This document contains a Contract Data Requirements List and a notice of intent to issue a Request for Proposal. The Contract Data Requirements List outlines requirements for a Request for Variance, including frequency of submission, distribution statements, and points of contact.
The notice of intent announces a forthcoming RFP for multiple award IDIQ contracts for 72kW and 144kW Ground Power Units and a 144kW Universal Load Bank. The Air Force Materiel Command Lifecycle Management Center at Robins AFB intends to award two separate contract groups - Group A will consolidate all three end items on a full and open basis, while Group B will be set aside for small business and cover the 72kW GPU only. The contracts would have a base period of three years plus seven one-year ordering periods. Estimated quantities are provided for each end item. The RFP is anticipated for release on October 15, 2021 with award by September 26, 2022.
View the file
Other files for this federal contract opportunity
Show all 50
Ground Power Modernization has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0004BN, 0012BE, X004AL,
X008AL
F TDP TM OTHER SESS
D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Ground Power Modernization FD2060-21-31511
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
F003 Request for Variance (RFV)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80640E SOW para 3.8.3 AFLCMC/WNZ-SEV NSP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ ASREQ b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repro
16. REMARKS AFLCMC/ WNZ-
SEV 0 1 0
BLK 7: The PCO will issue approval outside iRAPT.
BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only; Critical Technology; Export Controlled; 08 July 2021. Other requests shall be referred to AFLCMC/WNZ.
BLK 10, 12: Government will have 30 days to approve/disapprove RFV.
BLK 14: Documents shall be provided via electronic media utilizing standard Microsoft Office applications and submitted via email to the points of contact (POC) actual name, phone, and email provided by the Procuring activity at the time of contract award:
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNZ-SEV
235 Byron Street, Suite 19A Robins AFB GA 31098-1813
Notification of submission shall be provided to the PCO via e-mail.
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNK
235 Byron Street, Suite 19A Robins AFB GA 31098-1813
AFLCMC/WNK 0 1 0
15. Total 0 2
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Relious Grant 5/6/2021 DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages
9/01/2021
ASREQ
| 2021-09-01T08:09:32-0400 | |
| HOGAN.JASON.H.1247029288 |
File details come from the government source that posted it. Updated .