About this file

This document contains a Contract Data Requirements List and a notice of intent to issue a Request for Proposal. The Contract Data Requirements List outlines requirements for a Request for Variance, including frequency of submission, distribution statements, and points of contact.

The notice of intent announces a forthcoming RFP for multiple award IDIQ contracts for 72kW and 144kW Ground Power Units and a 144kW Universal Load Bank. The Air Force Materiel Command Lifecycle Management Center at Robins AFB intends to award two separate contract groups - Group A will consolidate all three end items on a full and open basis, while Group B will be set aside for small business and cover the 72kW GPU only. The contracts would have a base period of three years plus seven one-year ordering periods. Estimated quantities are provided for each end item. The RFP is anticipated for release on October 15, 2021 with award by September 26, 2022.

View the file

Other files for this federal contract opportunity

Other files attached to Ground Power Modernization, newest first.
File Type Posted
GPM_JA_(400_Hz_Power_Cable_Assembly)_Redacted.pdf PDF
Question and Answer 8.docx DOCX document
RFP Attachment 3 - List of Fill-In Clauses to be Completed - Revised 2.pdf PDF
Pre-Proposal Conference Follow-Up.docx DOCX document
Extraction from RFP Attachment 10_Columns A thru D only.xlsx XLSX spreadsheet
Pre-Proposal Conference Brief Re-upoload.pptx PPTX presentation
Pre-Proposal Conference Brief.pptx PPTX presentation
Question and Answer 4.docx DOCX document
RFP Attachment 5 - Relevancy Table - Revised.pdf PDF
Question and Answer 3.docx DOCX document
FA8532-22-R-0001_0001.pdf PDF
Question and Answer 1.docx DOCX document
RFP Attachment 10 - Price Spreadsheet.xlsx XLSX spreadsheet
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed.pdf PDF
E005.pdf PDF
E004.pdf PDF
E008.pdf PDF
F002.pdf PDF
C005.pdf PDF
C002.pdf PDF
A003.pdf PDF
C017.pdf PDF
Engineering Data Lists.pdf PDF
D004.pdf PDF
FA8532-22-R-0001.pdf PDF
Pre-Proposal Conference.docx DOCX document
Packaging and Marking Requirements_AFMC 158.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
M-900 Evaluation Basis for Award.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
RFP Attachment 4 Instructions.docx DOCX document
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
D001_TM86-01R.pdf PDF
E006.pdf PDF
E003.pdf PDF
D006.pdf PDF
E002.pdf PDF
B001.pdf PDF
D003.pdf PDF
C008.pdf PDF
C003.pdf PDF
2020111299_98752_InputCable.pdf PDF
RFP Attachment 5 - Relevancy Table.pdf PDF
Warranty Tracking Information.pdf PDF
Source of Repair Instructions.pdf PDF
C016.pdf PDF
C014.pdf PDF
D005.pdf PDF
Show all 50

Ground Power Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget.

Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0004BN, 0012BE, X004AL,

X008AL

F TDP TM OTHER SESS

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Ground Power Modernization FD2060-21-31511

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

F003 Request for Variance (RFV)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-80640E SOW para 3.8.3 AFLCMC/WNZ-SEV NSP

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT ASREQ ASREQ b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAFT FINAL

N/A N/A N/A Reg Repro

16. REMARKS AFLCMC/ WNZ-

SEV 0 1 0

BLK 7: The PCO will issue approval outside iRAPT.

BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only; Critical Technology; Export Controlled; 08 July 2021. Other requests shall be referred to AFLCMC/WNZ.

BLK 10, 12: Government will have 30 days to approve/disapprove RFV.

BLK 14: Documents shall be provided via electronic media utilizing standard Microsoft Office applications and submitted via email to the points of contact (POC) actual name, phone, and email provided by the Procuring activity at the time of contract award:

Support Equipment & Vehicles Division

ATTN: AFLCMC/WNZ-SEV

235 Byron Street, Suite 19A Robins AFB GA 31098-1813

Notification of submission shall be provided to the PCO via e-mail.

Support Equipment & Vehicles Division

ATTN: AFLCMC/WNK

235 Byron Street, Suite 19A Robins AFB GA 31098-1813

AFLCMC/WNK 0 1 0

15. Total 0 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Relious Grant 5/6/2021 DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages

9/01/2021

ASREQ

2021-09-01T08:09:32-0400
HOGAN.JASON.H.1247029288

File details come from the government source that posted it. Updated .