E004.pdf
PDF 258 KB Posted
- Attached to
- Ground Power Modernization Federal contract opportunity
- Solicitation number
- FA8532-22-R-0001
About this file
This document outlines a forthcoming solicitation for ground power equipment. The Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base intends to issue a request for proposal for indefinite-delivery/indefinite-quantity multiple award contracts for 72kW and 144kW ground power units and a 144kW universal load bank. The solicitation will consist of two groups, with Group A including all three end items under one full and open competition contract, and Group B as a small business set aside for the 72kW ground power unit only. Interested vendors must register in SAM.gov and be approved to access export-controlled data. The testing requirements, first article, and data deliverables are defined. The evaluation method will be technically acceptable, performance price trade-off. The anticipated release date for the request for proposal is October 15, 2021, with anticipated award by September 26, 2022.
View the file
Other files for this federal contract opportunity
Show all 50
Ground Power Modernization has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0004BE, 0012AY E TDP TM OTHER NDTI
D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Ground Power Modernization FD2060-21-31511
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
E004 Test/Inspection Report First Article Test Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-NDTI-80809B NOT 2/T SOW para 3.6.2.4 AFLCMC/WNZ-SEV
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD MTHLY See BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAF T
FINAL
A N/A See BLK 16 Reg Repro
16. REMARKS AFLCMC/ WNZ-
SEV 1 1 0
BLK 4: Each submission shall include a method of tracking new information/material as well as updated material from previous versions.
BLK 7: iRAPT shall be utilized.
BLK 8: Following initiation of Phase one DT&E, the contractor shall begin incremental reporting on a monthly basis. Each of these monthly reports shall be considered draft test reports. The Government will have 30 business days after receipt of each draft test report for approval/disapproval. If disapproved, the contractor shall incorporate Government comments and resubmit the revised document with the next monthly report. Incremental reporting shall continue until delivery of the final first article test report.
BLK 9: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only; Critical Technology; Export Controlled; 8 July 2021. Other requests shall be referred to AFLCMC/WNZ.
BLK 12 and 13: The final first article test report shall include the last approved draft submission material, any applicable Phase one DT&E reports, any applicable Phase two DT&E reports, all updated design review material, all applicable final version models and simulation to reflect real world test results, and any applicable Phase three OT&E reports. The Final Report shall be submitted no later than 940 days ARO or 20 days after Phase three OT&E approval, whichever comes first.
BLK 14: Documents shall be provided via electronic media utilizing standard Microsoft Office applications and submitted via email to the points of contact (POC) actual name, phone, and email provided by the Procuring activity at the time of contract award:
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNZ-SEV
235 Byron Street, Suite 19A Robins AFB GA 31098-1813
Notification of submission shall be provided to the PCO via e-mail.
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNK
235 Byron Street, Suite 19A Robins AFB GA 31098-1813
AFLCMC/WNK 1 1 0
15. Total 2 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Relious Grant 7/26/2021
DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages