008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 5008AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 5008AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 5008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 5008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 5008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 5008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 5008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 5008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 5008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 5008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 5009 | CRNF | Travel | 1 |
| 5010 | TBN | LRU Spares | 1 |
| ORDERING YEAR VI (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 6007 | FFP | 72kW GPU Production Units (432) | |
| 6007AA | FFP | 72kW GPU Guarantee Quantity (.25 x 432 = 108) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 101-108 | 8 | ||
| 108 | |||
| 6007AB | FFP | 72kW GPU Competitive Quantity (.50 x 432 = 216) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51 - 100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 201-216 | 16 | ||
| 216 | |||
| 6008 | Data | ||
| 6008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 6008AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 6008AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 6008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 6008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 6008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 6008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 6008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 6008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 6008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 6008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 6009 | CRNF | Travel | 1 |
| 6010 | TBN | LRU Spares | 1 |
| ORDERING YEAR VII (12 MONTHS) | |||
| CLIN | Type | Description | Qty/BEQ |
| 7007 | FFP | 72kW GPU Production Units (400) | |
| 7007AA | FFP | 72kW GPU Guarantee Quantity (.25 x 400 = 100) |
| 1-10 | 10 | ||
| 11-50 | 40 | ||
| 51-100 | 50 | ||
| 100 | |||
| 7007AB | FFP | 72kW GPU Competitive Quantity (.50 x 400 = 200) | |
| 1- 10 | 10 | ||
| 11 - 50 | 40 | ||
| 51 - 100 | 50 | ||
| 101-150 | 50 | ||
| 151-200 | 50 | ||
| 200 | |||
| 7008 | Data | ||
| 7008AA | NSP | CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001) | 1 |
| 7008AB | NSP | CONFERENCE AGENDA (A002) | 1 |
| 7008AC | NSP | CONFERENCE MINUTES (A003) | 1 |
| 7008AD | NSP | COUNTERFEIT PROTECTION PLAN (C004) | 1 |
| 7008AE | NSP | COMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008) | 1 |
| 7008AF | NSP | COMPUTER SOFTWARE PRODUCT END ITEMS (C009) | 1 |
| 7008AG | FFP | TRAINING MATERIAL - PACK-UP DATA (D006) | 1 |
| 7008AH | NSP | TEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009) | 1 |
| 7008AJ | TBN | ENGINEERING CHANGE PROPOSAL (ECP) (F001) | 1 |
| 7008AK | NSP | NOTICE OF REVISION (NOR) (F002) | 1 |
| 7008AL | NSP | REQUEST FOR VARIANCE (RFV) (F003) | 1 |
| 7009 | CRNF | Travel | 1 |
| 7010 | TBN | LRU Spares | 1 |
File details come from the government source that posted it. Updated .