FA8201-11-R-0008 Amendment 2 SF30.pdf

PDF 96 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA8201-11-R-0008
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

FA8201-11-R-0008 Amendment 2 SF30.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Attachment 11 - B-517 Contractor Cost Schedule Updated 11 May 2012.xlsx XLSX spreadsheet
Hill AFB Bldg 518_5-7-10_Conductivity report.pdf PDF
Hill AFB Bldg 518 - TC Drilling Log.pdf PDF
MACC II Questions and Answers updated 23 April 2012.pdf PDF
Attachment 14 - UFGS 01 45 00.00 10.pdf PDF
MACC II Questions and Answers updated 17 April 2012.pdf PDF
Attachment 32 - B-517 Utility Map.pdf PDF
Attachment 2 - 01 00 00 General Requirements.pdf PDF
Attachment 19 - Weber County - General Decision No. UT20100046 - 6 Jan 2012.pdf PDF
Attachment 23 - B-518 Specs Div 02 thru Div 23.pdf PDF
Attachment 5 - 01 45 04 CQC.pdf PDF
Attachment 25 - B-518 Plans General.pdf PDF
Attachment 29 - B-518 Plans Mechanical.pdf PDF
Attachment 9 - Architectural Compatibility Standard.pdf PDF
Attachment 18 - Davis County - General Decision No. UT20100037 - 6 Jan 2012.pdf PDF
Attachment 10 - AFI32-10141.pdf PDF
Attachment 11 - B-517 Contractor Cost Schedule.xlsx XLSX spreadsheet
Attachment 22 - B-518 Specs Div 01.pdf PDF
BLDG 517 47.pdf PDF
BLDG 517 56.pdf PDF
B-518 Plans Structural.pdf PDF
BLDG 517 15.pdf PDF
BLDG 517 24.pdf PDF
BLDG 517 14.pdf PDF
B-517 SOW 20120119.rtf RTF text file
BLDG 517 37.pdf PDF
B-518 Specs Div 02 thru Div 23.pdf PDF
BLDG 517 26.pdf PDF
B-518 Specs Div 26 thru Div 33.pdf PDF
BLDG 517 54.pdf PDF
BLDG 517 49.pdf PDF
BLDG 517 41.pdf PDF
BLDG 517 19.pdf PDF
BLDG 517 63.pdf PDF
BLDG 517 34.pdf PDF
BLDG 517 59.pdf PDF
BLDG 517 28.pdf PDF
BLDG 517 03.pdf PDF
BLDG 517 18.pdf PDF
01 00 00 General Requirements.docx DOCX document
BLDG 517 27.pdf PDF
B-518 Plans General.pdf PDF
B-518 Plans Architectural.pdf PDF
BLDG 517 25.pdf PDF
BLDG 517 10.pdf PDF
BLDG 517 50.pdf PDF
BLDG 517 62.pdf PDF
BLDG 517 20.pdf PDF
MACC List of Attendees - Posted to FedBizOpps.xlsx XLSX spreadsheet
MACC Industry Day Rules of Engagement.docx DOCX document
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate the As-Built Draw ings for Building 517 as w ell as the Utility Map for Building 517. Section J has been updated to reflect these additions. Additionally, this amendment clarif ies Liquidated Damages for the Seed Project in Clause

52.211-12.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Apr-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8201-11-R-0008

X 9B. DATED (SEE ITEM 11)

03-Apr-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Apr-2012

CODE

OO-ALC/PKOB

LT ERIC UNDERWOOD 6038 ASPEN AVE B1289NE

HILL AFB UT 84056-5805

FA8201 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8201-11-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in an amount TO BE DETERMINED AT THE TASK ORDER LEVEL for each calendar day of delay until the work is completed or accepted. Liquidated damages for the Seed Project are

$184.07.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

CLAUSES INCORPORATED BY FULL TEXT

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

(All listed attachments are at the end of this document)

ATCH NO. TITLE DESCRIPTION DATE PAGE(S)

BASIC CONTRACT

Atch 1 Multiple Award Construction

Contract (MACC) II SOW

Statement of Work 2/2012 20

Atch 2 Section 01 00 00 General Requirements 8/2011 22

Atch 3 Section 01 32 00 Project Schedule 8/2011 5

Atch 4 Section 01 35 26 Governmental Safety Requirements 8/2011 23

Atch 5 Section 01 45 04 Contractor Quality Control 6/2011 16

Atch 6 Section 01 57 20 Environmental Protection 08/2011 19

Atch 7 Base Facility Design Standard Hill AFB Standards 11/15/2011 74

Atch 8 AF Sustainable Design and

Development Implementing

Guide

AF Special Instruction 6/2/2011 62

Atch 9 Architectural Compatibility

Standards

Hill AFB Standard 4/2006 46

Atch 10 AFI 32-10141 Planning and Programming Fire

Safety Deficiency Correction Projects

3/3/2011 30

Atch 11 AF Form 3052 Detail Cost Estimate Final Submittal ND 2

Atch 12 EM 385-1-1

Safety and Health Requirements Latest edition

1,045

Atch 13 National Fire Protection

Association 13

Standard for the installation of sprinkler systems

2010 425

Atch 14 UFGS 01 45 00.00 20 Unified Facilities Guide

Specifications

11/2011 29

Atch 15 Past Performance Information

Sheet

ND 1

Atch 16 Standard Form 330 Architect – Engineer Qualifications Jun 2004 14

Atch 17 General Decision Number

UT20100048

Davis Bacon Wage Determination, Box Elder County, UT

6 Jan 2012 5

Atch 18 General Decision Number

UT20100037

Davis Bacon Wage Determination, Davis County, UT

6 Jan 2012 6

Atch 19 General Decision Number

UT20100046

Davis Bacon Wage Determination, Weber County, UT

6 Jan 2012 6

SEED PROJECT

Atch 20 Statement of Work: KRSM

080100

Repair by Adaptive Reuse Dorm to

Admin Off B-517

1/19/2012 5

Atch 21 Index of Drawings: KRSM

112011A-B

8/22/2011 1

Atch 22 B-518 Specs Division 01 Sections 01 11 00 through 01 91 13 As indicated per section

Atch 23 B-518 Specs Divisions 02 through 23

Sections 02 41 00 through 23 83 00.00

As indicated

Atch 24 B-518 Specs Divisions 26 through 33

Sections 26 00 00.00 20 through 33 11

As indicated

Atch 25 B-518 Plans General Drawings 1 through 6 of 141 8/22/2011 6

Atch 26 B-518 Plans Civil Drawings 7 through 11 of 141 8/22/2011 5

Atch 27 B-518 Plans Structural Drawings 12 through 32 of 141 8/22/2011 21

Atch 28 B-518 Plans Architectural Drawings 33 through 77 of 141 8/22/2011 45

Atch 29 B-518 Plans Mechanical Drawings 78 through 96 of 141 8/22/2011 22

Atch 30 B-518 Plans Electrical Drawings 97 through 141 of 141 8/22/2011 46

Atch 31 B-517 As-Built Drawings Drawings 1 through 63 11/15/1983 63

Atch 32 B-517 Utility Map Building 517 Utility Map April 2012 1

**********************************LAST ITEM*********************************

(End of Summary of Changes)