Question and Answer 8.docx
DOCX document 19 KB Posted
- Attached to
- Ground Power Modernization Federal contract opportunity
- Solicitation number
- FA8532-22-R-0001
About this file
This document provides questions and answers regarding a forthcoming solicitation for ground power equipment. The solicitation will seek firm-fixed-price and cost reimbursement contracts for 72kW and 144kW ground power units and a 144kW universal load bank. The Air Force Life Cycle Management Center at Robins Air Force Base intends to award the contracts in two groups, with Group A including all three equipment types and awarded on a full and open basis, and Group B including only the 72kW ground power unit and awarded as a small business set aside. The contracts will have a basic three-year period and seven one-year ordering periods, for a total performance period of ten years. The solicitation is expected to be released on October 15, 2021 with anticipated award on September 26, 2022.
View the file
Other files for this federal contract opportunity
Show all 50
Ground Power Modernization has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Questions and Answers #8 17 Nov 2021
| Q1: | Can I use the DoD SAFE link twice, so we can do two separate drop-offs, one per group? | ||||||||
| A1: | If proposing to both Group A and Group B, please use a designator for Group A and | Group B so all the files can be added to the same link. Please note there is an eight (8) | GB data size limitation as well as a number of files (25 files) limitation. If the total | number of files | between both groups exceeds 25, please advise the Government POCs | in order to be sent another link so that Group A and Group B can be sent separately. | |||
| Q2: | The PPI Tool cannot be renamed because I saved them as per the instructions | (companynameRFP#). Can I deviate from those instructions and add the group designator | to the name for each file? For example: GroupA companynameRFP# | ||||||
| A2: | No, please don’t deviate from the naming instructions, as this may interfere with the | importing of the data into the source selection tool required for use. If you can upload | both of the .accdb files, the Government will open them on our end and ensure they are | filed with the appropriate group proposal. | |||||
| Q3: | Do we submit our completed RFP Attachment 4? In other words, do we send the saved .accdb | file? | |||||||
| A3: | Yes, offerors shall submit their completed RFP Attachment 4 in the .accdb file. The | report printouts are also required to be submitted. |