CRDL_A003_DI-SESS-81000D_T Attachment.docx

Data Item Description Rev. D DOCX document 30 KB Posted

Attached to
T-38/ F-5 Damper Test Stand (Solicitation)
Solicitation number
FA8224-11-R-0008
Issued by

About this file

A003 Attachment

View the file

Other versions and copies of DI-SESS-81000D

File Revision Posted Attached to
5343VL25 DID A002 DI-SESS-81000F.pdf Rev. F N4523A26Q40330004 - Demineralizer- Full and Open Competition
5343VL25 DID A002 DI-SESS-81000F.pdf Rev. F Demineralizer
Attachment_06_A002_DI-SESS-81000F.pdf Rev. F Amendment-1 RFP FA8119-25-R-0011 Multi-platform Sustainment Engineering Services Support
F1 26Q4003_DID-A001 DI-SESS-81000F.pdf Rev. F 1500 CFM HEPA Filters
Attachment_05_A002_DI-SESS-81000F.pdf Rev. F Draft Solicitation FA8119-25-R-0011 Multi-platform Sustainment Engineering Services Support
10_DID-A005_DI-SESS-81000F_Prod_Eng_data.pdf Rev. F FLIGHT REFUELING POD: (NSN 1680-99-681-5560 FL, Part Number 43323000-6): Sole-Source to COBHAM MISSION SYSTEMS WIMBORNE LIMITED. , Cage U1918
DI-SESS-81000F.pdf Rev. F Laminated Bus Bar
CUI A04.01 DID A003 DI-SESS-81000F N4523A0350VL01.pdf Rev. F HEPA FILTER KITS
0138VL00-00001-0138-VL00 DID A002 DI-SESS-81000F.pdf Rev. F Demineralizers
FOUO_XXXX DID A003 DI-SESS-81000F -Hepa Filter-.pdf Rev. F Hepa Filter
DID_DI-SESS-81000F.pdf Rev. F B-2 Fuel Vent Control Valve Obsolescence - Phase II
9283VL00-01082-Demineralizer_DID DI-SESS-81000F A002.pdf Rev. F Demineralizers
93478634 FACTORY ACCEPTANCE TEST-TEST PROCEDURES CDRL DID DI-SESS-81000E REV 12-18-2018.pdf Rev. E, Dec 18, 2018 Anchor Monitoring System Display Monitor Development and Production
9. DI-SESS-81000E (ProductDrawingsModels and AssocLists).pdf Rev. E Ship Hull Model and Cradle
DI-SESS-81000E.pdf Rev. E MAGTF Common Handheld - M67854-18-R-2023
DI-SESS-81000E.pdf Rev. E MAGTF Common Handheld (MCH)
DID_DI-SESS-81000E_Product_Drawings.pdf Rev. E HP-1000 E-Series Processor Prototype
Attachment_0008_DI-SESS-81000E_Product_Drawings.pdf Rev. E Expeditionary Shelter Protection System (ESPS)
DI-SESS-81000E_Product_Drawings_Models_and_Associated_Lists.pdf Rev. E Interface Test Adapter for B2 Test Program Set Development
DI-SESS-81000E_Product_Drawings_Models_and_Associated_Lists.pdf Rev. E Interface Test Adapter for B2 Test Program Set Development
Show all 20

Who attaches DI-SESS-81000D

Other files

File Type Posted
FA8224-11-R-0008-0005.doc DOC document
23 March 2011 Site Visit Question and Answers.docx DOCX document
Site_Visit_memo_no_photos.docx DOCX document
T38_F5 Test Stand Purchase Specifications_Rev 2.docx DOCX document
Conformed Doc FA8224-11-R-0008-0004.doc DOC document
Questions and Answers 2.docx DOCX document
CDRL A001.pdf PDF
DI-MISC-81454B.pdf PDF
Signed CDRL A005.pdf PDF
DI-SESS-81000D.pdf PDF
Signed CDRL A004.pdf PDF
TM-86-01N_TMCR.docx DOCX document
DI-ATTS-80282B.pdf PDF
Signed CDRL A006.pdf PDF
DI-QCIC-80798B.pdf PDF
CDRL A003.pdf PDF
Signed CDRL A007.pdf PDF
DI-QCIC-80278B.pdf PDF
Signed CDRL A008.pdf PDF
CDRL A002.pdf PDF
T38_F5 Test Stand Purchase Specifications_Rev 2.docx DOCX document
DI-IPSC-81488.pdf PDF
FA8224-11-R-0008-0003.doc DOC document
DI-NDTI-80809B.pdf PDF
Tab 12 Amendment 2 7Jan2011.pdf PDF
Questions and Answers2 4Jan2011.docx DOCX document
Questions and Answers Site Visit 15Dec2011.docx DOCX document
T38_F5 Test Stand Purchase Specifications 5Jan2011.pdf PDF
T38_F5 Test Stand Purchase Specifications date 20Dec2010.pdf PDF
Tab 12 Amendment 1 20Dec2010.pdf PDF
Questions and Answers 1 14Dec2010.docx DOCX document
T38 and F5 Test Stand Purchase Specifications dated 5Oct2010 Final.pdf PDF
T38 and F5 Test Stand Purchase Specifications dated 5Oct2010.docx DOCX document
Site Visit memo no photos.docx DOCX document
Signed_CDRLs.pdf PDF
Signed_CDRLs.pdf PDF
T38 and F5 Test Stand Purchase Specifications dated 5Oct2010.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CRDL# A001/DI-SESS-81000D/T Attachment

BLOCK 16:

1. Government Activity and Part Identification: The contractor shall comply with Air Force (CAGE 98752) drawing 9626025, titled “Air Force Drawing Requirement”. This requirement defines format requirements for the generation of Air Force drawings.

1.1. Engineering Change Orders (ECOs): When an existing Air Force drawing is revised, all ECOs shall be incorporated prior to the paper submittal for review. Concurrent with the final submittal, all ECOs shall be incorporated and a hardcopy delivered.

2. Content, format, and media requirements for delivery of Digital Engineering Data: The contractor shall comply with Air Force (CAGE 98752) drawing 9579776.

3. Engineering Data: Product drawings/models and associated lists shall be prepared to provide the design, engineering, and manufacturing information necessary to enable the procurement or manufacture of an item essentially identical to the original item. The product shall be defined to the extent necessary for a competent manufacturer to produce an item, which duplicates the physical, interface, and functional characteristics of the original product, without additional design engineering effort or recourse to the current design activity. Product data shall reflect the approved, tested and accepted configuration of the defined delivered item. This together with other TDP elements forms a Production Level TDP which will be used to support the product throughout its lifecycle (MIL-STD-31000 paragraph 5.7.3.3). This includes but is not limited to special tooling, interface hardware, special test equipment, and support equipment.

4. Engineering Drawing Practices: The contractor shall use the practices described in ASME Y14.100-2004. For clarification, the documents listed in paragraph 2 of ASME Y14.100-2004 shall be considered first tier and shall apply. ASME Y14.1-1995 is tailored as follows: Paragraph 6.2 Block L, add “Sheets shall be numbered beginning with one (1) and continue, using consecutive whole integers.” The contractor may find it useful to incorporate the concepts of MIL-HDBK-288 into the preparation of the TDP. MIL-HDBK-288 refers to Engineering Drawing Package (EDP); this term shall be considered synonymous with TDP. In instances where the ASME standards do not fully define requirements concerning preparation of engineering drawings, the contractor shall use the guidance provided in the Drawing Requirements Manual (DRM) 11th Edition available from IHS, Inc. copyright 2008.

5. Control Drawings: Control drawings shall be used to specify the requirements for purchased items per DI-SESS-81000D and ASME Y14.24. The contractor shall not identify his own company as a source on control drawings, unless one additional source is also shown. A separate division of the contractor’s company, with a different manufacturers code (CAGE) may be shown, if it is actually a source. Control drawings not developed for this contract (existing drawings) shall be updated, to show current information (i.e., performance/qualification requirements, vendors/sources names and part numbers.)

6. Commercial Off-the-Shelf (COTS): Definition for a COTS item can be found in the Federal Acquisition Regulation (FAR SUBPART 2.1-Definitions) Part 2.101 and (FAR) Part 12. The technical data requirement for commercial items is at DFARS 252.227-7015. For clarification of this effort, any modification/tailoring of the COTS item shall require a modifying drawing be prepared and delivered to the Air Force documenting the comparison of the COTS item and the item after modification.

7. Contract Numbers: When a TDP document is prepared under a Government contract, the Government contract number under which it is prepared shall appear on the first sheet of the document original. When a TDP document is delivered under a Government contract other than the one under which it was prepared, the Government contract number under which it is delivered shall also appear on the first sheet of each copy submitted. If the document is prepared and submitted under the same contract, only the entry for the contract under which it is prepared is required.

8. Application Block: All new and revised drawings shall contain an Application Block. The Application Block is mandatory for all drawings. The Application Block shall be near the Title Block. The Application Block shall show the “Next Assembly” and “Used On”. When an item is used in more than three applications, the entry “general usage” may be used.

9. Traceability: The contractor shall prepare the TDP in such a manner to insure that all applicable documents and part or identifying numbers (PINS) i.e., Artwork, Schematics, Software/Programming Data, Test Criteria, etc., are referenced within the TDP for traceability.

9.1 If the contractor is the original equipment manufacturer (OEM) any existing detail and assembly drawings shall be revised to include changes to reflect the delivered item’s configuration.

9.2 If the contractor is not the OEM any existing detail and assembly drawings shall be revised by the contractor submitting an engineering order (EO) to include changes to reflect the delivered item’s configuration.

10. Preparation Method: American English language shall be used in the preparation of this TDP. Dimensioning and Tolerancing shall be Decimal Inch in accordance with ASME Y14.5M-1994. Size and format of drawings shall be Decimal Inch per ASME Y14.1. All drawings shall be prepared using Third Angle Orthographic Projection method of presentation. The symbol for angle of projection shall be delineated in the Title Block of newly prepared or revised engineering data. (ASME Y14.3M-1994 figure 1-2)

11. TDP Validation: The contractor shall validate that the TDP and elements thereof conform to the contractual requirements, and that they accurately depict the item(s) developed, modified, or produced under the contract. Successful use of the TDP in producing, inspecting and testing the item(s) is considered acceptable evidence that the validation requirement has been met.

12. Test Criteria: Test criteria is an inherent part of the TDP. Test criteria shall be incorporated, either directly on each TDP document or by reference, for each end item, top assembly item, configured item, and lowest assembled item IAW Air Force (CAGE 98752) drawing 9579777, titled “Clarification of Detailed Test Criteria for Electrical and Avionics Items.”

13. Associated Lists: Parts Lists per ASME Y14.34M are required. Parts Lists are required at assembly level. Parts Lists for Contractor Activity identifier CAGE code may be an integral part of a document or it may be a separate document. The identification and quantity of parts shown on the assembly drawing shall agree with the parts list.

14. Marking: Drawings shall specify requirement for marking part number identification on items as required by MIL-STD-130 and other applicable documents referenced therein. Unique Identification (UID) marking is mandatory for applicable items as determined by the Program Office. (See DFARS 252.211-7003 Item Identification and Valuation) The drawings shall identify the content, method of application, material and location of marking on the part.

15. Printed Board Artwork Master Drawing. The printed board artwork master drawing shall include images of all artwork required to manufacture the printed board. These images will serve as a reference to those images produced from the Gerber data files IAW Air Force drawing 9579776 (CAGE 98752) titled “Digital Data Description Requirement”. Also, this drawing shall reference a unique part or identifying number (PIN) with revision data for the digital file set which includes the Gerber, test, and drill data files. The PIN number format structure and characters shall meet the same requirements as for the part number. These requirements are in addition to those in ASME Y14.24 and other related standards.

16. Printed Board Artwork Master, Test, and Drill NC Data. The printed board artwork master, test, and NC drill data shall be delivered IAW Air Force drawing 9579776 (Cage 98752). These requirements are in addition to those in ASME Y14.24 and other related standards.

17. Source Control Drawings: Air Force engineering will evaluate each request and notice will be promptly given regarding approval/disapproval. Letter requests shall be submitted to the requiring office in Block 6 of this DD Form 1423-1 prior to the preparation or use of a Source Control Drawing. The letter shall be marked with Distribution Statement “A” in accordance with DoD-D-5230.24. Preparation instructions are as follows:

a. Format - The Source Control Drawing Approval Request shall be in the contractor’s format.

b. Content - The request shall specify the following:

(1) Nomenclature and description of the item.

(2) The critical application(s) for which the item is to be used.

(3) Number of applications per end item.

(4) Item status as a repair part.

(5) System performance requirements requiring source qualification.

(6) Procedures and criteria required to qualify a source.

(7) Sources of supply and manufacturers’ part numbers.

(8) Cost of the item involved.

(9) Estimated cost to qualify a source.

(10) Impact on contract cost, schedule and performance if use of source control drawing is not permitted.

(11) Copy of the approved non-standard part approval request, if the DoD Parts Control Program is applicable under the contract or purchase order.

18. Existing/Legacy Data: When existing/legacy data meets the following criteria, or will be modified or revised to meet the following criteria, it shall be used in lieu of preparing new data.

a. It is furnished with rights-in-data consistent with the contract stipulations regarding data rights;

b. It is furnished at a cost to the government equal to or less than preparing new data;

c. It meets the legibility and reproducibility requirements for the TDP element of which it is to be a part;

d. It meets the design disclosure requirements of the TDP element of which it is to be a part;

Note: The contractor shall ensure the existing/legacy data contains current information, i.e. performance/qualification requirements, vendors/sources names and part numbers, etc.

e. It is identified by a Commercial or Government Entity (CAGE) Code, document number, title and applicable contract number(s);

f. Any nonstandard symbols, drawing or documentation practices used are explained in the document or in a document referenced on the document containing the nonstandard symbol or practice;

g. The TDP was prepared using American English Language.

Note: Revisions to existing Government CAGE non CAD data shall be redrawn in CAD and shall meet the contractual requirements for new Air Force drawings per Air Force Drawing 9626025, CAGE 98752.

19. Legibility and Reproducibility: All documents prepared or submitted shall meet the highest legibility and producibility requirements available in the commercial market controlling the media in which the data is to be delivered.

20. Referenced Documents: Documents referenced in a TDP shall be furnished as an integral part of that TDP except where the documentation meets the requirement of the paragraph titled Existing Data above, and has been furnished and approved under a previous contract in the same revision to any USAF repository. When first tier references do not provide the technical information required by the TDP element, subordinate reference documents shall be provided until the design disclosure requirements are met. When information essential to meeting TDP design disclosure requirements (such as default surface texture values) are contained in such documents, that information shall be incorporated in a document acceptable for inclusion in the TDP.

20.1 Prohibited References/Wording: Technical Orders (TOs), pamphlets, recordings, National Stock Numbers (NSNs), To Be Determined (TBD), Statement of Work ((TASKING DOCUMENT)), Performance Work Statement (PWS), Statement of Objectives (SOO), and Contract Data Requirements List (CDRL), shall not be referenced within the TDP.

21. Protecting Classified Information: TDPs or parts thereof, containing classified information shall be protected and marked in accordance with the Department of Defense National Industrial Security Program Operating Manual for Safeguarding Classified Information, DoD Manual 5220.22-M. When 3D TDP data is used, the solid models shall display classification marking clearly visible when the solid model is first opened.

22. Software and Memory Device Data: Software and Memory Device drawings shall be selected per ASME Y14.24 and CAD/CAM data files shall be delivered per Air Force drawing 9579776 (CAGE 98752).

23. Contractor Quality Control System: The contractor shall develop and maintain a quality control system for the detailed examination and technical review of the TDP, to be supplied under the terms of the contract or purchase order. The quality control system shall assure conformance of the TDP to all requirements specified herein. The quality control system shall be documented and subject to review by the Air Force's representative. If the contractor's methods and procedures do not comply with the quality control system or do not attain their objectives, the quality control system shall be subject to disapproval by the Air Force.

24. TDP Quality Control System Requirements: The contractor's TDP quality control system shall address:

a. The methods and procedures to be used to control the development, maintenance and delivery of the TDP, including the use of electronic approvals or authorizations, if applicable.

b. Assignments of responsibilities and procedures for the detailed examination, review and final approval of the TDP by the contractor.

c. Qualifications of the personnel performing the examinations and reviews of the TDP.

d. Procedural flow of information and documentation within the organization for the development, review and approval processing of the TDP and components thereof.

e. Procedures for ensuring that nonstandard items used in the design have been documented as required for the TDP.

f. Methods of ensuring that approved engineering changes have been incorporated into the TDP in accordance with contract requirements.

g. Procedures for ensuring that security markings, distribution statements, and rights-in-data legends are assigned and applied in accordance with applicable specifications, standards, regulations and public laws.

h. Methods of detecting, correcting, and preventing the recurrence of deficiencies with the TDP and discrepancies between the elements and components thereof.

25. Inspection of TDP: The TDP type and elements including TDP documents prepared by subcontractors, shall be inspected for the following:

a. Compliance with the requirements of this contract.

b. Inclusion of all documents, including sub-tier references, required to meet the design disclosure requirements of the TDP.

c. Accuracy of the assignment and identification of security markings, restriction statements (for example distribution statements), export control notices, rights-in-data legends, and other special markings.

d. Inclusion of contract numbers and contractor identifications.

e. Legibility and reproducibility.

f. TDP components have not been prepared for requirements, which could be met by existing standardization documents.

g. Completeness and accuracy of the TDP documents, including required quality assurance information, in describing design of the item, its subassemblies, and component parts. The design to be described by the TDP documents is that configuration of the item the Government has approved, tested, or accepted.

h. Both Type 2D and Type 3D TDPs shall open in the appropriate software without regeneration errors or warnings.