E004.pdf

PDF 258 KB Posted

Attached to
Ground Power Modernization Federal contract opportunity
Solicitation number
FA8532-22-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document outlines a forthcoming solicitation for ground power equipment. The Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base intends to issue a request for proposal for indefinite-delivery/indefinite-quantity multiple award contracts for 72kW and 144kW ground power units and a 144kW universal load bank. The solicitation will consist of two groups, with Group A including all three end items under one full and open competition contract, and Group B as a small business set aside for the 72kW ground power unit only. Interested vendors must register in SAM.gov and be approved to access export-controlled data. The testing requirements, first article, and data deliverables are defined. The evaluation method will be technically acceptable, performance price trade-off. The anticipated release date for the request for proposal is October 15, 2021, with anticipated award by September 26, 2022.

View the file

Other files for this federal contract opportunity

Other files attached to Ground Power Modernization, newest first.
File Type Posted
Question and Answer 8.docx DOCX document
Question and Answer 6.docx DOCX document
RFP Attachment 3 - List of Fill-In Clauses to be Completed - Revised 2.pdf PDF
FA8532-22-R-0001_0003.pdf PDF
FA8532-22-R-0001_0002.pdf PDF
Question and Answer 3.docx DOCX document
FA8532-22-R-0001_0001.pdf PDF
RFP Attachment 10 - Price Spreadsheet - Revised.xlsx XLSX spreadsheet
Question and Answer 2.docx DOCX document
Question and Answer 1.docx DOCX document
RFP Attachment 10 - Price Spreadsheet.xlsx XLSX spreadsheet
RFP Attachment 6 - Subcontractor and Teaming Member Consent Form.pdf PDF
RFP Attachment 3 - List of Fill-In Clauses to be Completed.pdf PDF
E005.pdf PDF
E008.pdf PDF
F002.pdf PDF
C005.pdf PDF
C002.pdf PDF
A003.pdf PDF
C017.pdf PDF
Engineering Data Lists.pdf PDF
D004.pdf PDF
Statement of Work (SOW)_1 Sep 21.pdf PDF
L-900 Instructions to Offerors.pdf PDF
Ground Power Modernization Ordering Guide.pdf PDF
RFP Attachment 9 - GPU Engine Derating Calculation Worksheet.pdf PDF
D003_TM86-01R.pdf PDF
D004_TM86-01R.pdf PDF
E009.pdf PDF
D001.pdf PDF
C009.pdf PDF
C007.pdf PDF
F001.pdf PDF
E001.pdf PDF
C001.pdf PDF
B002.pdf PDF
A002.pdf PDF
C015.pdf PDF
200415485_98752_EDL.pdf PDF
FA8532-22-R-0001.pdf PDF
Pre-Proposal Conference.docx DOCX document
Packaging and Marking Requirements_AFMC 158.pdf PDF
RFP Attachment 1 - Past Performance Information (PPI) for Offerors.pdf PDF
RFP Attachment 7 - Past Performance Questionnaire.pdf PDF
M-900 Evaluation Basis for Award.pdf PDF
RFP Attachment 8 - Client Authorization Letter.pdf PDF
RFP Attachment 4 Instructions.docx DOCX document
RFP Attachment 2 - Oral Presentations for Discussions Slide Deck.pptx PPTX presentation
D001_TM86-01R.pdf PDF
E006.pdf PDF
Show all 50

Ground Power Modernization has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget.

Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0004BE, 0012AY E TDP TM OTHER NDTI

D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Ground Power Modernization FD2060-21-31511

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

E004 Test/Inspection Report First Article Test Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-NDTI-80809B NOT 2/T SOW para 3.6.2.4 AFLCMC/WNZ-SEV

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD MTHLY See BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE DRAF T

FINAL

A N/A See BLK 16 Reg Repro

16. REMARKS AFLCMC/ WNZ-

SEV 1 1 0

BLK 4: Each submission shall include a method of tracking new information/material as well as updated material from previous versions.

BLK 7: iRAPT shall be utilized.

BLK 8: Following initiation of Phase one DT&E, the contractor shall begin incremental reporting on a monthly basis. Each of these monthly reports shall be considered draft test reports. The Government will have 30 business days after receipt of each draft test report for approval/disapproval. If disapproved, the contractor shall incorporate Government comments and resubmit the revised document with the next monthly report. Incremental reporting shall continue until delivery of the final first article test report.

BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only; Critical Technology; Export Controlled; 8 July 2021. Other requests shall be referred to AFLCMC/WNZ.

BLK 12 and 13: The final first article test report shall include the last approved draft submission material, any applicable Phase one DT&E reports, any applicable Phase two DT&E reports, all updated design review material, all applicable final version models and simulation to reflect real world test results, and any applicable Phase three OT&E reports. The Final Report shall be submitted no later than 940 days ARO or 20 days after Phase three OT&E approval, whichever comes first.

BLK 14: Documents shall be provided via electronic media utilizing standard Microsoft Office applications and submitted via email to the points of contact (POC) actual name, phone, and email provided by the Procuring activity at the time of contract award:

Support Equipment & Vehicles Division

ATTN: AFLCMC/WNZ-SEV

235 Byron Street, Suite 19A Robins AFB GA 31098-1813

Notification of submission shall be provided to the PCO via e-mail.

Support Equipment & Vehicles Division

ATTN: AFLCMC/WNK

235 Byron Street, Suite 19A Robins AFB GA 31098-1813

AFLCMC/WNK 1 1 0

15. Total 2 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Relious Grant 7/26/2021

DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages

9/02/2021

See BLK 16

2021-09-02T08:35:01-0400
HOGAN.JASON.H.1247029288

File details come from the government source that posted it. Updated .