Attachment 5 - 01 45 04 CQC.pdf

PDF 1 MB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA8201-11-R-0008
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 5

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Attachment 11 - B-517 Contractor Cost Schedule Updated 11 May 2012.xlsx XLSX spreadsheet
Hill AFB Bldg 518_5-7-10_Conductivity report.pdf PDF
Hill AFB Bldg 518 - TC Drilling Log.pdf PDF
MACC II Questions and Answers updated 23 April 2012.pdf PDF
Attachment 14 - UFGS 01 45 00.00 10.pdf PDF
MACC II Questions and Answers updated 17 April 2012.pdf PDF
Attachment 32 - B-517 Utility Map.pdf PDF
Attachment 2 - 01 00 00 General Requirements.pdf PDF
Attachment 19 - Weber County - General Decision No. UT20100046 - 6 Jan 2012.pdf PDF
Attachment 23 - B-518 Specs Div 02 thru Div 23.pdf PDF
Attachment 25 - B-518 Plans General.pdf PDF
Attachment 29 - B-518 Plans Mechanical.pdf PDF
Attachment 9 - Architectural Compatibility Standard.pdf PDF
Attachment 18 - Davis County - General Decision No. UT20100037 - 6 Jan 2012.pdf PDF
Attachment 10 - AFI32-10141.pdf PDF
Attachment 11 - B-517 Contractor Cost Schedule.xlsx XLSX spreadsheet
Attachment 22 - B-518 Specs Div 01.pdf PDF
BLDG 517 47.pdf PDF
BLDG 517 56.pdf PDF
B-518 Plans Structural.pdf PDF
BLDG 517 15.pdf PDF
BLDG 517 24.pdf PDF
BLDG 517 14.pdf PDF
B-517 SOW 20120119.rtf RTF text file
BLDG 517 37.pdf PDF
B-518 Specs Div 02 thru Div 23.pdf PDF
BLDG 517 26.pdf PDF
B-518 Specs Div 26 thru Div 33.pdf PDF
BLDG 517 54.pdf PDF
BLDG 517 49.pdf PDF
BLDG 517 41.pdf PDF
BLDG 517 19.pdf PDF
BLDG 517 63.pdf PDF
BLDG 517 34.pdf PDF
BLDG 517 59.pdf PDF
BLDG 517 28.pdf PDF
BLDG 517 03.pdf PDF
BLDG 517 18.pdf PDF
01 00 00 General Requirements.docx DOCX document
BLDG 517 27.pdf PDF
B-518 Plans General.pdf PDF
B-518 Plans Architectural.pdf PDF
BLDG 517 25.pdf PDF
BLDG 517 10.pdf PDF
BLDG 517 50.pdf PDF
BLDG 517 62.pdf PDF
BLDG 517 20.pdf PDF
BLDG 517 36.pdf PDF
MACC List of Attendees - Posted to FedBizOpps.xlsx XLSX spreadsheet
MACC Industry Day Rules of Engagement.docx DOCX document
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KRSM112011 HILL AIR FORCE BASE JUNE 2011

SECTION 01 45 04 Page 1 of 16

SECTION 01 45 04

CONTRACTOR QUALITY CONTROL

PART 1 GENERAL

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with the Contract Clause titled "Inspection of Construction." The quality control system shall consist of plans, procedures, and organization necessary to produce an end product which complies with the contract requirements. The system shall cover all construction operations, both onsite and offsite, and shall be keyed to the proposed construction sequence. The project superintendent will be held responsible for the quality of work on the job and is subject to removal by the Contracting Officer for non-compliance with quality requirements specified in the contract. The project superintendent in this context shall mean the individual with the responsibility for the overall management of the project including quality and production.

3.2 DESIGN QUALITY CONTROL (Not Applicable)

3.3 COORDINATION MEETING

After the Preconstruction Conference, before start of construction, and prior to acceptance by the Government of the CQC Plan, the Contractor shall meet with the Contracting Officer or Authorized Representative and discuss the Contractor's quality control system. The CQC Plan shall be submitted for review a minimum of 14 calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the CQC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting shall be prepared by the Government and signed by both the Contractor and the Contracting Officer. The minutes shall become a part of the contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the CQC system or procedures which may require corrective action by the Contractor.

3.4 QUALITY CONTROL ORGANIZATION

3.4.1 Personnel Requirements

The requirements for the CQC organization are a CQC System Manager and sufficient number of additional qualified personnel to ensure contract compliance. The Contractor shall provide a CQC organization which shall be

SECTION 01 45 04 Page 2 of 16 at the site at all times during progress of the work and with complete authority to take any action necessary to ensure compliance with the contract. All CQC staff members shall be subject to acceptance by the Contracting Officer.

3.4.2 CQC System Manager

The Contractor shall identify as CQC System Manager an individual within his organization at the site of the work who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. The CQC System Manager shall be a construction person , with a 4 year degree in Construction Management or Engineering, plus a minimum of 5 years construction experience on construction similar to this contract. This CQC System Manager shall be on the site at all times during construction and will be employed by the prime Contractor. The CQC System Manager shall be assigned no other duties. An alternate for the CQC System Manager will be identified in the plan to serve in the event of the System Manager's absence. The requirements for the alternate will be the same as for the designated CQC System Manager.

3.4.3 CQC Personnel

In addition to CQC personnel specified elsewhere in the contract, the Contractor shall provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: civil, mechanical, electrical and structural. These individuals shall be directly employed by the prime Contractor and may not be employed by a supplier or subcontractor on this contract and shall be responsible to the CQC System Manager; be physically present at the construction site during work on their areas responsibility; have necessary education and/or experience in accordance with the experience matrix listed herein. These individuals shall have no other duties other than quality control.

EXPERIENCE MATRIX

Area Minimum Qualifications

a. Civil Graduate Civil Engineer with 2 years experience in the type of work being performed on this project or technician with 5 years related experience

b. Mechanical Graduate Mechanical Engineer with 2 years experience or person with 5 yrs related experience

c. Electrical Graduate Electrical Engineer with 2 years experience or person with 5 yrs related experience

d. Structural Graduate Structural Engineer with 2 years experience or person with 5 yrs related experience

3.4.4 Additional Requirement

SECTION 01 45 04 Page 3 of 16

In addition to the above experience and/or education requirements the CQC System Manager shall have completed the course entitled "Construction Quality Management For Contractors". This course is periodically offered by the Sacramento District, contact the Contracting Officer for more information.

3.5 SUBMITTALS AND DELIVERABLES

Submittals, if needed, shall be made as specified in Section 01 33 00 SUBMITTAL PROCEDURES. The CQC organization shall be responsible for certifying that all submittals and deliverables are in compliance with the contract requirements.

3.6 CONTROL

Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control shall be conducted by the CQC System Manager for each definable feature of work as follows:

3.6.1 Preparatory Phase

This phase shall be performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase shall include:

a. A review of each paragraph of applicable specifications, reference codes, and standards. A copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field shall be made available by the Contractor at the preparatory inspection. These copies shall be maintained in the field and available for use by Government personnel until final acceptance of the work.

b. A review of the contract drawings.

c. A check to assure that all materials and/or equipment have been tested, submitted, and approved.

d. Review of provisions that have been made to provide required control inspection and testing.

e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract.

f. A physical examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.

g. A review of the appropriate activity hazard analysis to assure safety requirements are met.

h. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship ronald.spagnuolo Cross-Out ronald.spagnuolo Cross-Out

SECTION 01 45 04 Page 4 of 16 standards for that feature of work.

i. A check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.

j. Discussion of the initial control phase.

k. The Government shall be notified at least 48 hours in advance of beginning the preparatory control phase. This phase shall include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. The results of the preparatory phase actions shall be documented by separate minutes prepared by the CQC System Manager and attached to the daily CQC report. The Contractor shall instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.

3.6.2 Initial Phase

This phase shall be accomplished at the beginning of a definable feature of work. The following shall be accomplished:

a. A check of work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.

b. Verify adequacy of controls to ensure full contract compliance. Verify required control inspection and testing.

c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.

d. Resolve all differences.

e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.

f. The Government shall be notified at least 48 hours in advance of beginning the initial phase. Separate minutes of this phase shall be prepared by the CQC System Manager and attached to the daily CQC report.

Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.

g. The initial phase should be repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.

3.6.3 Follow-up Phase

Daily checks shall be performed to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. The checks shall be made a matter of record in the CQC documentation. Final follow-up checks shall be conducted and all deficiencies corrected prior

SECTION 01 45 04 Page 5 of 16 to the start of additional features of work which may be affected by the deficient work. The Contractor shall not build upon nor conceal non-conforming work.

3.6.4 Additional Preparatory and Initial Phases

Additional preparatory and initial phases shall be conducted on the same definable features of work if: the quality of on-going work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision or work crew; if work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.

3.7 TESTS

3.7.1 Testing Procedure

The Contractor shall perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements. Upon request, the Contractor shall furnish to the Government duplicate samples of test specimens for possible testing by the Government. Testing includes operation and/or acceptance tests when specified. The Contractor shall procure the services of an independent commercial laboratory that has been approved by the Resident Engineer. In addition, the laboratory shall be submitted as part of the Contractor=s Quality Control Plan and approved by the Contracting Officer. The Contractor shall perform the following activities and record and provide the following data:

a. Verify that testing procedures comply with contract requirements.

b. Verify that facilities and testing equipment are available and comply with testing standards.

c. Check test instrument calibration data against certified standards.

d. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.

e. Results of all tests taken, both passing and failing tests, shall be recorded on the CQC report for the date taken. Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test shall be given. If approved by the Contracting Officer, actual test reports may be submitted later with a reference to the test number and date taken. An information copy of tests performed by an offsite or commercial test facility shall be provided directly to the Contracting Officer. Failure to submit timely test reports as stated may result in nonpayment for related work performed and disapproval of the test facility for this contract.

3.7.2 Testing Laboratories

3.7.2.1 Capability Check

SECTION 01 45 04 Page 6 of 16

The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques. Laboratories utilized for testing soils, concrete, asphalt, and steel shall meet criteria detailed in ASTM D 3740, ASTM C 1077 , ASTM D 3666 and ASTM E 329 as applicable.

The Contractor shall use an independent commercial laboratory that has been validated by abbreviated audit by the Corps of Engineers, Materials Testing Center (MTC), for the required test methods. To receive validation by abbreviated audit by the MTC, the laboratory shall complete the required form and submit copies of its AASHTO accreditation certificate, applicable AMRL and/or CCRL inspection reports, and responses to any deficiencies to the MTC no later than 7 days after the Notice to Proceed.

The cost for the validation by the MTC shall be the responsibility of the Contractor.

Any on-site laboratory that is used by the Contractor will require a separate validation by this MTC. All costs associated with this validation will be the responsibility of the Contractor.

The above information shall also be submitted for Government Approval as part of the Contractor's Quality Control Plan. No materials testing shall be performed until the laboratory has been validated by the MTC and approved by the Resident Engineer. Further information regarding laboratory validation can be obtained by visiting http://www.wes.army.mil/SL/MTC/LabValSteps.htm

3.7.2.2 Quality Assurance Check

.The inspection report(s) and the written response(s) to any noted deficiencies shall be included with the Contractor Quality Control Plan and will be subject to approval by the Resident Engineer.

The Government reserves the right to perform a quality assurance check of the laboratory equipment and procedures.

3.7.3 Onsite Laboratory

The Government reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests, and to check the Contractor's testing procedures, techniques, and test results at no additional cost to the Government.

3.7.4 Furnishing or Transportation of Samples for Testing

Costs incidental to the transportation of samples or materials will be borne by the Contractor. Samples of materials for test verification and acceptance testing by the Government shall be delivered to the QA laboratory designated by the Contracting Officer.

Coordination for each specific test, exact delivery location and dates will be made through the Area Office.

SECTION 01 45 04 Page 7 of 16

3.8 COMPLETION INSPECTION

3.8.1 Punch-Out Inspection

Near the end of the work, or any increment of the work established by a time stated in the Special Clause, "Commencement, Prosecution, and Completion of Work", or by the specifications, the CQC Manager shall conduct an inspection of the work. A punch list of items which do not conform to the approved drawings and specifications shall be prepared and included in the CQC documentation, as required by paragraph DOCUMENTATION.

The list of deficiencies shall include the estimated date by which the deficiencies will be corrected. The CQC System Manager or staff shall make a second inspection to ascertain that all deficiencies have been corrected. Once this is accomplished, the Contractor shall notify the Government that the facility is ready for the Government Pre-Final inspection.

3.8.2 Pre-Final Inspection

The Government will perform the pre-final inspection to verify that the facility is complete and ready to be occupied. A Government Pre-Final Punch List may be developed as a result of this inspection. The Contractor's CQC System Manager shall ensure that all items on this list have been corrected before notifying the Government, so that a Final inspection with the customer can be scheduled. Any items noted on the Pre- Final inspection shall be corrected in a timely manner. These inspections and any deficiency corrections required by this paragraph shall be accomplished within the time slated for completion of the entire work or any particular increment of the work if the project is divided into increments by separate completion dates.

3.8.3 Final Acceptance Inspection

The Contractor's Quality Control Inspection personnel, plus the superintendent or other primary management person, and the Contracting Officer's Representative shall be in attendance at the final acceptance inspection. Additional Government personnel including, but not limited to, those from Base/Post Civil Facility Engineer user groups, and major commands may also be in attendance. The final acceptance inspection will be formally scheduled by the Contracting Officer based upon results of the Pre-Final inspection. Notice shall be given to the Contracting Officer at least 14 days prior to the final acceptance inspection and shall include the Contractor's assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date scheduled for the final acceptance inspection. Failure of the Contractor to have all contract work acceptably complete for this inspection will be cause for the Contracting Officer to bill the Contractor for the Government's additional inspection cost in accordance with the contract clause titled "Inspection of Construction".

3.9 DOCUMENTATION

The Contractor shall maintain current records providing factual evidence that required quality control activities and/or tests have been

SECTION 01 45 04 Page 8 of 16 performed. These records shall include the work of subcontractors and suppliers and shall be on an acceptable form that includes, as a minimum, the following information:

a. Contractor/subcontractor and their area of responsibility.

b. Operating plant/equipment with hours worked, idle, or down for repair.

c. Work performed each day, giving location, description, and by whom.

When Network Analysis (NAS) is used, identify each phase of work performed each day by NAS activity number.

d. Test and/or control activities performed with results and references to specifications/drawings requirements. The control phase shall be identified (Preparatory, Initial, Follow-up). List deficiencies noted, along with corrective action.

e. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications/drawings equirements.

f. Submittals and deliverables reviewed, with contract reference, by whom, and action taken.

g. Off-site surveillance activities, including actions taken.

h. Job safety evaluations stating what was checked, results, and instructions or corrective actions.

i. Instructions given/received and conflicts in plans and/or specifications.

j. Contractor's verification statement.

These records shall indicate a description of trades working on the project; the number of personnel working; weather conditions encountered;

and any delays encountered. These records shall cover both conforming and deficient features and shall include a statement that equipment and materials incorporated in the work and workmanship comply with the contract. The original and one copy of these records in report form shall be furnished to the Government daily within 24 hours after the date covered by the report, except that reports need not be submitted for days on which no work is performed. As a minimum, one report shall be prepared and submitted for every 7 days of no work and on the last day of a no work period. All calendar days shall be accounted for throughout the life of the contract. The first report following a day of no work shall be for that day only. Reports shall be signed and dated by the CQC System Manager. The report from the CQC System Manager shall include copies of test reports and copies of reports prepared by all subordinate quality control personnel.

3.10 SAMPLE FORMS

Sample forms enclosed at the end of this section.

SECTION 01 45 04 Page 9 of 16

1. Test Report Form

2. Daily Contractor Quality Control Form

3. Preparatory Inspection Report Form

4. SPK 437 -Materials Test Summary

3.11 NOTIFICATION OF NONCOMPLIANCE

The Contracting Officer will notify the Contractor of any detected noncompliance with the foregoing requirements. The Contractor shall take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, shall be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders shall be made the subject of claim for extension of time or for excess costs or damages by the Contractor.

--End of Section -

SECTION 01 45 04 Page 10 of 16

SECTION 01 45 04 Page 11 of 16

SECTION 01 45 04 Page 12 of 16

SECTION 01 45 04 Page 13 of 16

SECTION 01 45 04 Page 14 of 16

SECTION 01 45 04 Page 15 of 16

SECTION 01 45 04 Page 16 of 16

File details come from the government source that posted it. Updated .