This document contains an attachment to be filled out as part of a federal solicitation for the acquisition of T-38 wings. The solicitation will require detailed past performance information on relevant previous contracts, including a summary of work performed, product details, production rates, technical data used, critical safety item management, manufacturing processes and controls, and quality assurance processes. Offerors must provide points of contact for primary customers on government and commercial contracts fulfilling program manager, contracting officer, and administrative contracting officer roles. Any unique technical aspects of previous contracts should also be addressed. Information on compliance with requirements to utilize small businesses is to be included. The pre-solicitation notice identifies the solicitation number, name of the opportunity as the T-38 Wing Acquisition, the issuing agency as the Department of the Air Force Materiel Command Lifecycle Management Center, and notes a change to the contracting officer.
Section L Attachment 5 Past Performance Information Sheet Supplement
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 5
PAST PERFORMANCE INFORMATION SHEET SUPPLEMENT
(TO BE FILLED OUT BY OFFEROR)
Provide the information requested in this form for each contract/program (citation) being described.
Provide frank, concise comments regarding the contracts identified. Provide a separate completed form for each contract/program submitted.
A. Offeror Name (Company/Division): ____________________
CAGE Code: ____________________
DUNS Number: ____________________
B. Program Title: ____________________
C. Contract Specifics:
1. Contracting Agency or Customer _____________________________________________
2. Contract Number__________________________________________________________
3. Contract Type __________________________
4. Period of Performance __________________________
5. Original Contract $ Value _________________ (Do not include unexercised options)
6. Current Contract $ Value _________________ (Do not include unexercised options)
7. If Amounts for 5 and 6 above are different, provide a brief description of the reason
D. Detailed Description of Effort
(Please indicate whether it was development and/or production, or other acquisition phase (or Service) and highlight portions considered most relevant to the T-38 -33 wing solicitation.)
Offerors shall provide detailed information specific to each contract to cover the list below, if applicable, (and any other items the Offeror deems relavent to the solicitation) and show the connections in scope, design, complexity, and processes expected in the solicitation (e.g. specific examples, detailed data, graphics, drawings, etc).
1. Summary of Work Performed Summarize the work performed on the cited contract; state the overall role of the contractor in this effort
2. Description of Product State product details, part materials and product forms, type of parts, size (length, width, thickness), complexity, etc
3. Part Quantity
Number of parts per assembly (not including fasteners)
4. Production Rate/Quantity (entire contract) Average production rate, maximum production rate, and total production quantity
5. Technical Data Interpretation Discuss the technical data provided and the process to verify created 3D models; if applicable, 2D drawing interpretation, lofted surfaces, process to translate this into a 3D solid model, and model verification
6. Critical Safety Item (CSI) Management Discuss internal and sub-tier qualification for CSIs as well as management processes for CSIs
7. Manufacturing Processes and Controls State manufacturing process and controls to include, but not limited to:
a. Obtain required materials with applicable material certifications
b. Design/build/obtain specialized tooling to aid in manufacturing of parts
c. Machine parts
d. Form/contour/manipulate large and small extrusions and unformed stock
e. Post process (i.e. heat treat, peen, anodize, plate, coat)
f. Apply metrology and inspection for dimensional conformity
g. Perform nondestructive inspection
8. Quality Assurance Processes
Provide examples of quality assurance processes (for example: internal level of production planning to produce the asset, quality controls for management of subcontractors, rejection tag used on the asset, and/or documented MRB process on the asset)
E. Completion Date:
1. Original delivery date: ____________________
2. Current Schedule: ____________________
3. Estimate at Completion: ____________________
4. How Many Times Changed: ____________________
5. Primary Causes of Change: _______________________________________________________
F. Primary Customer Points of Contact: (For Government contracts provide current information on all three individuals. For commercial contracts, provide points of contact fulfilling these same roles).
1. Program Manager and/or Site Manager:
Name ____________________
Office ____________________
Address________________________________________
Telephone__________________
FAX Number_______________
2. Contracting Officer:
Name ____________________
Office ____________________
Address________________________________________
3. Administrative Contracting Officer:
Name ____________________
Office ____________________
Address________________________________________
G. Address any technical (or other) area about this contract/program considered unique.
H. Include relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting.