Alt 2 Proposal C.pdf

PDF 81 KB Posted

Attached to
463L Cargo Pallet
Solicitation number
FA8519-12-R-463LCargoPallet2
Issued by

About this file

Alt 2 Proposal C

View the file

Other files

File Type Posted
Additional_QuestionsandAnswers.docx DOCX document
Answers_to_Contractors_Questions.pdf PDF
ATTACHMENT_4_-_TEAMING_CONSENT_FORM.pdf PDF
ATTACHMENT_1_-_FACTS_SHEET.pdf PDF
Attachment_5_-_Past-Present_Performance_Questionnaire.pdf PDF
ATTACHMENT_3-_Transmittal_Letter.pdf PDF
ATTACHMENT_2_-_CLIENT_AUTH_LETTER.pdf PDF
Alt 2 Proposal D.pdf PDF
SOW.pdf PDF
All Offerors Propose CLIN Schedule.pdf PDF
7231256 —
DD FORM 1423-1 A006_FEB 2001 - Page 1 of 3.pdf PDF
Alt 1 Proposal B.pdf PDF
DD FORM 1423-1 A002_ FEB 2001 - Page 1 of 3.pdf PDF
7031839 —
CDRL GIDEP 1.pdf PDF
CDRL A003 DD 2052.pdf PDF
7231258 —
CDRL Mishap Notice.docx DOCX document
DD FORM 1423-1 A004_FEB 2001 - Page 1 of 3.pdf PDF
CDRL GIDEP 2.pdf PDF
Alt 1 Proposal A - Copy.pdf PDF
Engineering Order.pdf PDF
DD FORM 1423-1 A001_FEB 2001 - Page 1 of 3.pdf PDF
Pallet Overhaul PWS 2013 - Draft - 15 Mar 2012.pdf PDF
7133043 —
Questions_.pdf PDF
DD FORM 1423-1 A005_ FEB 2001 - Page 1 of 3.pdf PDF
Draft L M 15 MAR 2012.pdf PDF
7031843 —
7133042 —
CDRL GIDEP 3.pdf PDF
Pallets_PWS Rev 1(2009 09 28).doc DOC document
7133043 —
7231258 —
7231256 —
MIL-DTL-27443F —
7031843 —
7133042 —
2ndRFI.doc DOC document
7031839 —
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Alternative 2 ‐ Insurance Policy Utilized; Two contracts issued

Proposal C ‐ Unproven source/FA required

Basic (17 Sep 2013 ‐ 16 Sep 2015)

CLIN Description Qty U/I Delivery

0011 First Article ‐ Repair 3 EA

150 days after approval of CLIN

0012 First Article Test Procedures ‐ Repair 1 LO

60 days after contract award;

Govt gets 15 days to review/approve

0013 First Article Test Report ‐ Repair 1 LO

150 days after

Govt approval of

CLIN 0011; Govt gets 15 days to review/approve

0014 Repairs 71,997 BEQ TBD

0014AA General Inspection without repair

0014AB REUSE: TOP & BOTTOM SKINS. NEW: COMPLETE CORE

0014AC

REPAIR METHOD #2 - REUSE: TOP &

BOTTOM SKINS. NEW: COMPLETE

CORE PLUS REPLACE ONE SHORT

RAIL

0014AD

REPAIR METHOD #2 - REUSE: TOP &

BOTTOM SKINS. NEW: COMPLETE

CORE PLUS REPLACE ONE LONG

RAIL

0014AE

REPAIR METHOD #2 - REUSE: TOP &

BOTTOM SKINS. NEW: COMPLETE

CORE PLUS REPLACE TWO SHORT

RAILS

0014AF

REPAIR METHOD #2 - REUSE: TOP &

BOTTOM SKINS. NEW: COMPLETE

CORE PLUS REPLACE ONE SHORT

RAIL AND ONE LONG RAIL

0014AG

REPAIR METHOD #2 - REUSE: TOP &

BOTTOM SKINS. NEW: COMPLETE

CORE PLUS REPLACE TWO LONG

RAILS

0014AH

REPAIR METHOD #3 - REUSE:

BOTTOM SKIN. NEW: TOP SKIN &

COMPLETE CORE

0014AJ

REPAIR METHOD #3 - REUSE:

BOTTOM SKIN. NEW: TOP SKIN &

COMPLETE CORE PLUS REPLACE

ONE SHORT RAIL

0014AK

REPAIR METHOD #3 - REUSE:

BOTTOM SKIN. NEW: TOP SKIN &

COMPLETE CORE PLUS REPLACE

ONE LONG RAIL

0014AL

REPAIR METHOD #3 - REUSE:

BOTTOM SKIN. NEW: TOP SKIN &

COMPLETE CORE PLUS REPLACE

TWO SHORT RAILS

0014AM

REPAIR METHOD #3 - REUSE:

BOTTOM SKIN. NEW: TOP SKIN &

COMPLETE CORE PLUS REPLACE

ONE SHORT RAIL AND ONE LONG

RAIL

0014AN

REPAIR METHOD #3 - REUSE:

BOTTOM SKIN. NEW: TOP SKIN &

COMPLETE CORE PLUS REPLACE

TWO LONG RAILS

0014AP

REPAIR METHOD #4 - REUSE: TOP

SKIN. NEW: BOTTOM SKIN &

COMPLETE CORE PLUS REPLACE

ONE LONG RAIL

0014AQ

REPAIR METHOD #4 - REUSE: TOP

SKIN. NEW: BOTTOM SKIN &

COMPLETE CORE PLUS REPLACE

ONE SHORT RAIL

0014AR

REPAIR METHOD #4 - REUSE: TOP

SKIN. NEW: BOTTOM SKIN &

COMPLETE CORE PLUS REPLACE

ONE LONG RAIL

0014AS

REPAIR METHOD #4 - REUSE: TOP

SKIN. NEW: BOTTOM SKIN &

COMPLETE CORE PLUS REPLACE

TWO SHORT RAILS

0014AT

REPAIR METHOD #4 - REUSE: TOP

SKIN. NEW: BOTTOM SKIN &

COMPLETE CORE PLUS REPLACE

ONE SHORT RAIL AND ONE LONG

RAIL

0014AU

REPAIR METHOD #4 - REUSE: TOP

SKIN. NEW: BOTTOM SKIN &

COMPLETE CORE PLUS REPLACE

TWO LONG RAILS

0014AV

REPAIR METHOD #5 - NEW: TOP &

BOTTOM SKINS & COMPLETE CORE

0014AW

REPAIR METHOD #5 - NEW: TOP &

BOTTOM SKINS & COMPLETE CORE

PLUS REPLACE ONE SHORT RAIL

0014AX

REPAIR METHOD #5 - NEW: TOP &

BOTTOM SKINS & COMPLETE CORE

PLUS REPLACE ONE LONG RAIL

0014AY

REPAIR METHOD #5 - NEW: TOP &

BOTTOM SKINS & COMPLETE CORE

PLUS REPLACE TWO SHORT RAILS

0014AZ

REPAIR METHOD #5 - NEW: TOP &

BOTTOM SKINS & COMPLETE CORE

PLUS REPLACE ONE SHORT RAIL

AND ONE LONG RAIL

0014BA

REPAIR METHOD #5 - NEW: TOP &

BOTTOM SKINS & COMPLETE CORE

PLUS REPLACE TWO LONG RAILS

0014BB REPLACEMENT OF RING ASSEMBLIES

0014BC REPLACEMENT OF CORNER STRAPS (BRACKETS)

0015 First Article ‐ Production 3 EA

150 days after approval of CLIN

0016 First Article Test Procedures ‐ Product 1 LO

60 days after contract award;

Govt gets 15 days to review/approve

0017 First Article Test Report ‐ Production 1 LO

150 days after

Govt approval of

CLIN 0015; Govt gets 15 days to review/approve

0018 Production 27,997 BEQ TBD

File details come from the government source that posted it. Updated .