This document contains answers to additional industry questions regarding a final solicitation for the Ground Subsystems Sustainment Contract (GSSC) 2.0. The solicitation seeks proposals to provide sustainment services for the Minuteman III intercontinental ballistic missile ground systems through the award of both cost-reimbursable and fixed-price task orders. Key details include that the deadline for offerors to submit technical questions is May 31, 2019; the contract will be awarded by the Department of the Air Force Materiel Command; incumbent contractors include BAE Systems and Tecolote Research; and a bidder's library CD is available upon request to assist offerors in developing proposals for this effort. Offerors must also ensure they have a current DD2345 on file through the Joint Certification Program website.
Answers to Industry Questions V6
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSSC 2.0
Answers to Additional Industry Questions to RFP Amendment 1
Posted 2 May 2019
1) The descriptions of CLIN 0004, 1004, 2004, 3004, 4004, and 5004 have been updated to read as follows:
“MATERIAL This is a Cost Reimbursable No - Fee CLIN in support of each individual task order's Material requirements for GSSC 2.0. The purpose of this CLIN is for the reimbursement of direct and indirect costs related to material. Any costs charged to this
CLIN shall not be duplicated under any other CLINs.”
2) The Government recognizes that the effort contractor personnel put in to procuring and managing material can impact the risk on the contract and potentially add benefit to the
Government. The Government’s intent of not including fee on the materials CLIN is not to ignore or disregard the risk and technical expertise required to procure and manage material on the GSSC 2.0 contract. The intent of this CLIN structure is to reimburse direct material costs along with associated burden costs. Labor costs dedicated to planning and managing materials/subcontracts should be bid and billed under the Work
Scope CLIN (labor CLIN), where the profit or fee is included.
3) The support contractors the H.002 clause currently apply to are BAE Systems, Inc., and
Tecolote Research, Inc. These two contractors were not specifically listed on the clause because the GSSC 2.0 contract will outlast the contracts BAE and Tecolote are currently working under. This clause applies to all contractors who provide technical support, technical review, and acquisition management support to the Government on the ICBM
Ground Subsystems.
4) A complete list of contractors providing Systems Engineering Support and/or technical direction to AFGSC is not available to provide to offerors. What drove the need for the
H.005 clause was because Summit Technical Solutions (STS), who does provide Systems
Engineering Support and technical direction to AFGSC showed interest in participating in GSSC 2.0 during one of our Industry Days. STS was not mentioned specifically in the clause because the clause may not exclusive to them, and the GSSC 2.0 contract will outlast the contract STS has with AFGSC. If another contractor replaces STS, the clause would then apply to the new contractor.
5) PWS
a. Page 41 of General Sustainment PWS paragraph 1.4.3.3.5.6, removed “(A126, DI-MGMT-81642, Small Business Subcontractor Report)”
b. Page 69 of General Sustainment PWS Appendix E CDRL A126 was removed
c. Page 10 of General Sustainment CRDL Package, CDRL A126 title was changed from, “Small Business Subcontractor Report” to “RESERVED”
d. Page 113 of General Sustainment CDRL package, Information was deleted but blank form will remain as place holder for possible future use.
6) The Government intentionally selected the wording of the sample tasks in Sections L &
M in order to avoid steering offerors into specific answers that would remove the ability to discriminate between responses. Offerors shall provide the assumptions and details with their proposals that provide the best technical solution at the best value.
7) The GRID for each awardable task order (Section J, Attachments 2a-2g) have been updated as follows:
a. The second check box within Paragraph (d) of the GRID for each awardable task order (Section J, Attachments 2a-2g) has been updated as follows:
From: “Specific technical data will be delivered with SNLR as follows, see table below.”
To: “Specific non-technical data will be delivered with SNLR as follows, see table below.”
b. Title of GRID attachments have changed as follows:
i. “Attach 2a General Sustainment GRID Rev 1”
ii. “Attach 2b IOSSP Sustainment GRID Rev 1”
iii. “Attach 2c HAC RMPE CLS GRID Rev 1”
iv. “Attach 2d Trainers CLS GRID Rev 1”
v. “Attach 2e GMATS CLS GRID Rev 1”
vi. “Attach 2f SACCS CLS GRID Rev 1”
vii. “Attach 2g ALCS Sustainment GRID Rev 1”
8) Attachment 6 Cross Reference Matrix is being re-attached to remove the tab titled “New
Matrix” as this is was the old version. The tab with the current version is titled “Cross
Ref Matrix”
9) Attachment 8, Offeror Labor Category Description and Mapping, has been edited.
a. Instruction #4 has been edited to read: “Each of the 103 Government labor
Categories (Attachment 7) must have a minimum of one offeror labor category mapped.”
b. Attachment 8 has been renamed, from “Attach 8 Offeror Labor Category
Description and Mapping” to “Attach 8 Offeror Labor Category Description and
Mapping Rev 1”
10) Section L,
a. Paragraph 1.4.10 has been updated to allow for readable PDF submissions, making it consistent with Paragraph 1.4.3.2.
b. Paragraph 4.1.7, was edited to clarify required Section J Attachments
c. Cross Reference Matrix requirement in Vol II Organization Table Section
Paragraph 3.8 was removed
d. Teaming Arrangement page limit was increased to maximum of 40 pages.
11) Any material and travel costs offerors will be proposing for the five sample tasks should be bid within the specific sample task tab of the TEP to which those costs pertain to. A travel cost line has been added to each sample task tab. In addition, Instruction #2 of each sample task has been updated to state that cost categories can be added or subtracted as necessary. IAW Section L, Paragraph 3.2.2, travel and material costs for the awardable task orders shall be proposed in Section J, Attachment 5, Pricing Matrix for the first year only and will not be included in the TEP.
a. Attachment 14 TEP Workbook, was edited to add verbiage, add travel cost line, and update formulas.
b. Renamed attachment from “Attach 14 TEP Workbook Amend 1” to “Attach 14
TEP Workbook Rev 2”.
12) The following documents will be added to the Bidder’s Library:
– D2-27438-1: SELM Control Monitor A4 Microprocessor CCA firmware description
- 21-61576: SELM Control Monitor Functional Test
- Drawing D180-18228-1
Data Custodians will be notified when the Bidder’s Library V2 disc that will include these additional drawing, is available.
13) Drawing 25-76184-31, Sheet 4 SELM Cable Set (Type II) was not available to be provided with the Bidder’s Library.