Attach_6_Cross_Reference_Matrix_Amend_1.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Ground Subsystems Sustainment Contract (GSSC) 2. 0 Federal contract opportunity
- Solicitation number
- FA8204-19-R-0001
About this file
This document provides details for the Ground Subsystems Sustainment Contract (GSSC) 2.0 solicitation. The solicitation seeks proposals for sustainment services for ground subsystems including the Inertial Optical Sensor Signal Processor, High Accuracy Control/Range and Missile Performance Evaluator, Codes, Trainers Combat Life Support, and the Ground-based Midcourse Area Surveillance System Combat Life Support. Offerors must submit technical questions by 31 May 2019. To receive the bidder's library CD containing additional details, offerors must request it by sending contact and shipping information to the points of contact listed. Offerors must also ensure an active DoD Activity Address Code is current in the Joint Certification Program website. The selected contractor will provide engineering analysis, manufacturing, and other sustainment services to ensure mission continuity for these critical ground subsystems.
Attachment 6 Cross Reference Matrix Amendment 1
View the file
Other files for this federal contract opportunity
Show all 47
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Matrix
| Factors for Evaluation | Subfactors for Evaluation | Supporting Material / Consideration | Work Requirement | PWS | Section L | Section M | Proposal | |
| Technical Approach/Technical Risk | General/ Compliance - No color rating | BOEs | BOEs written per WBS / Task Order to describe labor category and hours of all work scope captured in the PWS. | N/A | 4.2.1 | 2.5.2 | ||
| Technical Risk | Each Subfactor should identify risks to the Government's approach to each task order including proposed mitigation to defined risks. | N/A | 4.2.3 | 2.2, 2.4 | ||||
| Cross Reference Matrix | Completion of this spreadsheet | N/A | 3.1.1 | 2.5.1.1 | ||||
| Technical Summary of each awardable task order | Summary of the work to be performed, special expertise, knowledge, tools, etc. that gives the offeror an advantage in performing the work. | N/A | 4.2.2 | 2.5.2 | ||||
| Technical Expertise | SME Description | Written Descrption of SMEs, Years of Experience, professional certifications. | ||||||
| All | 4.2.5.1.1 | 2.5.2.1.1.1 | ||||||
| IOSSP Technical Expertise | Detail Program language, familiarity of code, SLOC, and description of processor | Attachment 2 - IOSSP PWS 1.4 | 4.2.5.1.1.2.1 | 2.5.2.1.1.3 | ||||
| HAC/RMPE Technical Expertise | Identify Experience of HAC/RMPE; | |||||||
| Show evidence of required hardware/firmware components and sub-components used for test / Support Equipment to sustain the system | Attachment 3 - HAC/RMPE PWS | |||||||
| 1.4.3 | 4.2.5.1.1.3 | 2.5.2.1.1.4 | ||||||
| Codes Technical Expertise | Provide evidence of its knowledge of CCOS, SACCS, SAP, WMAP or similar systems. | Attachment 4 - Codes PWS | ||||||
| 1.4 | 4.2.5.1.1.4 | 2.5.2.1.1.5 | ||||||
| Trainers CLS | Describe Trainer Maintenance Technical Expertise | Attachment 5 - Trainers CLS PWS | ||||||
| 1.4 | 4.2.5.1.1.5 | 2.5.2.1.2.3 | ||||||
| GMATS CLS | Describe GMATS Technical Expertise | Attachment 6 - GMATS CLS PWS | ||||||
| 1.4 | 4.2.5.1.1.6 | 2.5.2.1.1.5.4 | ||||||
| Recruiting/Retention Plan | Plan will address rentention of experts including subcontractors. Also with task orders include a plan for: | |||||||
| - IOSSP, Trainers CLS, GMATS CLS. | All | 4.2.5.1.2; |
4.2.5.1.2.2;
4.2.5.1.2.3;
4.2.5.1.2.4 2.5.2.1.2;
2.5.2.1.2.2;
2.5.2.1.2.3;
2.5.1.2.4 Technical Skill Mix Provide total hours per completed Section J, Attachment 9, Labor Hours Summary.
Evaluation will consist of:
Task Order 1 - General Sustainment Task Order 2 - IOSSP and, Task Order 3 - HAC/RMPE CLS Attachment 1 - General Sustainment PWS; Attachment 3 - HAC/RMPE PWS; Attachment 4 - Codes PWS; Attachment 5 - Trainers CLS PWS; Attachment 6 - GMATS CLS PWS 4.2.5.1.3;
4.2.5.1.3.1;
4.2.5.1.3.2;
4.2.5.1.3.3 2.5.2.1.3;
2.5.2.1.3.1;
2.5.2.1.3.2;
2.5.2.1.3.3 Transition Transition Plan Transition will cover elements to transition all sustainment data, IP, facilities, equipment, risk, data format, schedule for:
- General Sustainment
- HAC/RMPE
- Codes
- Trainers CLS
| - GMATS | BASIC PWS |
| 2.19 | 4.2.5.2.1; |
4.2.5.2.3;
4.2.5.2.4;
4.2.5.2.5;
4.2.5.2.6 2.5.2.2.1;
2.5.2.2.3;
2.5.2.2.3.2;
2.5.2.2.3.3;
2.5.2.2.3.4
| Program Management | PM Plan | Includes Subcontract Management Plan and Small Business Participation | Attachment 1 - General Sustainment PWS | ||
| 1.4.3 | 4.2.5.3.1; |
4.2.5.3.2;
4.2.5.3.3 2.5.2.3.1;
2.5.2.3.1.1;
2.5.2.3.1.2
30 April 2019
Sheet2
| Factors for Evaluation | Subfactors for Evaluation | Supporting Material / Consideration | Work Requirement | PWS | Section L | Section M | Proposal |
| Technical Expertise | Recruitment and Retention Plan | Plan will address |
- Professional Employee Compensation Plan
- how personnel are grown, promoted and retained
- recruitment
| - maintain technical performance through employee turnover | Attachment 1 - General Sustainment 1.4.3.3.4 | 2.3.1.1 | 2.7.1.1.1 | ||||
| Teaming Arrangements | Demonstrate how the offeror will provide the required level of skills and experience to perform the acquisition and sustainment services for this contract | Attachment 1 General Sustainment 1.4.3.3.4, 1.4.3.3.5, 1.4.10.7; Basic 2.15, 2.16 | 2.3.1.2 | 2.7.1.1.2 | |||
| Data Rights | All data developed, delivered and/or otherwise provided in performance of this contract shall be in accordance with Section J, Attachment 2 titled “Government Rights in Data (GRID)” | ||||||
| Attachment 1 - General Sustainment 1.4.3.4 | 2.3.1.3 | 2.7.1.1.3 | |||||
| Sample Tasks | Sample Task One: GMATS | A) Describe the engineering analysis, strategy, processes, and deliverables the offeror would use for a Service Life Extension (SLE) to ensure adequate oscilloscope support |
B) Outline a plan of action to address the anticipated spares shortfall C) Ensure all Air Force requirements are met
| D) BOEs | Attachment 5 - GMATS 1.4.2 | 2.3.2.1 | 2.7.1.2.1 | |
| Sample Task Two: SELM | A) Describe the engineering analysis, strategy, processes, and deliverables the offeror would use |
B) Ability to manufacture parts based on current drawings C) Ensure all Air Force requirements are met D) BOEs
| Attachment 1 - General Sustainment | ||||
| 1.4.1.1 | 2.3.2.2 | 2.7.1.2.2 | ||
| Sample Task Three: LF | A) Describe the engineering analysis, strategy, processes, and deliverables the offeror would use |
B) Ensure all Air Force requirements are met C) BOEs
| Attachment 1 - General Sustainment | ||||
| 1.4.1.1, 1.4.1.7.5 | 2.3.2.3 | 2.7.1.2.3 | ||
| Sample Task Four: IOSSP | A) Describe the engineering analysis, strategy, processes, and deliverables the offeror would use |
B) Ensure all Air Force requirements are met C) BOEs
| Attachment 2 - IOSSP 1.4.15 | 2.3.2.4 | 2.7.1.2.4 | |
| Sample Task Five: SACCS | A) Describe the engineering analysis, strategy, processes, and deliverables the offeror would use |
B) Provide a schedule that includes a rapid completion plan that will ensure mission continuity C) Ensure all Air Force requirements are met D) BOEs Attachment 6 - SACCS 2.1.4 2.3.2.5 2.7.1.2.5
30 April 2019
File details come from the government source that posted it. Updated .