This is a solicitation for the Ground Subsystems Sustainment Contract (GSSC) 2.0. The solicitation requires offerors to submit technical questions by 31 May 2019 and provide a DD2345 showing current Joint Certification Program registration. The incumbent contractor will provide sustainment services for ground subsystems under the supervision of the Department of the Air Force Materiel Command. The contractor must meet requirements for products, services, plans, reports, and briefings as detailed in the attached exhibit package, with deliverables submitted through the TopVue portal. The initial period of performance is one base year with four optional one-year extensions.
CDRL Package
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Data Requirements List (CDRL) Program: Grounds Subsystem Support Contract (GSSC) 2.0 Date: 14 March 2019 Version: 5
1. Introduction This document was developed in accordance with DOD MIL-STD 31000A and represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Technical Data Package, is to define the data deliverables due for this program, including the instructions for their development, and delivery. All specific delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.
2. General Guidelines The CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the Government, as well as the frequency and approval requirements. The Data Item Descriptions (DID), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization Information System (ASSIST) and provide additional direction for data preparation.
3. Communications Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NIES) and the cognizant program manager (PM). Copies of all forms & templates noted in this file are available as requested from your program manager, the DMO or your PCO.
4. Codes used in the DD Form 1423 The directions for submittal and approval of data is indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15 or 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.
4.1 Block 7, DD Form 250 Requirements
Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and “Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements.
Information copies of DD Form 250 to accompany each letter of transmittal for this category of data.
Code Inspection Acceptance SS Source (DD Form 250 or equivalent document) Source (DD Form 250 or equivalent document)
DD Destination (DD Form 250 or equivalent document)
Destination (DD Form 250 or equivalent document)
SD Source (DD Form 250 or equivalent document)
Destination (DD Form 250 or equivalent document)
DS Destination (DD Form 250 or equivalent document)
Source (DD Form 250 or equivalent document)
Code Inspection LT Letter of Transmittal only NO No inspection or acceptance required
XX Inspection and acceptance requirements specified elsewhere in contract S Indicates the contractor’s facility D Indicates the primary destination point
4.2 Block 8, Approval Code
When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA). When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.
Code Description A Approval Required N/A Approval Not Required
4.3 Block 10, Frequency of Submittals
Code Description DAILY Daily WEKLY Weekly BI-WE Each 2 weeks MTHLY Monthly BI-MO Each 2 months QRTLY Quarterly ANNLY Annually SEMIA Each 6 months OTIME One time ONE/R One time and revisions R/ASR Revisions as required ASGEN As generated ASREQ As required* DFDEL Deferred delivery DFORD Deferred ordering DFREQ Deferred requisitioning ONE/P One time preliminary draft XTIME Multiple separate submittals (i.e., 2Time, 3Time)
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.
4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions
Code Description ATP Authority To Proceed ASGEN As generated ASREQ As required* CDR Critical Design Review CA Contract Award CO Change Order CD Calendar Day(s)
CP/REQ Change page/as required CP/O Change page/(only) DCARC Defense Cost and Research Center DFDEL Deferred delivery FQT Formal Qualification Test FCA Functional Configuration Audit PCA Physical Configuration Audit TRR Test Readiness Review SA Supplemental Agreement WD Working Day(s)
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.
5. Supplemental Data Preparation Instructions
5.1 Data Item Description (DID) Version
The most current version of the DID at the time of the award of the contract or Task Order, whichever date is most current, specified in Block 4, is to be used when submitting data. The most current version can be found at http://quicksearch.dla.mil/.
5.2 DID Tailoring
The DID is a specification for the preparation of data. DID tailoring is reflected in Block 16 of the CDRL form. “T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement (PWS) or Statement of Objectives (SOO).
5.3 Distribution Statement Marking
The designation in Block 9 of the CDRL form indicates that one of the following six (6) authorized distribution statements from Department of Defense Instruction (DoDI) 5230.24 and Air Force Instruction (AFI) 61-201 shall be annotated on that technical data. Distribution statements will be selected to denote the audience the data is intended for: A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD 5200.1 Volume 2. Should Block 9 of the CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking technical documents:
Distribution Statement A:
Approved for public release. Distribution is unlimited.
Distribution Statement B:
Distribution authorized to U.S. Government Agencies for Administrative or Operational Use (date of determination). Other requests for this document shall be referred to AFNWC/NI.
Distribution Statement C:
Distribution authorized to U.S. Government Agencies and their contractors (fill in reason) (date of determination). Other requests for this document shall be referred to AFNWC/NI.
Distribution Statement D:
Distribution authorized to Department of Defense and U.S. DoD contractors only for Administrative or Operational Use and Export Control (date of determination). Other requests shall be referred to
AFNWC/NI.
http://quicksearch.dla.mil/
Distribution Statement E:
Distribution authorized to DoD Components only for Test and Evaluation (date determination).
Other requests shall be referred to AFNWC/NI.
Distribution Statement F:
Further dissemination only as directed by
AFNWC/NI.
5.4 Other Notices
All technical documents marked with Distribution Statements B, C, D, E, or F will also be marked with the following notices:
WARNING:
This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Add the following statement to the bottom of every page of the report except the SF 298, Report Documentation Page: “WARNING: EXPORT CONTROLLED.”
NOTE: The CDO Program Manager (PM) may remove the “Export Control Warning” if “critical technology” is not a reason annotated in the distribution statement and if the CDO PM can verify the technical report/document is not export control.
Destruction Notice:
Documents designated as Distribution B, C, D, E, or F shall be marked with one of the following statements:
For classified documents:
DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, DoDM 5200.01-V3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17 or AFI 16-1404, Air Force Information Security Program, para 5.2.5.
For unclassified, limited documents:
DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
5.5 Pricing CDRL Items Separately
If blocks 17 and 18 of the DD form 1423 documents are marked as "N/A" and "NSP" respectively, then the Government does not want to separately group or price CDRL items. If blocks 17 and 18 are left blank, the Government intends to seek separate pricing for the development costs of each CDRL. This pricing is for development costs of the data items and is considered separate from data rights costs.
6. Supplemental Data Delivery Instructions
6.1 Due Dates
Due dates for delivery of data are to be construed as receipt at destination. Due dates are based on calendar days unless otherwise noted.
6.2 Late Delivery
Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain Time on the date specified in Blocks 12, 13 or 16 of the CDRL.
6.3 Submittal Procedures
6.3.1 CDRL Submittal Procedure
For the purposes of data submittal, unclassified CDRLs are submitted to the government via TopVue https://icbm.topvue.com/topvue-icbm/. As per contractors must have, at the very least, a T-1 THIS IS FOR UNCLASSIFIED CDRL SUBMITTALS ONLY. (See below for Classified CDRL submittals (6.3.2)) Each data submittal shall be accompanied by a Contract Document Action (CDA) form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:
1. Contract number
2. CDRL sequence number (i.e., A001)
3. Exact title and subtitle (if applicable) of the document being transmitted
4. Line item or CLIN number
5. Modification Number or Order Number
4. Document date, number, and revision information (if applicable)
5. Data delivery method and date of delivery
6. Whether the document is a draft, or final submittal
7. For approval data: State “For Approval”
8. If the document is a re-submittal, reference the Government letter Contractual Document Action (CDA) requesting re-submittal or disapproval of previous submittal
9. For periodic reports: The report period that the document covers
10. Distribution: Information disclosing the total contractual distribution being made per Block 14, or Block 16 of the CDRL Form
6.3.2 Classified CDRL Submittal Procedure
Classified CDRLs and classified documentation are submitted in accordance with this instruction and are never to be emailed. Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW Appendix B of the DD254 DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). For Classified Disks send two (2) copies.
Outer Envelope:
Address ATTN: Security Office/Document Control
Inner Envelope:
Address ATTN: Name of person for whom the document should be delivered
7. Supplemental Data Review and Approval Process
7.1 Approval CDRLs
The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item. In addition, Block 16 of the form may contain additional directions.
Written Approval
Written approval indicates agreement or concurrence with the contractor furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract. The approval authority shall be ORG 1 as outlined in section 9 of this document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the Contractual Document Action (CDA) form, signed and dated by the representative stated in ORG 1. Data items submitted for approvals are NOT automatically approved without government approval.
Approved with Comment or Disapproved
The Contractor shall revise data items Approved with Comments or Disapproved in accordance with the specific written comments transmitted with the CDA or PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the Approval with Comments or Disapproval, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.
Draft Versions of the CDRL
If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval CDRL in advance of the final version, the draft will be considered an information only submission. However, the PCO/DMO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.
7.2 Contractual Document Action (CDA)
After the Government receives a data item submission, a Temporary Data Identification Number (TDID), a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data items approval or disapproval. Should the Government have comments on the data item; the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter in accordance with the format and timeline noted in block 16. Comments will be assigned one of the following codes:
COMMENT CODE CODE DESCRIPTION
C Critical Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., general officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment.
S Substantive Comments of a less serious nature that have noticeable impact on the documents quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.
A Administrative Comments that address minor items such as typographical, format and/or grammatical errors.
7.3 Information Only CDRLs
When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data item in accordance with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD
Form 1423.
8. Data Accession List (DAL) During performance of the contract, requests from the PCO for data ordered from the Data Accession List (DAL) (with the application of DID DI-MGMT-81453A) shall be provided at no increase in contract price. Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.
9. Organizational Cross Reference List The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of a address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list.
ORG#/ Name Address Attention/To Contact Info ORG1/AFNWC/NIAG 60 30 Gum Ln Bldg 1217
Hill AFB UT 84056 Tyson Pippin tyson.pippin@us.af.mil
ORG2/AFNWC/NI N/A
ORG3/AFNWC/NI Varies ORG4/AFNWC/NIES 6054 Dogwood Ave Bldg 1255
Hill AFB UT 84056 CM afnwc.nies.icbm.conm@us.af.mil
ORG5/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
Software afnwc.nies.software@us.af.mil
ORG6/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
Quality afnwc.nies.quality.office@us.af.mil
ORG7/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
IUID/Parts Engineering afnwc.nies.partsengineering@us.af.mil
ORG8/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
Risk Management afnwc.nies.riskmgmt@us.af.mil
ORG9/AFNWC/NIEV 6053 Elm Ln Bldg 1245 Hill AFB UT 84056
Safety afnwc.niev.safetymanager@us.af.mil
ORG10/AFNWC/NIEV 6053 Elm Ln Bldg 1245 Hill AFB UT 84056
Security afnwc.niev.securitymanager@us.af.mil
ORG11/AFNWC/NIEV 6053 Elm Ln Bldg 1245 Hill AFB UT 84056
Environmental afnwc.niev.environmentalgroup@us.af.mi l
ORG12/AFNWC/NIEV 6053 Elm Ln Bldg 1245 Hill AFB UT 84056
Corrosion afnwc.niev.corrosiongroup@us.af.mil
ORG13/AFNWC/NIEV 6053 Elm Ln Bldg 1245 Hill AFB UT 84056
Nuclear Surety afnwc.niev.nuclearsuretymanager@us.af.
mil
ORG14/AFNWC/NIEV 6053 Elm Ln Bldg 1245 Hill AFB UT 84056
TOMA afnwc.niev.tomamodmanager@us.af.mil
ORG15/AFNWC/NIEI 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056
Assessment afnwc.niei.assessment@us.af.mil
ORG16/AFNWC/NIEI N/A
ORG17/AFNWC/NIEI 6054 Dogwood Ave Bldg 1255
Hill AFB UT 84056 EMI afnwc.niei.emirequests@us.af.mil
ORG18/AFNWC/NIEI N/A
ORG19/AFNWC/NIEI 6054 Dogwood Ave Bldg 1255
Hill AFB UT 84056 NHS afnwc.niei.nhs@us.af.mil
ORG20/AFNWC/NIEI N/A
ORG21/AFNWC/NIEE 6054 Dogwood Ave Bldg 1255 TE afnwc.niee.te@us.af.mil mailto:tyson.pippin@us.af.mil mailto:afnwc.nies.icbm.conm@us.af.mil mailto:afnwc.nies.software@us.af.mil mailto:afnwc.nies.quality.office@us.af.mil mailto:afnwc.nies.partsengineering@us.af.mil mailto:afnwc.nies.riskmgmt@us.af.mil mailto:afnwc.niev.safetymanager@us.af.mil mailto:afnwc.niev.securitymanager@us.af.mil mailto:afnwc.niev.environmentalgroup@us.af.mil mailto:afnwc.niev.environmentalgroup@us.af.mil mailto:afnwc.niev.corrosiongroup@us.af.mil mailto:afnwc.niev.nuclearsuretymanager@us.af.mil mailto:afnwc.niev.nuclearsuretymanager@us.af.mil mailto:afnwc.niev.tomamodmanager@us.af.mil mailto:afnwc.niei.assessment@us.af.mil mailto:afnwc.niei.emirequests@us.af.mil mailto:afnwc.niei.nhs@us.af.mil mailto:afnwc.niee.te@us.af.mil
Hill AFB UT 84056 ORG22/AFNWC/NIT 6053 Elm Ln Bldg 1245
Hill AFB UT 84056 Cybersecurity afnwc.ni.cybersecurity@us.af.mil
ORG23/AFNWC/NIET N/A
ORG24/AFGSC/A31 N/A
ORG25/AFNWC/NILA
6014 Dogwood Ave Bldg 1258
DEMIL
ORG26/406 SCMS/GULAB 6038 Aspen Ave Bldg 1289 SW Hill AFB UT 84056-5805
Provisioning 406scms.provisioning@us.af.mil
ORG27/406 SCMS/GULAA 7973 Utility Dr Bldg 1135 Hill AFB UT 84056
Packaging 406scms.gulaa.pack@us.af.mil
ORG28/419 SCMS/GUBA 6051 Gum Ln Bldg 1226 Hill AFB UT 84056
CAV AF 419scms.guba.worklfow@us.af.mil
ORG29/75 ABW/SE 7290 8th St Bldg 383
Base Safety
75abw.se.workflow@us.af.mil
ORG30/DCMA/ACO N/A
ORG31/AFNWC/NIF 6008 Wardleigh Rd Bldg 1580
Hill AFB UT 84056 Funds afnwc.nif.mmiii@us.af.mil
ORG32/AFNWC/PZBA 6008 Wardleigh Rd Bldg 1580 Hill AFB UT 84056
Corey Taggart corey.taggart@us.af.mil
ORG33/AFNWC/NIES 6054 Dogwood Ave Bldg 1255
Data Management afnwc.nies.datamgmtoffice@us.af.mil
10. CDRL Master Listing Index Full 1423’s for CDRL’s applicable to this program are included in section 11 of this document.
CDRL # DID TITLE DID #
A001 Integrated Program Management Report (IPMR) DI-MGMT-81861 A002 Conference Agenda (Meeting Agenda) DI-ADMN-81249 A003 Briefing Material DI-MGMT-81605 A004 Report, Record of Meeting/Minutes DI-ADMN-81505 A005 Statement of Work (SOW) DI-MGMT-81606 A006 Contract Work Breakdown Structure DI-MGMT-81334 A007 Program Management Plan DI-MGMT-81797 A008-1 Work Management Plan (DEMIL/Disposal Plan) DI-MGMT-81911 A008-2 Work Management Plan (Transition Plan) DI-MGMT-81911 A008-3 Work Management Plan (Scope Management Plan) DI-MGMT-81911 A008-4 Work Management Plan (Manual Procedures) DI-MGMT-81911 A008-5 Work Management Plan (Capabilities Maturity Model Index Plan) DI-MGMT-81911 A008-6 Work Management Plan (Nuclear Surety Program Plan) DI-MGMT-81911 A008-7 Work Management Plan (System Security Plan) DI-MGMT-81911 A010 Contractor’s Risk Management Plan DI-MGMT-81808 A011 Supplier's Configuration Management Plan DI-SESS-80858 A012 Contractor’s Corrective Action Plan DI-MGMT-80501 A013 Corrosion Prevention and Control Plan DI-MFFP-81403 A014 Counterfeit Prevention Plan DI-MISC-81832 A015-1 Quality Assurance Program Plan DI-QCIC-81794 A015-2 Quality Assurance Program Plan (Software Quality Assurance Plan) DI-QCIC-81794 A016 Implementation Plan DI-MGMT-81737 A017 Parts Management Plan DI-SDMP-81748 A018 Contract Funds Status Report (CFSR) DI-MGMT-81468 A019 Contract Summary Report DI-ADMN-80447 mailto:afnwc.ni.cybersecurity@us.af.mil mailto:406scms.provisioning@us.af.mil mailto:406scms.gulaa.pack@us.af.mil mailto:419scms.guba.worklfow@us.af.mil mailto:75abw.se.workflow@us.af.mil mailto:afnwc.nif.mmiii@us.af.mil mailto:corey.taggart@us.af.mil mailto:afnwc.nies.datamgmtoffice@us.af.mil
A020 Performance and Cost Report DI-FNCL-80912 A021 Cost Summary Report (CSR) DI-FNCL-81913 A022 Funds and Labor Hour Expenditure Report DI-FNCL-81537 A026 Status Report DI-MGMT-80368 A027 Product Drawings/Models and Associated Lists DI-SESS-81000/T A030 Specification Change Notice (SCN) DI-SESS-80643 A031 Engineering Change Proposal (ECP) DI-SESS-80639 A032 Interface Control Document (ICD) DI-SESS-81248 A033 System/Subsystem Specification DI-IPSC-81431 A034 Master Engineering Document Lists (MEDL) DI-MISC-82127 A035 Deficiency Report (DR) DI-PSSS-81535 A036 Request for Nomenclature (DD Form 61) DI-SESS-81254 A037 Request for Variance (RFV) DI-SESS-80640 A038 Technical Data Package DI-SESS-80776 A039 Design Review Information Package (DRIP) DI-SESS-81757 A040 Computer Software Product End Item DI-AVCS-80700 A041 Software Development Plan (SDP) DI-IPSC-81427 A042 Software Requirements Specification (SRS) DI-IPSC-81433 A043 Interface Requirements Specification (IRS) DI-IPSC-81434 A044 Software Design Description (SDD) DI-IPSC-81435 A046 Software Test Plan (STP) DI-IPSC-81438 A047 Software Test Description (STD) DI-IPSC-81439 A048 Software Test Report (STR) DI-IPSC-81440 A049 Software Product Specification (SPS) DI-IPSC-81441 A050 Software Version Description (SVD) DI-IPSC-81442 A052 Software User Manual (SUM) DI-IPSC-81443 A054 Automated Computer Program Identification Number (ACPIN) Data and Control Record DI-MISC-81454 A055 System Engineering Management Plan (SEMP) DI-SESS-81785 A057 Technical Report – Study/Services (Test and Evaluation Master Plan) DI-MISC-80508/T A058 Technical Report – Study/Services (Trade Studies) DI-MISC-80508/T A059 Technical Report – Study/Services DI-MISC-80508/T A059-1 Technical Report – Study/Services (Identify Items Not Listed) DI-MISC-80508/T A059-2 Technical Report - Study/Services (Transactions Affecting NWRM) DI-MISC-80508/T A059-3 Technical Report - Study/Services (Root Cause Analysis) DI-MISC-80508/T A059-4 Technical Report - Study/Services (Completion of Employee Training Report) DI-MISC-80508/T A059-5 Technical Report - Study/Services (Security Assessment) DI-MISC-80508/T A059-6 Technical Report - Study/Services (Quality Report) DI-MISC-80508/T A059-7 Technical Report - Study/Services (Software Analysis) DI-MISC-80508/T A059-8 Technical Report - Study/Services (Trending Analysis) DI-MISC-80508/T A059-9 Technical Report - Study/Services (Data Book) DI-MISC-80508/T A059-10 Technical Report - Study/Services (Close Loop Failure Analysis) DI-MISC-80508/T A059-11 Technical Report - Study/Services (Weapon System Assessment) DI-MISC-80508/T A059-12 Technical Report - Study/Services (Aging Surveillance Assessment) DI-MISC-80508B/T A059-13 Technical Report - Study/Services (Weapon System Effectiveness Report (WSER)) DI-MISC-80508B/T A059-14 Technical Report - Study/Services (Requirements Development and Analysis) DI-MISC-80508B/T
A059-15 Technical Report - Study/Services (Metrics to inclue Mean Time to Repair (MTTR), Meant Time Between Failures (MTBF), and Inherent Availability) DI-MISC-80508B/T
A059-16 Technical Report - Study/Services (SACCS Trouble Monitor report Analysis (STMR)) DI-MISC-80508B/T A059-17 Technical Report - Study/Services (Analytical Assessment and Evaluation) DI-MISC-80508B/T A059-18 Technical Report - Study/Services (Service Life Extension (SLE) Study) DI-MISC-80508B/T A059-19 Technical Report - Study/Services (Feasibility Study) DI-MISC-80508B/T
A059-20 Technical Report - Study/Services (Power and Grounding Study Study) DI-MISC-80508B/T A059-21 Technical Report - Study/Services (Mitigation Strategy Options) DI-MISC-80508B/T A059-22 Technical Report - Study/Services (Problem Log) DI-MISC-80508B/T A059-23 Technical Report - Study/Services (Watch List Report) DI-MISC-80508B/T A059-24 Technical Report - Study/Services (Non-availability Report) DI-MISC-80508B/T A059-25 Technical Report - Study/Services (Temporary Fix) DI-MISC-80508B/T A059-26 Technical Report - Study/Services (Quick Look Report) DI-MISC-80508B/T A060 Test Plan DI-NDTI-80566 A061 Test Procedure DI-NDTI-80603 A062 Test/Inspection Report DI-NDTI-80809 A065 System Safety Program Plan (SSPP) DI-SAFT-81626 A066 System Safety Hazard Analysis Report (SSHAR) DI-SAFT-80101 A067 Safety Assessment Report (SAR) DI-SAFT-80102 A068 Safety Studies Plan DI-SAFT-81066 A069 Safety Studies Report DI-SAFT-81065 A071 Accident/Incident Report DI-SAFT-81563 A072 Work Management Plan (Safety Plan (Appendix C)) DI-MGMT-81911 A074 Programmatic Environmental Safety and Health Evaluation (PESHE) Plan DI-ENVR-81840 A075 Technical Report- Study/Services (NEPA) DI-MISC-80508/T A076 Finish Specification DI-MFFP-81402 A077 Aircraft Nuclear Safety Analysis Report (NSAR) DI-NUOR-81405/T A078 Certification Requirements Plan (CRP) DI-NUOR-81409 A079 Engineering Evaluation Report (EER) DI-NURO-81411 A080 Nuclear Certification Impact Statement (NCIS) DI-NUOR-81888 A081 Technical Report – Study/Services (Nuclear Surety Evaluation Report (NSER) DI-MISC-80508/T A082 Electromagnetic Interference Control Procedures (EMICP) DI-EMCS-80199 A083 Electromagnetic Interference Test Procedures (EMITP) DI-EMCS-80201 A084 Electromagnetic Interference Test Report (EMITIR) DI-EMCS-80200 A089 Nuclear Hardness and Survivability (NH&S) Program Plan DI-ENVR-82097 A090 Nuclear Hardness and Survivability (NH&S) Design Analysis Report DI-ENVR-80266 A091 Preservation & Packing Data DI-PACK-80120/T A092 Special Packaging Instructions (SPIs) DI-PACK-80121/T A093 Container Design Retrieval System (CDRS) Search Request DI-PACK-80683 A094 Container Design retrieval System (CDRS) Data Input DI-PACK-80684 A095 Performance Oriented Packaging Test Report DI-PACK-81059 A099 Commercial Asset Visibility Air Force (CAV AF)/ Government Furnished Material Report DI-MGMT-81634 A101 Failure Summary and Analysis Report DI-SESS-80255 A102 Failure Modes, Effects, and Criticality Analysis Report (FMECA) DI-SESS-81495 A103 Item Unique Identification (IUID) Marking Plan DI-MGMT-81803 A104 Item Unique Identification (IUID) Marking Activity, Validation and Verification Report DI-MGMT-81804 A105 Information Systems Accreditation Documentation DI-ADMN-80239 A106 Naval Aviation Program Protection Implementation Plan DI-MGMT-82144/T A107 Training Materials DI-ILSS-80872 A108 Status of Government Furnished Equipment (GFE) Report DI-MGMT-80269 A109 Commercial Off-the-Shelf (COTS) Manuals and Associated Supplemental Data DI-TMSS-80527 A110 Technical Manual contract Requirement (TMCR) TM 86-01 A111 Data Accession List (DAL) DI-MGMT-81453 A112 Report of Receipts, Inventory, Adjustments, and Shipments of Government Property DI-MGMT-80442 A113 Report of Shipping (Item) and Packaging Discrepancy DI-MGMT-80503 A114 Real Property Inventory Detail List DI-MGMT-80213 A115 NAVAIR Cybersecurity Implementation Plan DI-MGMT-82002/T
A116 System Assessment Report (SAR) DI-MGMT-80469 A117 Cybersecurity Vulnerability Report DI-MGMT-82191 A118 Software Quality Assurance Report DI-QCIC-81795 A119 Mathematical Model Finite Element Analysis Report DI-GDRQ-81257 A120 Critical Items List DI-RELI-80685 A121 Risk Management Status Report DI-MGMT-81809 A122 Parts, Materials, and Processes Selection List (PMPSL) DI-MISC-81277 A123 Integrated Logistics Support Plan DI-ILSS-80095 A124 Hardness Data Manual (HDM) Update DI-ENVR-82096 A125 Time Compliance Technical Order (TCTO) Reporting DI-MGMT-81325 A126 Small Business Subcontractor Report DI-MGMT-81642 A127 Bill of Materials (BOM) for Logistics and Supply Chain Risk Management DI-PSSS-81656 A128 Site Survey Report (SSR) DI-MISC-82104 A129 Contractor’s Progress, Status and Management Report DI-MGMT-80227 A130 Baseline Description Document DI-SESS-81121
A131 Department of Defense (DoD) Modeling and Simulation (M&S) Verification and Validation (V&V) Plan DI-MSSM-81751
A132 Department of Defense (DoD) Modeling and Simulation (M&S) Verification and Validation (V&V) Report DI-MSSM-81752
A133 Performance Specification Documents DI-SDMP-81465 A134 Repair Procedure DI-MGMT-81910 A135 System Problem Report – SPR DI-MGMT-81232 A136 Equipment Inventory Records (EIRS) DI-ILSS-81251 A137 Trip/Travel Report DI-MISC-81943 A138 Integrated Production Schedule (IPS) Report DI-MGMT-82075 A139 Contract Field Service Report DI-MGMT-81238 A140 Maintenance Service Report DI-MGMT-80995 A141 Operations Security (OPSEC) Plan DI-MGMT-80934 A142 Naval Aviation Supply Chain Risk Management (SCRM) Process DI-MGMT-82147/T A143 Customized Microelectronics Devices Source Protection Plan DI-MGMT-81763 A144 Security Verification Plan and Procedures DI-QCIC-81689 A145 Security Evaluation Document (SED) DI-MISC-81762 A146 Source/Vendor List DI-MGMT-80894 A147 Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report DI-QCIC-80125 A148 Security Vulnerability Analysis DI-MISC-80841 A149 Survivability Analysis Report DI-MISC-80564 A150 Threat Hazard Assessment DI-SAFT-81124 A151 Explosive Ordnance Disposal Data DI-SAFT-80931 A152 Reliability and Maintainability (R&M) Program Plan DI-SESS-81613 A153 TEMPEST Control Plan DI-EMCS-81687 A154 Special Equipment Tools and Test Equipment List (Support Equipment) DI-ILSS-80868 A155 Frequency Allocation Data DI-MISC-81174 A156 Level of Repair Analysis (LORA) Input Data DI-PSSS-81873 A157 Level of Repair Analysis (LORA) Report DI-PSSS-81872 A158 Certificate of Compliance DI-MISC-81356 A159 DoD Architecture Framework Documentation DI-MGMT-81644 A160 Reliability and Maintainability (R&M) Block Diagrams and Mathematical Models Report DI-SESS-81496 A161 Physical Inventories Report DI-MGMT-80259 A162 Spare Parts Usage Report DI-ILSS-80483 A163 Personnel Resumes (Labor Categroy Reporting) DI-MGMT-81597/T
11. DD Form 1423s (full 1423’s) *1423’s, block A Reference Number: CLIN number to be added at time of award **1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
GROUND SUBSYSTEM SUPPORT
CONTRACT (GSSC) 2.0
FA8204-19-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001
INTEGRATED PROGRAM MANAGEMENT
REPORT (IPMR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81861/T PWS Para TBD AFNWC/NIAG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION
LT MTHLY SEE BLK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A EOM SEE BLK 16
Reg
Repro
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL
BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 4:
1. All formats shall be submitted electronically in accordance with the
DoD-approved XML schemas located in the EVM Central Repository (EVM-CR) http://cade.osd.mil/tools/evm-tools.
2. All IPMR files must be electronically forwarded to the EVM-CR at the DCARC Web site at https://service.cade.osd.mil/DCARCPortal.
3. Only Formats 1, 4, 5, 6, and 7 are required. (Format 7 required only if program is greater than $20M)
4. Formats 1 4, & 6 shall be submitted using the DoD-approved cost XML guideline and schema.
5. Formats 5 shall be submitted in contractor format.
6. Format 7 shall be submitted using the DoD-approved time-phased cost
SML guideline and schema only when program is great than $20M.
7. IPMRs, when required from subcontractors, will be provided electronically using the DoD-approved SML formats.
8. Format 1 Instructions: Work Breakdown Structure (WBS) elements shall be reported in accordance with the PMO approved contractually required WBS. This is also known as the “Reporting Level.”
• The Government reserves the right, with prior notice, to request, if available, temporary visibility into WBS elements one level below the contractual WBS>
• Only ACWP, BAC, EAC, BCWWS, BCWP, SV, CV and VAC are required to be filled out for reporting purposes to the Government.
9. Format 2 Instructions: Not Required.
10. Format 3 Instructions: Not Required.
11. Format 4 Instructions:
EVM-CR
ORG1 (Lt of delivery only)
ORG2 (Lt of delivery only)
ORG32 (Lt of delivery only)
ORG33 (Lt of delivery only)
15. TOTAL 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
3/14/2019
X Nancy N. Baker Nancy N. Baker, GS-12 Data Manager Signed by: BAKER.NANCY.N.1239591376
See digital signature
3/15/2019
X Tyson S. Pippin Tyson S. Pippin, GS-13 Program Manager Signed by: PIPPIN.TYSON.S.1276290840
DD Form 1423-1, FEB 2001 Page___1__of__2_ Page
LM 18-37
http://cade.osd.mil/tools/evm-tools https://service.cade.osd.mil/DCARCPortal
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 A TDP X TM OTHER _____ ____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued): CDRL A001 Continued.
• Significant changes that require explanations in Format 5 are those that change the absolute value of the projected total staff-months at completion of any organizational or functional category by more than =/-5%.
• Staffing forecast should be by month for the next six months and quarterly thereafter.
12. Format 5 Instructions:
• Format 5 shall address major accomplishments and tasks worked during the month along with major barriers to accomplishing the planned work.
• The variance analysis thresholds are:
o 10% and $25K for current period variances.
o 5% and $100K for cumulative cost variances.
o 5% for at complete variances.
• Narrative explanations required and variance thresholds will be reviewed periodically and may be adjusted by contract modification with no change to contract price.
• Variance analysis narratives shall be reported at the reporting level as determined by the WBS level on Format 1. The narratives also shall:
o Quantify and explain the root cause of the variance and account for at least the majority of the variance amount exceeding the threshold.
o Specific corrective actions, forecasted closure date, and impact to the Estimate at Completion (EAC) shall be included in each variance narrative.
o If there are no changes to the reportable element problem analysis, the expected impacts, or corrective action status, then specify, “no changes since the last reported analysis” and reference the IPMR date when the narrative was reported.
13. Format 6 Instructions: Monthly
14. Format 7 Instructions: Work Breakdown Structure (WBS) elements shall be reported in accordance with the
PMO approved contractually required WBS (BCWS, BCWP, ACWP, SV, CV, BAC, EAC, & VAC).
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Initial Submittal:
Contractor shall submit initial Integrated Program Management Report (IPMR) (Formats 1, 4, 5, 6, & 7) NLT 12th day after the end of the second full accounting period following authorization to proceed (ATP).
Subsequent Submittals:
Contractor shall submit subsequent IPMR, containing the required Formats, NLT 20th business day of each month thereafter. Format 7 is due annually, NLT 20 days after the end of the fiscal year. Final submissions are due when the last significant milestone/deliverable as defined by the contract has been achieved and remaining risk areas have been mitigated. Government will be allowed 10 days, after receipt from contractor, to review comments. Contractor shall submit revised IPMR incorporating Government comments, if applicable, on the following month’s IPMR.
BLOCK 14: Contractor shall submit letter of delivery of IPMR to TopVue https://icbm.topvue.com/topvue-icbm/
DD Form 1423-1, FEB 2001 Page___2__of___2__Page https://icbm.topvue.com/topvue-icbm/
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A002 CONFERENCE AGENDA Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-81249 PWS Para TBD AFNWC/NIAG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
LT ASREQ N/A b. COPIES
a. ADDRESSEE
Draft Final
A N/A N/A
BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Conference Agenda (Meeting Agenda), if applicable, NLT 5 days prior to scheduled meetings or meetings deemed necessary by the Government. Government will be allowed 2 days, after receipt from contractor, to review for approval/disapproval/ comments. Contractor shall submit revised Meeting Agenda incorporating Government comments, if applicable, NLT 2 days after receipt from Government.
BLOCK 14: Contractor shall submit Meeting Agenda to TopVue
ORG2 (Lt of delivery only)
15. TOTAL
3/14/2019
X Nancy N. Baker Nancy N. Baker, GS-12
Tyson S. Pippin, GS-13
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A003 BRIEFING MATERIALS
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81605 PWS Para TBD AFNWC/NIAG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
LT ASREQ SEE BLK 16 b. COPIES
a. ADDRESSEE
Draft Final
N/A N/A N/A
BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Briefing Materials NLT 5 days prior to each scheduled meeting and/or any other meeting deemed necessary by the Government and as requested by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments.
Contractor shall present corrected Briefing Materials incorporating Government comments, if applicable, NLT 2 days after receipt from Government.
BLOCK 14:
Contractor shall submit Briefing Materials to TopVue
3/14/2019
X Nancy N. Baker Nancy N. Baker, GS-12
Tyson S. Pippin, GS-13
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A004
REPORT, RECORD OF MEETING/MINUTES
Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-81505 PWS Para TBD AFNWC/NIAG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
a. ADDRESSEE
Draft Final
A N/A SEE BLK 16
distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Report, Record of Meeting Minutes (Meeting Minutes) NLT 15 days after meeting or event has been held.
Government will be allowed 5 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Minutes incorporating Government comments, if applicable, NLT 5 days after receipt from Government.
BLOCK 14: Contractor shall submit Meeting Minutes to TopVue
3/14/2019
X Nancy N. Baker Nancy N. Baker, GS-12
Tyson S. Pippin, GS-13
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A005 STATEMENT OF WORK (SOW)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81606 PWS Para TBD AFNWC/NIAG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
LT R/ASR SEE BLK 16 b. COPIES
a. ADDRESSEE
Draft Final
A SEE BLK 16 SEE BLK 16
BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Statement of Work (SOW) NLT the 30 days after contract award. Government will be allowed 15 days after receipt from contractor to review for approval/disapproval/comments.
Contractor shall resubmit corrected SOW incorporating Government comments, if applicable, NLT 15 days after receipt from Government.
BLOCK 14: Contractor shall submit SOW to TopVue
3/14/2019
X Nancy N. Baker Nancy N. Baker, GS-12
Tyson S. Pippin, GS-13
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A006
CONTRACT WORK BREAKDOWN
STRUCTURE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81334 PWS Para TBD AFNWC/NIAG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
a. ADDRESSEE
Draft Final
A N/A SEE BLK 16
BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Contract Work Breakdown Structure (CWBS) NLT 30 days after award of contract. Contractor shall submit updated CWBS annually per option period. Government will be allowed 30 days, after receipt from the contractor, to review for comments.
Contractor shall submit revised CWBS incorporating Government comments, if applicable, NLT 15 days after receipt from Government.
BLOCK 14: Contractor shall submit CWBS to TopVue, https://icbm.topvue.com/topvue-icbm/.
3/14/2019
X Nancy N. Baker Nancy N. Baker, GS-12
Tyson S. Pippin, GS-13
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A007 PROGRAM MANAGEMENT PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81797 PWS Para TBD AFNWC/NIAG
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
LT ANNLY SEE BLK 16 b. COPIES
a. ADDRESSEE
Draft Final
BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 4:
1. Delete paragraph 2.c. in its entirety.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Program Management Plan NLT 30 days after award of contract. Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments.
Contractor shall submit updated Program Management Plan incorporating Government comments, if applicable, NLT 30 days after receipt from Government.
BLOCK 14: Contractor shall submit Program Management Plan to TopVue,…