Attachment_10_-_Work_Breakdown_Structure.pdf

PDF 190 KB Posted

Attached to
Advanced Radar Threat System - Variant 2 (ARTS-V2) Development and Production
Solicitation number
FA8210-16-R-5000
Issued by

About this file

Attachment 10

View the file

Other files

File Type Posted
FA821016R5000_______0006.pdf PDF
Attachment_24_-_Section_M.pdf PDF
Consolidated_ARTSV2_RFP_Industry_Comments_Responses_12_Apr_2016.pdf PDF
FA821016R5000_______0005.pdf PDF
FA8210-16-R-5000-0004.pdf PDF
Attachment_24_-_Section_M.pdf PDF
Attachment_27_-_Modelman_Instructions.pdf PDF
Attachment_1_-_Past_Performance_Information_for_Offerors.pdf PDF
Attachment_16_-_WBS__Dictionary.pdf PDF
Attachment_4_-_Past_Performance_Questionnaire.pdf PDF
Consolidated_ARTSV2_RFP_Industry_Comments_Responses_24_Mar_2016.pdf PDF
Attachment_10_-_Work_Breakdown_Structure.pdf PDF
Attachment_2_-_Subcontractor_Teaming_Partner_Consent_Letter.pdf PDF
Attachment_20_-_Exhibits.pdf.pdf PDF
Attachment_31_-_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_32_-_Transportation_158.pdf PDF
Attachment_18_-_Fielding_Locations.pdf PDF
Attachment_23_-_Section_L.pdf PDF
Attachment_3_-_Commercial_Client_Authorization_Letter.pdf PDF
Attachment_19_-_Statement_of_Objectives.pdf PDF
Attachment_15_-_Line_Item_Matrix.xlsx XLSX spreadsheet
Attachment_26_-_Notional_Schedule.pdf PDF
Attachment_28_System_Performance_Specification_Classified_Appendix.pdf PDF
Attachment_25_-_DD254.pdf PDF
Attachment_5_-_Sample_Questionnaire_Cover_Letter.pdf PDF
Attachment_6_Government_Rights_In_Data_and_Software.pdf PDF
Attachment_21_-_Email_Encryption_Instructions.pdf PDF
Attachment_30_-_Reserved.pdf PDF
Consolidated_ARTSV2_RFP_Industry_Comments_Responses_16_Mar_2016.pdf PDF
Consolidated_ARTSV2_RFP_Industry_Comments_Responses_3_Mar_2016.pdf PDF
Consolidated_ARTSV2_RFP_Industry_Comments_Responses_17_Feb_2016.pdf PDF
FINAL_RFP_ARTS-V2__2-18-16.pdf PDF
Consolidated_ARTSV2_RFP_Industry_Comments_Responses_10_Feb_2016.pdf PDF
Attachment_23_-_Section_L.pdf PDF
Attachment_19_-_Statement_of_Objectives.pdf PDF
Attachment_20_-_Exhibits.pdf PDF
FINAL_RFP_ARTS-V2__2-11-16.pdf PDF
Consolidated_ARTSV2_RFP_Industry_Comments_Responses_27_Jan_2016.xlsx XLSX spreadsheet
FINAL_RFP_ARTS_V-2_(01_21_16).pdf PDF
ppi_tool.accdb —
Attachment_25_-_DD254.pdf PDF
Attachment_24_-_Section_M.pdf PDF
Attachment_21_-_Email_Encryption_Instructions.pdf PDF
Attachment_18_-_Fielding_Locations.pdf PDF
Attachment_31_-_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_15_-_Line_Item_Matrix.xlsx XLSX spreadsheet
Attachment_3_-_Commercial_Client_Authorization_Letter.pdf PDF
Attachment_19_-_Statement_of_Objectives.pdf PDF
Attachment_16_-_WBS__Dictionary.pdf PDF
Attachment_30_-_Reserved.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 ATTACHMENT 10 ARTS PROGRAM Date: 1/7/2016

1.1 ARTS System - Prime Mission Product (PMP)

1.1.1 Platform

1.1.2 Radar

1.1.3 Electro Optical

1.1.4 Physical Representation (Shell)

1.1.5 Communications

1.1.6 Auxiliary Equipment

1.1.7 Software Release

1.1.8 Prime Mission Product (PMP) Subsystem Integration, Assembly, Test and Checkout

1.2 ESSS Software Support Station (including all HW tools)

1.3 System Engineering

1.3.1 Systems Engineering Plan (SEP)

1.3.2 Technical Reviews

1.3.3 Configuration Management

1.3.4 Programmatic Environment, Safety and Occupational Health Evaluation (PESHE)

1.3.5 Corrosion Prevention & Control

1.3.6 Modular Open Systems Approach (MOSA)

1.3.7 Data management

1.3.8 Item Unique Identification (IUID)

1.3.9 Spectrum Supportability

1.3.10 Operational Safety, Suitability and Effectiveness (OSS&E)

1.3.11 Interface Control

1.3.12 Reliability/Maintinability/Supportability

1.3.13 Human System Interface (HSI)

1.3.14 Quality Assurance

1.3.15 System Requirements

1.4 Program Management

1.4.1 Charter

1.4.2 Program Control (C/S/P Measurement)

1.4.3 Risk Management

1.4.4 Contracting

1.4.5 Acquisition Support

1.4.6 Logistics Management

1.4.7 Packaging, Handling, Storage and Transportation (PHS&T)

1.4.8 Depot Source of Repair (DSOR)

1.4.9 Finance

1.4.10 Security

1.5 System Test and Evaluation

1.5.1 DevelopmentalTest and Evaluation

1.5.2 Operational Test and Evaluation

1.5.3 Mock-ups / System Integration Labs (SILs)

1.5.4 Test and Evaluation Support

1.5.5 Test Facilities

1.5.6 Test and Evaluation Master Plan (TEMP)

1.6 Training

1.6.1 Equipment

1.6.2 Services

1.6.3 Facilities

1.7 Data

1.7.1 Technical Publications

17.2 Engineering Data

1.7.3 Management Data

1.7.4 Support Data

1.7.5 Data Depository

1.8 Peculiar Support Equipment

1.8.1 Test and Measurement Equipment

1.8.2 Support and Handling Equipment

1.8.3 Organization/Intermediate

1.8.4 Depot

1.9 Common Support Equipment

1.9.1 Test and Measurement Equipment

1.9.2 Support and Handling Equipment

1.9.3 Organization/Intermediate

1.9.4 Depot

1.10 Operational/Site Activation

1.10.1 System Assembly, Installation and Checkout on Site

1.10.2 Contractor Technical Support

1.10.3 Site Construction

1.10.4 Site/Ship/Vehicle Conversion

1.10.5 Sustainment/Interim Contractor Support

1.11 Industrial Facilities

1.11.1 Construction/Conversion/Expansion

1.11.2 Equipment Acquisition or Modernization

1.11.3 Maintenance (Industrial Facilities)

1.12 Initial Spares and Repair Parts

1.12.1 Provisioning Requirements

1.12.2 Initial Spares Budget

1.12.3 Procurement Package

1.12.4 Provisioning Guidance Conference

1.12.5 Method of Spares Procurement

File details come from the government source that posted it. Updated .