FA8201-11-R-0008 Amendment 2 SF30.pdf
PDF 96 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA8201-11-R-0008
About this file
FA8201-11-R-0008 Amendment 2 SF30.
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the As-Built Draw ings for Building 517 as w ell as the Utility Map for Building 517. Section J has been updated to reflect these additions. Additionally, this amendment clarif ies Liquidated Damages for the Seed Project in Clause
52.211-12.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Apr-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8201-11-R-0008
X 9B. DATED (SEE ITEM 11)
03-Apr-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Apr-2012
CODE
OO-ALC/PKOB
LT ERIC UNDERWOOD 6038 ASPEN AVE B1289NE
HILL AFB UT 84056-5805
FA8201 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA8201-11-R-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in an amount TO BE DETERMINED AT THE TASK ORDER LEVEL for each calendar day of delay until the work is completed or accepted. Liquidated damages for the Seed Project are
$184.07.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
CLAUSES INCORPORATED BY FULL TEXT
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
(All listed attachments are at the end of this document)
ATCH NO. TITLE DESCRIPTION DATE PAGE(S)
BASIC CONTRACT
Atch 1 Multiple Award Construction
Contract (MACC) II SOW
Statement of Work 2/2012 20
Atch 2 Section 01 00 00 General Requirements 8/2011 22
Atch 3 Section 01 32 00 Project Schedule 8/2011 5
Atch 4 Section 01 35 26 Governmental Safety Requirements 8/2011 23
Atch 5 Section 01 45 04 Contractor Quality Control 6/2011 16
Atch 6 Section 01 57 20 Environmental Protection 08/2011 19
Atch 7 Base Facility Design Standard Hill AFB Standards 11/15/2011 74
Atch 8 AF Sustainable Design and
Development Implementing
Guide
AF Special Instruction 6/2/2011 62
Atch 9 Architectural Compatibility
Standards
Hill AFB Standard 4/2006 46
Atch 10 AFI 32-10141 Planning and Programming Fire
Safety Deficiency Correction Projects
3/3/2011 30
Atch 11 AF Form 3052 Detail Cost Estimate Final Submittal ND 2
Atch 12 EM 385-1-1
Safety and Health Requirements Latest edition
1,045
Atch 13 National Fire Protection
Association 13
Standard for the installation of sprinkler systems
2010 425
Atch 14 UFGS 01 45 00.00 20 Unified Facilities Guide
Specifications
11/2011 29
Atch 15 Past Performance Information
Sheet
ND 1
Atch 16 Standard Form 330 Architect – Engineer Qualifications Jun 2004 14
Atch 17 General Decision Number
UT20100048
Davis Bacon Wage Determination, Box Elder County, UT
6 Jan 2012 5
Atch 18 General Decision Number
UT20100037
Davis Bacon Wage Determination, Davis County, UT
6 Jan 2012 6
Atch 19 General Decision Number
UT20100046
Davis Bacon Wage Determination, Weber County, UT
6 Jan 2012 6
SEED PROJECT
Atch 20 Statement of Work: KRSM
080100
Repair by Adaptive Reuse Dorm to
Admin Off B-517
1/19/2012 5
Atch 21 Index of Drawings: KRSM
112011A-B
8/22/2011 1
Atch 22 B-518 Specs Division 01 Sections 01 11 00 through 01 91 13 As indicated per section
Atch 23 B-518 Specs Divisions 02 through 23
Sections 02 41 00 through 23 83 00.00
As indicated
Atch 24 B-518 Specs Divisions 26 through 33
Sections 26 00 00.00 20 through 33 11
As indicated
Atch 25 B-518 Plans General Drawings 1 through 6 of 141 8/22/2011 6
Atch 26 B-518 Plans Civil Drawings 7 through 11 of 141 8/22/2011 5
Atch 27 B-518 Plans Structural Drawings 12 through 32 of 141 8/22/2011 21
Atch 28 B-518 Plans Architectural Drawings 33 through 77 of 141 8/22/2011 45
Atch 29 B-518 Plans Mechanical Drawings 78 through 96 of 141 8/22/2011 22
Atch 30 B-518 Plans Electrical Drawings 97 through 141 of 141 8/22/2011 46
Atch 31 B-517 As-Built Drawings Drawings 1 through 63 11/15/1983 63
Atch 32 B-517 Utility Map Building 517 Utility Map April 2012 1
**********************************LAST ITEM*********************************
(End of Summary of Changes)
File details come from the government source that posted it. Updated .