This synopsis and contract data requirements list outline a forthcoming solicitation for ground power equipment. The Department of the Air Force Materiel Command Lifecycle Management Center intends to issue a request for proposal for indefinite-delivery, indefinite-quantity multiple award contracts for 72kW and 144kW ground power units and a 144kW universal load bank. The synopsis delineates two contract groups: Group A will consolidate all three end items under one full and open competition award, while Group B will be set aside for small businesses and cover the 72kW ground power unit only. The base period of performance is three years with seven one-year ordering periods and two ordering cycles. Estimated quantities are provided for each equipment type. The solicitation is anticipated for release on October 15th, 2021 with award estimated for September 26th, 2022. The data requirements list outlines submission details and timing for draft and final risk management framework packages during test readiness review and evaluation.
View the file
Other files for this federal contract opportunity
Show all 50
Ground Power Modernization has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget.
Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0004AL, 0012AL C TDP TM OTHER MGMT
D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Ground Power Modernization FD2060-21-31511
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C006 DoD Risk Management Framework (RMF) Package Deliverables N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-82001A SOW para 3.4.6.2 AFLCMC/WNZ-SEV NSP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD See BLK 16 See BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
A See BLK 16 See BLK 16 Reg Repro
16. REMARKS AFLCMC/WNZ-
SEV 1 0 1
BLK 7: iRAPT shall be utilized.
BLK 8: The draft RMF shall be provided at least 20 calendar days prior to Test Readiness Review (TRR) for Phase one DT&E. Government will provide any comments within 15 calendar days.
BLK 9: Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only; Critical Technology; Export Controlled; 08 July 2021. Other requests shall be referred to AFLCMC/WNZ.
BLKs 10/11/12/13: The final RMF shall be delivered 15 business days after receipt of Government comments. The Government will have 5 business days to approve.
BLK 14: Documents shall be provided via electronic media utilizing standard Microsoft Office applications and submitted via email to the points of contact (POC) actual name, phone, and email provided by the Procuring activity at the time of contract award:
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNZ-SEV
235 Byron Street, Suite 19A Robins AFB GA 31098-1813
Notification of submission shall be provided to the PCO via e-mail.
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNK
235 Byron Street, Suite 19A Robins AFB GA 31098-1813
AFLCMC/WNK 1 0 1
15. Total 2 0 2
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
David Ringley, AFLCMC/WNZE 3 June 2021 DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page 1 o f 1 Pages