Extraction from RFP Attachment 10_Columns A thru D only.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Ground Power Modernization Federal contract opportunity
Solicitation number
FA8532-22-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document outlines a solicitation for ground power equipment modernization. The Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base is seeking proposals for multiple award IDIQ contracts to provide 72kW ground power units, 144kW ground power units, and 144kW universal load banks. The solicitation will be released on October 15, 2021 with anticipated award by September 26, 2022. The contracts will have a three-year basic ordering period and seven additional one-year ordering periods, for a total performance period of ten years. Estimated quantities are 2928 units for the 72kW GPU, 250 units for the 144kW GPU, and 300 units for the 144kW load bank. Proposals are due in accordance with instructions that will be provided in the forthcoming RFP. The solicitation involves both full and open competition as well as a small business set-aside.

View the file

Other files for this federal contract opportunity

Other files attached to Ground Power Modernization, newest first.
File Type Posted
Question and Answer 8.docx DOCX document
Question and Answer 6.docx DOCX document
RFP Attachment 3 - List of Fill-In Clauses to be Completed - Revised 2.pdf PDF
FA8532-22-R-0001_0003.pdf PDF
FA8532-22-R-0001_0002.pdf PDF
Question and Answer 3.docx DOCX document
FA8532-22-R-0001_0001.pdf PDF
RFP Attachment 10 - Price Spreadsheet - Revised.xlsx XLSX spreadsheet
Question and Answer 2.docx DOCX document
Question and Answer 1.docx DOCX document
RFP Attachment 10 - Price Spreadsheet.xlsx XLSX spreadsheet
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed.pdf PDF
E005.pdf PDF
E004.pdf PDF
E008.pdf PDF
F002.pdf PDF
C005.pdf PDF
C002.pdf PDF
A003.pdf PDF
C017.pdf PDF
Engineering Data Lists.pdf PDF
D004.pdf PDF
Statement of Work (SOW)_1 Sep 21.pdf PDF
L-900 Instructions to Offerors.pdf PDF
Ground Power Modernization Ordering Guide.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet.pdf PDF
D003_TM86-01R.pdf PDF
D004_TM86-01R.pdf PDF
E009.pdf PDF
D001.pdf PDF
C009.pdf PDF
C007.pdf PDF
F001.pdf PDF
E001.pdf PDF
C001.pdf PDF
B002.pdf PDF
A002.pdf PDF
C015.pdf PDF
200415485_98752_EDL.pdf PDF
RFP Attachment 5 - Relevancy Table.pdf PDF
Warranty Tracking Information.pdf PDF
Source of Repair Instructions.pdf PDF
C016.pdf PDF
C014.pdf PDF
D005.pdf PDF
C006.pdf PDF
F003.pdf PDF
E007.pdf PDF
D002.pdf PDF
Show all 50

Ground Power Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Group A

Extraction from RFP Attachment 10, Price Spreadsheet
Solicitation FA8532-22-R-0001
Group A
Offeror:
ORDERING PERIOD I
BASIC Contract Period (36 Months)
CLINTypeDescriptionQty/BEQ
0001FFP144kW GPU First Article
0001AAFFPFirst Article Units6
0001ABFFPNRE against CLIN 0001AA, to include testing costs1
0002FFP72kW GPU First Article
0002AAFFPFirst Article Units6
0002ABFFPNRE against CLIN 0002AA, to include testing costs1
0003FFPUniversal Load Bank First Article
0003AAFFPFirst Article Units8
0003ABFFPNRE against CLIN 0003AA, to include testing costs1
0004Data
0004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
0004ABNSPCONFERENCE AGENDA (A002)1
0004ACNSPCONFERENCE MINUTES (A003)1
0004ADFFPTECHNICAL REPORT-STUDY SERVICES (B001)1
0004AEFFPTECHNICAL REPORT-STUDY SERVICES (Test readiness review documentation package) (B002)1
0004AFNSPSYSTEM SAFETY PROGRAM PLAN (C001)1
0004AGNSPSYSTEM SAFETY HAZARD ANALYSIS REPORT (C002)1
0004AHNSPCORROSION PREVENTION AND CONTROL PLAN (C003)1
0004AJNSPCOUNTERFEIT PROTECTION PLAN (C004)1
0004AKNSPTECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005)1
0004ALNSPRISK MANAGEMENT FRAMEWORK (RMF) (C006)1
0004AMNSPSOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007)1
0004ANNSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
0004APNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
0004AQFFPLOGISTICS PRODUCT DATA (C010)1
0004ARFFPENGINEERING DATA FOR PROVISIONING (C011)1
0004ASFFPLOGISTICS PRODUCT DATA - 72 kW GPU (C012)1
0004ATFFPENGINEERING DATA FOR PROVISIONING - 72 kW GPU (C013)1
0004AUFFPLOGISTICS PRODUCT DATA - 144 kW ULB (C014)1
0004AVFFPENGINEERING DATA FOR PROVISIONING - 144 kW ULB (C015)1
0004AWFFPAIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 144 kW GPU (D001)1
0004AXFFPAIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 72 kW GPU (D002)1
0004AYFFPAIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - 144 kW ULB (D003)1
0004AZFFPTRAINING MATERIAL (D005)1
0004BAFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
0004BBFFPTECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001)1
0004BCFFPFIRST ARTICLE TEST PLAN (E002)1
0004BDFFPFIRST ARTICLE TEST PROCEDURE (E003)1
0004BEFFPTEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004)1
0004BFFFPTEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005)1
0004BGFFPTEST-INSPECTION REPORT (144kW FIRST CONNECT TEST REPORT) (E006)1
0004BHFFPTEST-INSPECTION REPORT (ULB FIRST CONNECT TEST REPORT) (E007)1
0004BJNSPPRODUCTION ACCEPTANCE TEST PROCEDURE (E008)1
0004BKNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
0004BLTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
0004BMNSPNOTICE OF REVISION (NOR) (F002)1
0004BNNSPREQUEST FOR VARIANCE (RFV) (F003)1
0005CRNFTravel1
0006FFPPost Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference1
0007FFP144kW GPU LRIP Production Units
1-1010
11-166
16
0008FFP72kW GPU LRIP Production Units
1-1010
11-177
17
0009FFPUniversal Load Bank LRIP Production Units
1-1010
11-166
16
0010TBNLRU Spares1
ORDERING YEAR I (12 MONTHS) Full-rate
CLINTypeDescriptionQty/BEQ
1001FFP144kW GPU Production Units
1-1010
11-5040
51-6414
64
100272kW GPU Production Units (266)
1002AAFFP72kW GPU Guarantee Quantity (.25 x 266 = 66)
1-1010
11-5040
51-6616
66
1002ABFFP72kW GPU Competitive Quantity (.50 x 266 = 133)
1-1010
11-5040
51-10050
101-13333
133
1003FFFPUniversal Load Bank Production Units
1-1010
11-5040
51-6010
60
1004Data
1004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
1004ABNSPCONFERENCE AGENDA (A002)1
1004ACNSPCONFERENCE MINUTES (A003)1
1004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
1004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
1004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
1004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
1004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
1004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
1004AKNSPNOTICE OF REVISION (NOR) (F002)1
1004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
1005CRNFTravel1
1006TBNLRU Spares1
ORDERING YEAR II (12 MONTHS)
CLINTypeDescriptionQty/BEQ
2001FFP144kW GPU Production Units
1-1010
11-5040
51-6616
66
200272kW GPU Production Units (480)
2002AAFFP72kW GPU Guarantee Quantity (.25 x 480 = 120)
1-1010
11-5040
51-10050
101-12020
120
2002ABFFP72kW GPU Competitive Quantity (.50 x 480 = 240)
1- 1010
11 - 5040
51 - 10050
101-15050
151-20050
201-24040
240
2003FFPUniversal Load Bank Production Units
1-1010
11-5040
51-6010
60
2004Data
2004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
2004ABNSPCONFERENCE AGENDA (A002)1
2004ACNSPCONFERENCE MINUTES (A003)1
2004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
2004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
2004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
2004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
2004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
2004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
2004AKNSPNOTICE OF REVISION (NOR) (F002)1
2004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
2005CRNFTravel1
2006TBNLRU Spares1
OPTION I
ORDERING PERIOD II
ORDERING YEAR III (12 MONTHS)
CLINTypeDescriptionQty/BEQ
3001FFP144kW GPU Production Units
1-1010
11-5040
51-544
54
3002FFP72kW GPU Production Units (440)
3002AAFFP72kW GPU Guarantee Quantity (.25 x 440 = 110)
1-1010
11-5040
51-10050
101-11010
110
3002ABFFP72kW GPU Competitive Quantity (.50 x 440 = 220)
1- 1010
11 - 5040
51-10050
101-15050
151-20050
201-22020
220
3003FFPUniversal Load Bank Production Units
1-1010
11-5040
51-6010
60
3004Data
3004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
3004ABNSPCONFERENCE AGENDA (A002)1
3004ACNSPCONFERENCE MINUTES (A003)1
3004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
3004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
3004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
3004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
3004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
3004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
3004AKNSPNOTICE OF REVISION (NOR) (F002)1
3004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
3005CRNFTravel1
3006TBNLRU Spares1
ORDERING YEAR IV (12 MONTHS)
CLINTypeDescriptionQty/BEQ
4001FFP144kW GPU Production Units
1-1010
11-3626
36
4002FFP72kW GPU Production Units (432)
4002AAFFP72kW GPU Guarantee Quantity (.25 x 432 = 108)
1-1010
11-5040
51-10050
101-1088
108
4002ABFFP72kW GPU Competitive Quantity (.50 x 432 = 216)
1- 1010
11 - 5040
51 - 10050
101-15050
151-20050
201-21616
216
4003FFPUniversal Load Bank Production Units
1-1010
11-5040
51-6010
60
4004Data
4004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
4004ABNSPCONFERENCE AGENDA (A002)1
4004ACNSPCONFERENCE MINUTES (A003)1
4004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
4004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
4004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
4004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
4004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
4004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
4004AKNSPNOTICE OF REVISION (NOR) (F002)1
4004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
4005CRNFTravel1
4006TBNLRU Spares1
ORDERING YEAR V (12 MONTHS)
CLINTypeDescriptionQty/BEQ
5001FFP144kW GPU Production Units8
5002FFP72kW GPU Production Units (432)
5002AAFFP72kW GPU Guarantee Quantity (.25 x 432 = 108)
1-1010
11-5040
51-10050
101-1088
108
5002ABFFP72kW GPU Competitive Quantity (.50 x 432 = 216)
1- 1010
11 - 5040
51 - 10050
101-15050
151-20050
201-21616
216
5003FFPUniversal Load Bank Production Units
1-1010
11-3626
36
5004Data
5004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
5004ABNSPCONFERENCE AGENDA (A002)1
5004ACNSPCONFERENCE MINUTES (A003)1
5004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
5004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
5004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
5004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
5004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
5004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
5004AKNSPNOTICE OF REVISION (NOR) (F002)1
5004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
5005CRNFTravel1
5006TBNLRU Spares1
ORDERING YEAR VI (12 MONTHS)
CLINTypeDescriptionQty/BEQ
6002FFP72kW GPU Production Units (432)
6002AAFFP72kW GPU Guarantee Quantity (.25 x 432 = 108)
1-1010
11-5040
51-10050
101-1088
108
6002ABFFP72kW GPU Competitive Quantity (.50 x 432 = 216)
1- 1010
11 - 5040
51 - 10050
101-15050
151-20050
201-21616
216
6004Data
6004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
6004ABNSPCONFERENCE AGENDA (A002)1
6004ACNSPCONFERENCE MINUTES (A003)1
6004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
6004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
6004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
6004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
6004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
6004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
6004AKNSPNOTICE OF REVISION (NOR) (F002)1
6004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
6005CRNFTravel1
6006TBNLRU Spares1
ORDERING YEAR VII (12 MONTHS)
CLINTypeDescriptionQty/BEQ
7002FFP72kW GPU Production Units (400)
7002AAFFP72kW GPU Guarantee Quantity (.25 x 400 = 100)
1-1010
11-5040
51-10050
100
7002ABFFP72kW GPU Competitive Quantity (.50 x 400 = 200)
1- 1010
11 - 5040
51 - 10050
101-15050
151-20050
200
7004Data
7004AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
7004ABNSPCONFERENCE AGENDA (A002)1
7004ACNSPCONFERENCE MINUTES (A003)1
7004ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
7004AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
7004AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
7004AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
7004AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
7004AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
7004AKNSPNOTICE OF REVISION (NOR) (F002)1
7004ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
7005CRNFTravel1
7006TBNLRU Spares1

Group B

Extraction from RFP Attachment 10, Price Spreadsheet
Solicitation FA8532-22-R-0001
Group B
Offeror:
ORDERING PERIOD I
BASIC Contract Period (36 Months)
CLINTypeDescriptionQty/BEQ
0011FFP72kW GPU First Article
0011AAFFPFirst Article Units6
0011ABFFPNRE against CLIN 0002AA, to include testing costs1
0012Data
0012AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
0012ABNSPCONFERENCE AGENDA (A002)1
0012ACNSPCONFERENCE MINUTES (A003)1
0012ADFFPTECHNICAL REPORT-STUDY SERVICES (B001)1
0012AEFFPTECHNICAL REPORT-STUDY SERVICES (Test readiness review documentation package) (B002)1
0012AFNSPSYSTEM SAFETY PROGRAM PLAN (C001)1
0012AGNSPSYSTEM SAFETY HAZARD ANALYSIS REPORT (C002)1
0012AHNSPCORROSION PREVENTION AND CONTROL PLAN (C003)1
0012AJNSPCOUNTERFEIT PROTECTION PLAN (C004)1
0012AKNSPTECHNICAL REPORT - STUDY SERVICES (CYBERSECURITY ANALYSIS) (C005)1
0012ALNSPRISK MANAGEMENT FRAMEWORK (RMF) (C006)1
0012AMNSPSOFTWARE ASSURANCE EVALUATION REPORT (SAER) (C007)1
0012ANNSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
0012APNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
0012AQFFPLOGISTICS PRODUCT DATA - 72 kW GPU (C016)1
0012ARFFPENGINEERING DATA FOR PROVISIONING - 72 kW GPU (C017)1
0012ASFFPAIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENTS - Group B (D004)1
0012ATFFPTRAINING MATERIAL (D005)1
0012AUFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
0012AVFFPTECHNICAL REPORT - STUDY SERVICES (DESIGN ANALYSIS) (E001)1
0012AWFFPFIRST ARTICLE TEST PLAN (E002)1
0012AXFFPFIRST ARTICLE TEST PROCEDURE (E003)1
0012AYFFPTEST-INSPECTION REPORT (FIRST ARTICLE TEST REPORT) (E004)1
0012AZFFPTEST-INSPECTION REPORT (72kW FIRST CONNECT TEST REPORT) (E005)1
0012BANSPPRODUCTION ACCEPTANCE TEST PROCEDURE (E008)1
0012BBNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
0012BCTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
0012BDNSPNOTICE OF REVISION (NOR) (F002)1
0012BENSPREQUEST FOR VARIANCE (RFV) (F003)1
0013CRNFTravel1
0014FFPPost Award Conference, to Include Provisioning Guidance Conference, Technical Order Guidance Conference1
0015FFP72kW GPU LRIP Production Units
1-1010
11-177
17
0016TBNLRU Spares1
ORDERING YEAR I (12 MONTHS) Full-rate
CLINTypeDescriptionQty/BEQ
100772kW GPU Production Units (266)
1007AAFFP72kW GPU Guarantee Quantity (.25 x 266 = 67)
1-1010
11-5040
51-6717
67
1007ABFFP72kW GPU Competitive Quantity (.50 x 266 = 133)
1-1010
11-5040
51-10050
101-13333
133
1008Data
1008AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
1008ABNSPCONFERENCE AGENDA (A002)1
1008ACNSPCONFERENCE MINUTES (A003)1
1008ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
1008AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
1008AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
1008AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
1008AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
1008AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
1008AKNSPNOTICE OF REVISION (NOR) (F002)1
1008ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
1009CRNFTravel1
1010TBNLRU Spares1
ORDERING YEAR II (12 MONTHS)
CLINTypeDescriptionQty/BEQ
200772kW GPU Production Units (480)
2007AAFFP72kW GPU Guarantee Quantity (.25 x 480 = 120)
1-1010
11-5040
51-10050
101-12020
120
2007ABFFP72kW GPU Competitive Quantity (.50 x 480 = 240)
1- 1010
11 - 5040
51 - 10050
101-15050
151-20050
201-24040
240
2008Data
2008AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
2008ABNSPCONFERENCE AGENDA (A002)1
2008ACNSPCONFERENCE MINUTES (A003)1
2008ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
2008AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
2008AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
2008AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
2008AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
2008AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
2008AKNSPNOTICE OF REVISION (NOR) (F002)1
2008ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
2009CRNFTravel1
2010TBNLRU Spares1
OPTION I
ORDERING PERIOD II
ORDERING YEAR III (12 MONTHS)
CLINTypeDescriptionQty/BEQ
3007FFP72kW GPU Production Units (440)
3002AAFFP72kW GPU Guarantee Quantity (.25 x 440 = 110)
1-1010
11-5040
51-10050
101-11010
110
3007ABFFP72kW GPU Competitive Quantity (.50 x 440 = 220)
1- 1010
11 - 5040
51-10050
101-15050
151-20050
201-22020
220
3008Data
3008AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
3008ABNSPCONFERENCE AGENDA (A002)1
3008ACNSPCONFERENCE MINUTES (A003)1
3008ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
3008AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
3008AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
3008AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
3008AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
3008AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
3008AKNSPNOTICE OF REVISION (NOR) (F002)1
3008ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
3009CRNFTravel1
3010TBNLRU Spares1
ORDERING YEAR IV (12 MONTHS)
CLINTypeDescriptionQty/BEQ
4007FFP72kW GPU Production Units (432)
4007AAFFP72kW GPU Guarantee Quantity (.25 x 432 = 108)
1-1010
11-5040
51-10050
101-1088
108
4007ABFFP72kW GPU Competitive Quantity (.50 x 432 = 216)
1- 1010
11 - 5040
51 - 10050
101-15050
151-20050
201-21616
216
4008Data
4008AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
4008ABNSPCONFERENCE AGENDA (A002)1
4008ACNSPCONFERENCE MINUTES (A003)1
4008ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
4008AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
4008AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
4008AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
4008AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
4008AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
4008AKNSPNOTICE OF REVISION (NOR) (F002)1
4008ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
4009CRNFTravel1
4010TBNLRU Spares1
ORDERING YEAR V (12 MONTHS)
CLINTypeDescriptionQty/BEQ
5007FFP72kW GPU Production Units (432)
5007AAFFP72kW GPU Guarantee Quantity (.25 x 432 = 108)
1-1010
11-5040
51-10050
101-1088
108
5007ABFFP72kW GPU Competitive Quantity (.50 x 432 = 216)
1- 1010
11 - 5040
51 - 10050
101-15050
151-20050
201-21616
216
5008Data
5008AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
5008ABNSPCONFERENCE AGENDA (A002)1
5008ACNSPCONFERENCE MINUTES (A003)1
5008ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
5008AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
5008AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
5008AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
5008AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
5008AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
5008AKNSPNOTICE OF REVISION (NOR) (F002)1
5008ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
5009CRNFTravel1
5010TBNLRU Spares1
ORDERING YEAR VI (12 MONTHS)
CLINTypeDescriptionQty/BEQ
6007FFP72kW GPU Production Units (432)
6007AAFFP72kW GPU Guarantee Quantity (.25 x 432 = 108)
1-1010
11-5040
51-10050
101-1088
108
6007ABFFP72kW GPU Competitive Quantity (.50 x 432 = 216)
1- 1010
11 - 5040
51 - 10050
101-15050
151-20050
201-21616
216
6008Data
6008AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
6008ABNSPCONFERENCE AGENDA (A002)1
6008ACNSPCONFERENCE MINUTES (A003)1
6008ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
6008AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
6008AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
6008AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
6008AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
6008AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
6008AKNSPNOTICE OF REVISION (NOR) (F002)1
6008ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
6009CRNFTravel1
6010TBNLRU Spares1
ORDERING YEAR VII (12 MONTHS)
CLINTypeDescriptionQty/BEQ
7007FFP72kW GPU Production Units (400)
7007AAFFP72kW GPU Guarantee Quantity (.25 x 400 = 100)
1-1010
11-5040
51-10050
100
7007ABFFP72kW GPU Competitive Quantity (.50 x 400 = 200)
1- 1010
11 - 5040
51 - 10050
101-15050
151-20050
200
7008Data
7008AANSPCONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT (A001)1
7008ABNSPCONFERENCE AGENDA (A002)1
7008ACNSPCONFERENCE MINUTES (A003)1
7008ADNSPCOUNTERFEIT PROTECTION PLAN (C004)1
7008AENSPCOMPUTER PROGRAM IDENTIFICATION NUMBER CATALOG INFORMATION (C008)1
7008AFNSPCOMPUTER SOFTWARE PRODUCT END ITEMS (C009)1
7008AGFFPTRAINING MATERIAL - PACK-UP DATA (D006)1
7008AHNSPTEST-INSPECTION REPORT (PRODUCTION ACCEPTANCE TEST REPORT) (E009)1
7008AJTBNENGINEERING CHANGE PROPOSAL (ECP) (F001)1
7008AKNSPNOTICE OF REVISION (NOR) (F002)1
7008ALNSPREQUEST FOR VARIANCE (RFV) (F003)1
7009CRNFTravel1
7010TBNLRU Spares1