E003.pdf
PDF 256 KB Posted
- Attached to
- Ground Power Modernization Federal contract opportunity
- Solicitation number
- FA8532-22-R-0001
About this file
This document contains a Contract Data Requirements List and details of a related federal contract opportunity for ground power modernization. The Contract Data Requirements List outlines required test procedures and documentation for a first article test, including submission deadlines and distribution statements.
The related federal contract opportunity notice seeks proposals for indefinite-delivery/indefinite-quantity multiple award contracts for 72kW and 144kW Ground Power Units and a 144kW Universal Load Bank. The Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base intends to award two separate contract groups, with the 72kW GPU requirement set aside for small businesses. Proposals are due in September 2022 and award is anticipated in October 2022. The contracts would have a 10-year period of performance involving production, testing, data and support requirements.
View the file
Other files for this federal contract opportunity
Show all 50
Ground Power Modernization has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0004BD, 0012AX E TDP TM OTHER NDTI
D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Ground Power Modernization FD2060-21-31511
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
E003 Test Procedure First Article Test Procedures
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-NDTI-80603A/T SOW para 3.6.2.2 AFLCMC/WNZ-SEV
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD 1 Time See BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS AFLCMC/ WNZ-
SEV 0 1 0
BLK 4: Test procedure shall build upon and further define the test plan. Step by step procedures as required by 3.2.6 of DI-NDTI-80603A are not required. See
3.6.2.2 of SOW for procedure level of detail.
BLK 7: iRAPT shall be utilized.
BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only; Critical Technology; Export Controlled; 8 July 2021. Other requests shall be referred to AFLCMC/WNZ.
BLK 10 and 12: The contractor shall deliver the test procedures no later than 240 calendar days ARO. The Government will have 30 business days after receipt of the test plan for approval/disapproval. If disapproved, the contractor shall have 15 business days to incorporate Government comments and resubmit the revised document.
BLK 14: Documents shall be provided via electronic media utilizing standard Microsoft Office applications and submitted via email to the points of contact (POC) actual name, phone, and email provided by the Procuring activity at the time of contract award:
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNZ-SEV
235 Byron Street, Suite 19A Robins AFB GA 31098-1813
Notification of submission shall be provided to the PCO via e-mail.
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNK
235 Byron Street, Suite 19A Robins AFB GA 31098-1813
AFLCMC/WNK 0 1 0
15. Total 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Relious Grant 7/26/21
DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages
9/02/2021
See BLK 16
| 2021-09-02T08:34:01-0400 | |
| HOGAN.JASON.H.1247029288 |
File details come from the government source that posted it. Updated .