About this file

This document contains a Contract Data Requirements List and a notice of intent to issue a Request for Proposal.

The Contract Data Requirements List outlines requirements for Computer Program Identification Number catalog information to be submitted by the contractor for three end items: a 72kW Ground Power Unit, 144 kW Ground Power Unit, and 144 kW Universal Load Bank. Delivery is required no later than 20 business days prior to first article testing for each end item.

The notice of intent indicates the Support Equipment and Vehicles Division at Robins AFB plans to issue an RFP for Indefinite-Delivery/Indefinite-Quantity contracts for the three end items listed above. The total contract period is ten years with quantities of 2928 for the 72kW GPU, 250 for the 144kW GPU, and 300 for the 144kW ULB. The solicitation will utilize the Technically Acceptable, Performance Price Trade-off evaluation method with anticipated RFP release on October 15, 2021 and award by September 26, 2022. The 72kW GPU requirement will be partially set aside for small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Ground Power Modernization, newest first.
File Type Posted
GPM_JA_(400_Hz_Power_Cable_Assembly)_Redacted.pdf PDF
Question and Answer 8.docx DOCX document
RFP Attachment 3 - List of Fill-In Clauses to be Completed - Revised 2.pdf PDF
Pre-Proposal Conference Follow-Up.docx DOCX document
Extraction from RFP Attachment 10_Columns A thru D only.xlsx XLSX spreadsheet
Pre-Proposal Conference Brief Re-upoload.pptx PPTX presentation
Pre-Proposal Conference Brief.pptx PPTX presentation
Question and Answer 4.docx DOCX document
RFP Attachment 5 - Relevancy Table - Revised.pdf PDF
Question and Answer 3.docx DOCX document
FA8532-22-R-0001_0001.pdf PDF
Question and Answer 1.docx DOCX document
RFP Attachment 10 - Price Spreadsheet.xlsx XLSX spreadsheet
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed.pdf PDF
E005.pdf PDF
E004.pdf PDF
E008.pdf PDF
F002.pdf PDF
C005.pdf PDF
C002.pdf PDF
A003.pdf PDF
C017.pdf PDF
Engineering Data Lists.pdf PDF
D004.pdf PDF
FA8532-22-R-0001.pdf PDF
Pre-Proposal Conference.docx DOCX document
Packaging and Marking Requirements_AFMC 158.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
M-900 Evaluation Basis for Award.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
RFP Attachment 4 Instructions.docx DOCX document
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
D001_TM86-01R.pdf PDF
E006.pdf PDF
E003.pdf PDF
D006.pdf PDF
E002.pdf PDF
B001.pdf PDF
D003.pdf PDF
C003.pdf PDF
2020111299_98752_InputCable.pdf PDF
Statement of Work (SOW)_1 Sep 21.pdf PDF
L-900 Instructions to Offerors.pdf PDF
Ground Power Modernization Ordering Guide.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet.pdf PDF
D003_TM86-01R.pdf PDF
D004_TM86-01R.pdf PDF
E009.pdf PDF
Show all 50

Ground Power Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract |PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0004AN, 0012AN, X004AE,

X008AE

C TDP TM OTHER MISC

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Ground Power Modernization FD2060-21-31511

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

C008 Computer Program Identification Number Catalog Information

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-81454D SOW para 3.4.6.5 AFLCMC/WNZ-SEV NSP

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT One Time See BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A See BLK 16 See BLK 16 Reg Repro

16. REMARKS AFLCMC/WNZ-

SEV 0 1 0

BLK 7: The PCO will issue approval outside iRAPT.

BLK 9: Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only; Critical Technology; Export Controlled; 08 July 2021. Other requests shall be referred to AFLCMC/WNZ.

BLKs 11, 12, & 13: All Computer Software Configuration Items (CSCIs) shall be identified at Critical Design Review (CDR). The contractor shall submit final CPIN Catalog Information no later than 20 business days prior to first article testing for each end item.

BLK 14: Documents shall be provided via electronic media utilizing standard Microsoft Office applications and submitted via email to the points of contact (POC) actual name, phone, and email provided by the Procuring activity at the time of contract award:

Support Equipment & Vehicles Division

ATTN: AFLCMC/WNZ-SEV

235 Byron Street, Suite 19A Robins AFB GA 31098-1813

Notification of submission shall be provided to the PCO via e-mail.

Support Equipment & Vehicles Division

ATTN: AFLCMC/WNK

235 Byron Street, Suite 19A Robins AFB GA 31098-1813

AFLCMC/WNK 0 1 0

15. Total 0 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

David Ringley, AFLCMC/WNZE 3 June 2021

DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page 1 of 1 Pages

9/01/2021

See BLK 16

2021-09-01T07:52:23-0400
HOGAN.JASON.H.1247029288

File details come from the government source that posted it. Updated .