Attachment_10_-_Work_Breakdown_Structure.pdf
PDF 190 KB Posted
- Solicitation number
- FA8210-16-R-5000
About this file
Attachment 10
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 ATTACHMENT 10 ARTS PROGRAM Date: 1/7/2016
1.1 ARTS System - Prime Mission Product (PMP)
1.1.1 Platform
1.1.2 Radar
1.1.3 Electro Optical
1.1.4 Physical Representation (Shell)
1.1.5 Communications
1.1.6 Auxiliary Equipment
1.1.7 Software Release
1.1.8 Prime Mission Product (PMP) Subsystem Integration, Assembly, Test and Checkout
1.2 ESSS Software Support Station (including all HW tools)
1.3 System Engineering
1.3.1 Systems Engineering Plan (SEP)
1.3.2 Technical Reviews
1.3.3 Configuration Management
1.3.4 Programmatic Environment, Safety and Occupational Health Evaluation (PESHE)
1.3.5 Corrosion Prevention & Control
1.3.6 Modular Open Systems Approach (MOSA)
1.3.7 Data management
1.3.8 Item Unique Identification (IUID)
1.3.9 Spectrum Supportability
1.3.10 Operational Safety, Suitability and Effectiveness (OSS&E)
1.3.11 Interface Control
1.3.12 Reliability/Maintinability/Supportability
1.3.13 Human System Interface (HSI)
1.3.14 Quality Assurance
1.3.15 System Requirements
1.4 Program Management
1.4.1 Charter
1.4.2 Program Control (C/S/P Measurement)
1.4.3 Risk Management
1.4.4 Contracting
1.4.5 Acquisition Support
1.4.6 Logistics Management
1.4.7 Packaging, Handling, Storage and Transportation (PHS&T)
1.4.8 Depot Source of Repair (DSOR)
1.4.9 Finance
1.4.10 Security
1.5 System Test and Evaluation
1.5.1 DevelopmentalTest and Evaluation
1.5.2 Operational Test and Evaluation
1.5.3 Mock-ups / System Integration Labs (SILs)
1.5.4 Test and Evaluation Support
1.5.5 Test Facilities
1.5.6 Test and Evaluation Master Plan (TEMP)
1.6 Training
1.6.1 Equipment
1.6.2 Services
1.6.3 Facilities
1.7 Data
1.7.1 Technical Publications
17.2 Engineering Data
1.7.3 Management Data
1.7.4 Support Data
1.7.5 Data Depository
1.8 Peculiar Support Equipment
1.8.1 Test and Measurement Equipment
1.8.2 Support and Handling Equipment
1.8.3 Organization/Intermediate
1.8.4 Depot
1.9 Common Support Equipment
1.9.1 Test and Measurement Equipment
1.9.2 Support and Handling Equipment
1.9.3 Organization/Intermediate
1.9.4 Depot
1.10 Operational/Site Activation
1.10.1 System Assembly, Installation and Checkout on Site
1.10.2 Contractor Technical Support
1.10.3 Site Construction
1.10.4 Site/Ship/Vehicle Conversion
1.10.5 Sustainment/Interim Contractor Support
1.11 Industrial Facilities
1.11.1 Construction/Conversion/Expansion
1.11.2 Equipment Acquisition or Modernization
1.11.3 Maintenance (Industrial Facilities)
1.12 Initial Spares and Repair Parts
1.12.1 Provisioning Requirements
1.12.2 Initial Spares Budget
1.12.3 Procurement Package
1.12.4 Provisioning Guidance Conference
1.12.5 Method of Spares Procurement
File details come from the government source that posted it. Updated .