This document provides instructions for completing the Past Performance Information (PPI) Tool for a federal solicitation. It outlines a multi-step process for entering business relationships, past performance records, and submitting the completed PPI Tool and reports. Offerors must identify all prime and subcontractors for the proposed effort. The PPI Tool requires entering detailed contract information, descriptions of past efforts, points of contact, and explanations of relevance to the technical requirements. Hard copies and an electronic copy of the completed PPI Tool are to be submitted as part of the proposal. The related pre-solicitation notice provides early notice of an upcoming solicitation for T-38 Wing Acquisition requirements to be issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base.

Section L Attachment 1 EZ Source Instructions

View the file

Other files for this federal contract opportunity

Other files attached to T-38 Wing Acquisition, newest first.
File Type Posted
T-38_Wing_RFP_-_Industry_Questions_and_Answers_V4.pdf PDF
EDL_Revision_31_Updated_28Mar2019_T-38_Wing_NSN_1560-01-527-3968XE.pdf PDF
T-38_Wing_RFP_-_Industry_Questions_and_Answers_V3.pdf PDF
SOW_Attachment_C_-_Critical_Safety_Item_(CSI)_List_Rev_F.pdf PDF
FA820819R0001_Revised_27_March_2019.pdf PDF
Section_L_Revised_27_March_2019.pdf PDF
Section_L_Attachment_7_Cross_Reference_Table_(v2).pdf PDF
T-38_Wing_RFP_-_Industry_Questions_and_Answers_V2.pdf PDF
T-38_Wing_RFP_-_Industry_Questions_and_Answers_V1.pdf PDF
FA820819R0001_Revised_20_Feb_19.pdf PDF
SOW_Attachment_C_-_Critical_Safety_Item_(CSI)_List_(21_Feb_2019).pdf PDF
Section_L_Attachment_6_-TEP_Pricing_Matrix_Revised_14_Feb_19.xlsx XLSX spreadsheet
Section_L_Attachment_4_Past_Performance_Questionaire_Rev_14_Feb_19.pdf PDF
Section_L_Revised_21_Feb_2019.pdf PDF
FA820819R0001.pdf PDF
EDL_Revision_29.pdf PDF
ppi_tool.accdb MDB file
SOW_Attachment_E_--_Analysis_Requirements_for_Non-Conformances_MRB_Process.pdf PDF
SOW_Attachment_A_--_Contract_Data_Requirements_List.pdf PDF
Section_L_Attachment_7_--_Cross_Reference_Table.pdf PDF
Section_L_Attachment_5_--_Past_Performance_Information_Sheet_Supplement.pdf PDF
Source_Qualification_Statement.pdf PDF
SOW_Attachment_D_--_Interchangeability_and_Replaceability_List.pdf PDF
462.pdf PDF
Section_L_Attachment_3_--_Past_Performance_Client_Authorization_Letter.pdf PDF
Section_L.pdf PDF
SOW_for_Packaging.pdf PDF
Section_L_Attachment_4_--_Past_Performance_Questionaire.pdf PDF
SOW.pdf PDF
Section_L_Attachment_6_--_TEP_Pricing_Matrix.xlsx XLSX spreadsheet
SOW_Attachment_C_--_Critical_Safety_Item_(CSI)_List.pdf PDF
FA820819R0001.pdf PDF
Packaging.pdf PDF
SOW_Attachment_B_--_CDRL_Distribution_List.pdf PDF
Section_M.pdf PDF
Special_Packaging_Instructions_(SPI).pdf PDF
Section_L_Attachment_2_--_Past_Performance_Consent_Letter.pdf PDF
SOW_Attachment_F_--_Master_Tool_List.pdf PDF
RFP_QAs.pdf PDF
Synopsis_18_Jan_2019.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

EZ SOURCE INSTRUCTIONS

Downloading the PPI Tool The PPI Tool can be downloaded by performing the following steps (if you are unable to download the Tool, contact the contracting officer for assistance):

1. Access the FedBizOpps (https://www.fbo.gov/) website.

2. Find the solicitation posting.

3. Locate the “ppi tool” link from the “All Files” column on the solicitation’s “Notice Details” tab .

4. Select the link and save the “ppi tool” to your computer. Name the file as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA8224-13-R-DOCAT3.mdb).

Note: PPI Tools saved in Microsoft version 2007 and greater will be saved with “.accdb” file extension.

Entering information in the PPI Tool After selecting and saving the tool, enter information by performing the following steps:

1. Open the saved PPI Tool.

2. Select the “Options” button from the “Security Warning” banner, if applicable

. The “Security Alert” pop-up screen displays.

Figure 1: Security Alert Pop-up

Note:

• Files saved using Microsoft Office 2010 will have the “Enable Content” button on the “Security Warning” banner and therefore will not get a Security Alert pop-up.

• If a "read only" file is opened, in order to populate data in the file, click "Save As" in the

"Read-Only" message bar. Enter the filename as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA8224-13-R-DOCAT3.mdb).

3. Select the radio button “Enable this content” and then click “OK.” A setup pop-up screen displays.

https://www.fbo.gov/

Figure 2: Setup Pop-Up

4. Select the “Start” button. The “Application Setup” screen displays.

Figure 3: Application Setup Screen

5. Enter the Offeror’s Name and RFP Number and then click the “Next” button. The application setup continues.

Figure 4: Continue the Application Setup

6. Choose the appropriate option by selecting the corresponding radio button and then click the

“Next” button. The “Contractor’s Menu” displays.

Figure 5: Contractor’s Menu

7. Click the “Step 1: Set up Business Relationships” button to create a business relationship, if applicable, for each contributing contracting organization before proceeding throughout the PPI Tool (refer to Section L of the RFP for detailed instructions). Identify all prime and sub-prime organizations and categorize them according to the appropriate role in the proposed acquisition. The “Business Relationships” screen displays.

Figure 6: Business Relationships

8. Click the “New” button to create a business relationship for the proposed acquisition. An additional “Business Relationships” screen displays.

Figure 7: Enter New Business Relationship

9. Complete the fields as follows (fields marked on the screen with an asterisk ‘*’ are required):

• Contractor’s Name: Self-explanatory

• Role in Proposed Acquisition: Choose one of the four options – Prime, Sub, Joint

Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

• Place of Work: Location where contractor will perform work.

• Percentage of Work: Identify percentage of work contributed by specified contracting organization.

• Responsibilities: Detail responsibilities of specified contracting organization.

10. Select one of the buttons at the bottom of the screen.

• Add – Saves the current business relationship and allows for the addition of a new one.

• Close – Cancels the current business relationship without saving.

Note: In order to edit or delete an existing business relationship in the list, double-click on it.

11. Select the “Close” button on the “Business Relationships” screen after all of the business relationships has been added.

12. Click the “Step 2: Enter Past Performance Information (PPI)” button to enter the Past Performance Information. The “Past

Performance” screen displays.

Figure 8: Past Performance

13. Click the “New” button to enter Past Performance Information for the proposed acquisition.

An additional “Past Performance” screen displays.

Figure 9: Enter Past Performance Information

14. Complete the fields on each of the tabs as follows (fields on the screen marked with an asterisk ‘*’ are required):

• Contract Information Tab Contractor: Select from the dropdown the appropriate contractor.

Cage Code: Self-explanatory.

Contract Number: If you don’t have a contract number, enter “N/A.”

Program Title: Enter full name of program.

Contracting Agency/Customer: Enter servicing contracting agency and customer

(office symbols suffice).

DUNS Number: Self-explanatory Delivery Task/Order: If the order is provided as a stand-alone reference, enter the task/call/delivery/purchase order number.

Contract Type: Enter Firm-Fixed-Price (FFP), Cost Plus Fixed-Fee (CPFF), Indefinite Delivery/Indefinite Quantity (ID/IQ), LH, Blanket Purchase Agreement (BPA), Cost Plus Incentive-Fee (CPIF), Cost Plus Award Fee (CPAF), etc. For additional clarification, click the question mark button.

Short Program Title (i.e. Acronym): Enter abbreviated title for the program or enter “N/A.”

Contract Dollar Value:

o Original: Input total contract dollar value, with all options if applicable, in the amount originally awarded on the referenced contract.

If ID/IQ or BPA, provide total ceiling.

If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

o Current: Input total contract dollar value, with all options if applicable, as the contract stands at time of PPI submission.

If ID/IQ or BPA, provide total ceiling.

If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

Period of Performance (mm/dd/yy) o Start Date: Input start date of contract.

o Original End Date: Input original end date based on award.

o Current End Date: Input end date, as the contract stands at time of PPI submission.

o Explain the differences in Period of Performance, if applicable: Enter an explanation of the difference between “Original End Date” and “Current End Date.”

• Program Details Tab Brief Description of Effort as:

o Select Prime, Sub, Joint Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

o Provide a brief description of the service provided and actual work performed under this contract reference.

o ****If applicable: Provide information on problems encountered on the identified contracts. At a minimum, briefly describe the problem experienced, actions taken to alleviate the problem, and whether or not the problem was satisfactorily overcome.****

Explain how your experience on this program is relevant for each sub-factor under the Technical Factor in Section M of the RFP, including any unique aspects that demonstrate relevancy in this effort. Provide evidence to support how the contract referenced has relevant experience and demonstrates the ability to perform the solicitation requirements as described in Section M of the RFP. As applicable, address how the proposed reference relates to each of the Technical Sub-factors.

• POC & Key Individuals Tab Customer Points of Contact: Click the “Program/Site Manager,” “Contracting

Officer” or “Admin POC” button for the point of contact that you would like to add, edit, or delete.

Note: For government contracts provide current information on Program Manager, Contracting Officer, and Admin POC, if available.

15. Select from the buttons at the bottom of the Past Performance screen:

• Save – Saves the Past Performance Information and displays the “Contract Information” tab on the Past Performance screen.

• Close – Closes the Past Performance screen. If there were any updates, a pop-up window displays asking to save before closing.

• Delete – Deletes the current PPI record. A pop-up window displays, select “Yes” to delete the record or “No” to close the window without deleting the record.

Note: In order to edit or delete an existing PPI record in the list, double-click on it.

16. Select the “Close” button on the “Past Performance Information” screen after all of the PPI records have been added.

Printing Reports and Submitting PPI Tool In order to print the Business Relationships and PPI reports, perform the following steps:

1. Click the “Step 3: Print Report” button . A pop-up displays asking which report to print.

Figure 10: Select Report to Print

2. Select separately each of the two options, “Business Relationships” or “Past Performance.”

The Business Relationships and Past Performance documents will print separately; combine the two to create your Past Performance Volume.

In order to submit the Business Relationships and PPI, perform the following steps:

3. Click the “Step 4: Submit” button . The “Submission Instructions” screen displays.

Figure 11: Submission Instructions

4. Follow the submission instructions. Hard copies of the pages generated from this tool shall be used in the hard copy of the Past Performance Volume subject to the limitations outlined in this RFP and should be Tab 1 of the Past Performance Volume.

Note:

• Submit an electronic copy (e.g. CD) of the saved PPI database file with your proposal. Enter the filename as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA8224-13-R-DOCAT3.mdb).

• Once the file is saved to a CD or any location that is marked as “Read-only,” it must first be saved to the desktop in order to read/edit the file.

Entering information in the PPI Tool
Figure 1: Security Alert Pop-up
Figure 2: Setup Pop-Up
Figure 3: Application Setup Screen
Figure 4: Continue the Application Setup
Figure 5: Contractor’s Menu
Figure 6: Business Relationships
Figure 7: Enter New Business Relationship
Figure 8: Past Performance
Figure 9: Enter Past Performance Information
Printing Reports and Submitting PPI Tool
Figure 10: Select Report to Print
Figure 11: Submission Instructions
Note:

File details come from the government source that posted it. Updated .