GSSC_2.0_Answers_to_Industry_Questions_V4.docx

DOCX document 24 KB Posted

Attached to
Ground Subsystems Sustainment Contract (GSSC) 2. 0 Federal contract opportunity
Solicitation number
FA8204-19-R-0001
Issued by
Department of the Air Force Materiel Command

About this file

This document provides answers to industry questions regarding a final solicitation for the Ground Subsystems Sustainment Contract (GSSC) 2.0. The solicitation requests proposals to provide sustainment services for ground subsystem test stations and equipment used by the Department of the Air Force Materiel Command. Key details include that the minimum ordering quantity has been reduced to $8 million due to potential fiscal year 2020 funding constraints. The deadline for offerors to submit technical questions is May 31, 2019. Services include sustaining engineering, equipment replacement, and accomplishing multiple baselines for hardware and missile programmable pulse units. The pricing matrix and references have been updated to correct errors. Travel and material costs are to be proposed separately from the labor rates and budgets included in Table 1 of Section L.

GSSC 2.0 Answers to Industry Questions V4

View the file

Other files for this federal contract opportunity

Other files attached to Ground Subsystems Sustainment Contract (GSSC) 2. 0, newest first.
File Type Posted
GSSC_2.0_Answers_to_Industry_Questions_V7.pdf PDF
Attach_6_Cross_Reference_Matrix_Rev_2.xlsx XLSX spreadsheet
Attach_2c_HAC_RMPE_CLS_GRID_Rev_1.docx DOCX document
Attach_1_Performance_Work_Statements_Rev_2.pdf PDF
Attach_12_GSSC_2_Section_L_Rev_2.pdf PDF
Attach_2a_General_Sustainment_GRID_Rev_1.docx DOCX document
Attach_8_Offeror_Labor_Category_Description_and_Mapping_Rev_1.xlsx XLSX spreadsheet
Attach_2g_ALCS_Sustainment_GRID_Rev_1.docx DOCX document
FA820419R0001_______0002.pdf PDF
Attach_2e_GMATS_CLS_GRID_Rev_1.docx DOCX document
Attach_2b_IOSSP_Sustainment_GRID_Rev_1.docx DOCX document
Attach_2f_SACCS_CLS_GRID_Rev_1.docx DOCX document
Attach_14_TEP_Workbook_Rev_2.xlsx XLSX spreadsheet
GSSC_2.0_Answers_to_Industry_Questions_V6.pdf PDF
Attach_2d_Trainers_CLS_GRID_Rev_1.docx DOCX document
Answers_to_Industry_V5.pdf PDF
Attach_10_Labor_Rate_Matrix_Amend_1.xlsx XLSX spreadsheet
Attach_5_Pricing_Matrix_Amend_1.xlsx XLSX spreadsheet
Attach_14_TEP_Workbook_Amend_1.xlsx XLSX spreadsheet
Attach_6_Cross_Reference_Matrix_Amend_1.xlsx XLSX spreadsheet
Attach_12_GSSC_2_Section_L_Rev1.pdf PDF
Attach_1_Performance_Work_Statements_Rev1.pdf PDF
FA820419R0001_______0001.pdf PDF
Attach_1_Performance_Work_Statements.pdf PDF
Attach_5_Pricing_Matrix.xlsx XLSX spreadsheet
Attach_14_TEP_Workbook.xlsx XLSX spreadsheet
Attach_7_Government_Labor_Category_Description.docx DOCX document
Attach_8_Offeror_Labor_Category_Description_and_Mapping.xlsx XLSX spreadsheet
Attach_3a_GSSC_GFP_List.pdf PDF
Attach_11_DD254.pdf PDF
FA820419R0001.pdf PDF
Attach_2e_GMATS_CLS_GRID.docx DOCX document
Attach_12_GSSC_2_Section_L.pdf PDF
Attach_2a_General_Sustainment_GRID.docx DOCX document
Attach_13_GSSC_2_Section_M.pdf PDF
Exhibit_A_CDRL_Package.pdf PDF
Attach_2f_SACCS_CLS_GRID.docx DOCX document
Attach_2g_ALCS_Sustainment_GRID.docx DOCX document
Attach_4_Award_Fee_Plan.pdf PDF
Attach_6_Cross_Reference_Matrix.xlsx XLSX spreadsheet
GSSC_2.0_Answers_to_Industry_Questions_V3.docx DOCX document
Attach_2b_IOSSP_Sustainment_GRID.docx DOCX document
Attach_3b_ALCS_GFP_List.pdf PDF
Attach_9_Labor_Hours_Summary.xlsx XLSX spreadsheet
Attach_2c_HAC_RMPE_CLS_GRID.docx DOCX document
Attach_10_Labor_Rate_Matrix.xlsx XLSX spreadsheet
Attach_2d_Trainers_CLS_GRID.docx DOCX document
Show all 47

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSSC 2.0

Answers to Industry Questions to RFP Release Posted 17 April 2019

1) The CLINs on Attachment 5, Pricing Matrix DO tie to Section B of the model contract. The CLIN structure for the Awardable Task Orders in Section J, Attachment 5 have the same CLIN structure for each ordering period because they are annual Task Orders. A new Task Order will be issued each year for those tasks. The CLIN tables found within each CLIN of the model contract will apply only to, and guide the structuring of, add-on Task Orders that are multiple-year and have options.

As an example, assume during Ordering Period Two (2021) of the base contract period, a Task Order is awarded for the production of a component of a Grounds Subsystem. Also assume that the period of performance of this task is three years and each year is an option. Because it contains options, the CLIN tables would be applied to this Task Order. Using CLIN 0005 as an example, the CLIN number for the base year would be 0005, for option year 1, the CLIN number would be 0105, and for option year 2, the CLIN number would be 0205.

If this same Task Order were awarded during Option Period 1 of the contract, the CLIN structure would be 1005 for the basic, 1105 for option year 1, and 1205 for option year 2.

2) Offeror’s are advised to carefully read the verbiage under CLIN 0005 of the model contract. The verbiage under CLIN 0005 allow for additional ‘Work Scope’ CLINs to be added to an individual Task Order (CLIN 0006, 0007, 0008, etc.) as required per the needs of that Task Order. The verbiage in CLIN 0005 also allows for the contract type of the ‘Work Scope’ CLINs on an individual Task Order to be any of the contract types listed in the verbiage of CLIN 0005 to fit the needs of that given Task Order.

3) The minimum ordering quantity of the contract has been changed from $19,300,000.00 to $8,000,000.00. This is due to potential funding constraints in FY2020 and the ordering periods crossing fiscal years.

4) The GMATS PWS Paragraph 1.4.2 has been updated to clarify the scope of Sustaining Engineering in relation to this Task Order.

5) After further discussion with the HAC/RMPE Program Office, CLIN 0006 under HAC/RMPE on Section J, Attachment 5, Pricing Matrix, has been re-named to ‘Multiple Baseline - MMPU’ and is now only applied to Ordering Periods 1 and 2. This purpose of CLIN 0006 is to accomplish the scope of Paragraph 1.4.5 of the HAC/RMPE PWS titled ‘Multiple Baselines’. As additional ‘multiple baseline’ requirements become realized during execution of the contract, the cost of this in-scope work will be negotiated and be added either as a modification to the HAC/RMPE Task Order or as a separate Task Order on the contract.

6) After further discussion with the GMATS Program Office, CLIN 0007 under GMATS on Section J, Attachment 5, Pricing Matrix has been removed. It was determined that having a separate Spares CLIN created a redundancy with the test station equipment replacement requirement under Sustaining Engineering (PWS Paragraph 1.4.2) that would be covered under CLIN 0006.

7) The Ordering Periods under the ‘Option Period 2’ Tab of Section J, Attachment 5, Pricing Matrix, has been corrected be Ordering Periods 11, 12, 13, 14, and 15. They were erroneously listed as Ordering Periods 6, 7, 8, 9, and 10 which are the Ordering Period numbers for Option Period 1.

8) Line B36 under the ‘Option Period 3’ Tab of Section J, Attachment 5, Pricing Matrix, has been corrected to add the title, ‘SACCS SUSTAINMENT’.

9) Section J, Attachment 6, Cross Reference Matrix, has been corrected to be mapped to the current version of Sections L & M. They were erroneously mapped to the Draft versions of these documents on the final solicitation.

10) The instruction in Section J, Attachment 10, Labor Rate Matrix; and Section J, Attachment 14, TEP have been updated to clarify that these sheets shall be filled in with the offeror’s proposed labor categories.

11) Paragraph 1.3 in Section L has been corrected to clarify that the budget amounts in Table 1 include all cost elements EXCEPT Travel and Material. These two cost elements will be bid in accordance with Section L, Paragraph 3.2.2.

File details come from the government source that posted it. Updated .