RFP Attachment 9 - GPU Engine Derating Calculation Worksheet.pdf

PDF 98 KB Posted

Attached to
Ground Power Modernization Federal contract opportunity
Solicitation number
FA8532-22-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This synopsis announces a forthcoming Request for Proposal for indefinite-delivery/indefinite-quantity multiple award contracts to provide 72kW Ground Power Units, 144kW Ground Power Units, and 144kW Universal Load Banks to the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base. The total contract value will be for delivery of 2928 units of the 72kW GPU over ten years, 250 units of the 144kW GPU, and 300 units of the 144kW Universal Load Bank. The solicitation will seek to award two separate contract groups, with Group A open to all offerors for all products, and Group B as a small business set-aside for the 72kW GPU only. Proposals will be due by September 2022 and award is anticipated by October 2022. Offerors must be registered in SAM.gov and approved for access to controlled technical data. Successful awardees must also complete first article testing and provide various data deliverables as required by the Performance Work Statements.

View the file

Other files for this federal contract opportunity

Other files attached to Ground Power Modernization, newest first.
File Type Posted
Question and Answer 8.docx DOCX document
Question and Answer 6.docx DOCX document
RFP Attachment 3 - List of Fill-In Clauses to be Completed - Revised 2.pdf PDF
FA8532-22-R-0001_0003.pdf PDF
FA8532-22-R-0001_0002.pdf PDF
Question and Answer 3.docx DOCX document
FA8532-22-R-0001_0001.pdf PDF
RFP Attachment 10 - Price Spreadsheet - Revised.xlsx XLSX spreadsheet
Question and Answer 2.docx DOCX document
Question and Answer 1.docx DOCX document
RFP Attachment 10 - Price Spreadsheet.xlsx XLSX spreadsheet
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed.pdf PDF
E005.pdf PDF
E004.pdf PDF
E008.pdf PDF
F002.pdf PDF
C005.pdf PDF
C002.pdf PDF
A003.pdf PDF
C017.pdf PDF
Engineering Data Lists.pdf PDF
D004.pdf PDF
Statement of Work (SOW)_1 Sep 21.pdf PDF
L-900 Instructions to Offerors.pdf PDF
Ground Power Modernization Ordering Guide.pdf PDF
D003_TM86-01R.pdf PDF
D004_TM86-01R.pdf PDF
E009.pdf PDF
D001.pdf PDF
C009.pdf PDF
C007.pdf PDF
F001.pdf PDF
E001.pdf PDF
C001.pdf PDF
B002.pdf PDF
A002.pdf PDF
C015.pdf PDF
200415485_98752_EDL.pdf PDF
RFP Attachment 5 - Relevancy Table.pdf PDF
Warranty Tracking Information.pdf PDF
Source of Repair Instructions.pdf PDF
C016.pdf PDF
C014.pdf PDF
D005.pdf PDF
C006.pdf PDF
F003.pdf PDF
E007.pdf PDF
D002.pdf PDF
C013.pdf PDF
Show all 50

Ground Power Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Distribution Statement A. Approved for public release. Distribution is unlimited.

GPU Engine Derating Calculation Worksheet

1. Electrical Demand Calculation A. List worst case 400 Hz electrical load: _____ kW

(Includes any cable compensation and/or on-board electrical devices powered by the LRU)

1. List worst case full load 400 Hz LRU efficiency: _____ %

2. List worst case 400 Hz LRU A.C. alternator load: _____ kW

(Convert line 1A and 1A.1 to kW) B. List worst case 28.5 VDC electrical load: _____ kW

(Includes any cable compensation and/or on-board electrical devices powered by the LRU)

1. List worst case full load 28.5 VDC LRU efficiency: _____ %

2. List worst case 28.5 VDC LRU A.C. alternator load: _____ kW

(Convert line 1B and 1B.1 to kW) C. List worst case 270 VDC electrical load: _____ kW

(Includes any cable compensation and/or on-board electrical devices powered by the LRU)

1. List worst case full load 270 VDC LRU efficiency: _____ %

2. List worst case 270 VDC LRU A.C. alternator load: _____ kW

(Convert line 1C and 1C.1 to kW) D. List worst case total A.C. electrical load: _____ kW

(Greatest of lines 1A.2, 1B.2, and 1C.2 plus any miscellaneous on-board devices powered by the A.C. alternator.)

2. A.C. Alternator Demand Calculation A. List worst case A.C. electrical load: _____ kW

(From 1D above.)

B. List worst case A.C. alternator environmental deratings:

1. Altitude: _____ kW

2. Temperature: _____ kW

3. Other (specify): _____ kW

4. Other (specify): _____ kW

5. Other (specify): _____ kW

Total 1 through 5: _____ kW C. List worst case A.C. alternator efficiency: _____% D. Convert line 2.C to kW _____ kW E. List worst case total A.C. alternator electrical load: _____ kW

(Lines 2A plus any deratings from 2.B.1 through 2.B.5, plus 2.D) F. List continuous rating of A.C. alternator _____ kW (Line 2F shall be equal to or greater than Line 2E.)

G. Convert 2E to HP by ÷ 746: _____ HP (This is the engine HP required to provide the worst case electrical load.)

3. Engine Power Calculation A. List engine manufacturer continuous HP rating: _____ HP

B. List engine parasitic loads:

1. Engine fan: _____ HP

2. Battery charging alternator: _____ HP

3. Other (specify): _____ HP

4. Other (specify): _____ HP

5. Other (specify): _____ HP Total 1 through 5: _____ HP C. List worst case fuel derating (___ %) and convert to HP: _____ HP (List what the worst case fuel is for selected engine: ________________) D. List manufacturing tolerance (___ %) and convert to HP: _____ HP E. List engine aging (___ %) and convert to HP: _____ HP F. List worst case engine environmental deratings:

1. Altitude: _____ HP

2. Temperature: _____ HP

3. Humidity: _____ HP

4. Other (specify): _____ HP

5. Other (specify): _____ HP Total 1 through 5: _____ HP G. Total lines 3B through 3F: _____ HP H. Subtract line 3G from line 3A: _____ HP (This is the total engine HP available after derating.)

3. Available Power Calculation A. List line 2G, engine HP required for worst case electrical load: _____ HP B. List line 3H, total engine HP available after derating: _____ HP C. Subtract line 3A from line 3B: _____ HP (A positive number indicates enough HP is available; a negative number indicates enough HP is not available.)

Instructions for completing Engine Derating Calculation Worksheet

1. Offeror shall not modify the form and shall insert data (whole numbers only) in the spaces provided.

2. Line 1D shall contain all parasitic electrical loads such an ancillary power supplies, control system electrical demand, etc. Offeror shall provide justification if Line 1D is not greater than either Line 1A, 1B, or Line 1C.

3. Lines 2B, 2C, and 2F shall come from the A.C. alternator manufacturer’s data sheet. Use spaces entitled “Other” to list any deratings loads not provided on worksheet.

4. Line 3A shall be the engine manufacturer’s application engineering department continuous HP rating.

5. Line 3B shall contain all engine parasitic loads, use spaces entitled “Other” to list any loads not provided on worksheet.

5. Offeror shall provide justification, supporting rational, and engine manufacturer application engineering department guidance/concurrence as an attachment entitled “Engine Derating Exceptions” for any unused derating contained on lines 3C through 3F.

6. Line 3F shall contain all engine environmental derating, use spaces entitled “Other” to list any deratings not provided on worksheet.

<End of Document>

File details come from the government source that posted it. Updated .